Powered By Kitlog Pro v2.0
Chris's RV-14A Site
RV-14A
Wings
Work Logs Found:
100
Category Work Time:
504 Hours
Date
Hours
Work Log Summary
Details
10-11-2017
3.00
Replace molex connectors in wing tips
Details
09-25-2017
6.00
FlyLeds
Details
09-23-2017
8.00
Left wing tip
Details
09-22-2017
7.00
Right wing tip
Details
09-21-2017
3.00
Trim wing tip and sand seam
Details
09-20-2017
3.00
Final attach pushrods
Details
09-15-2017
2.00
New wing cart
Details
09-08-2017
2.00
Fit right wing tip
Details
09-07-2017
7.00
Wing tips
Details
09-06-2017
6.00
Aileron pushrods and trim
Details
09-05-2017
7.00
Bottom right wing skin
Details
09-04-2017
8.00
Finish left wing and start right bottom
Details
09-03-2017
6.00
Left wing bottom outer skin
Details
09-02-2017
8.00
Bottom left wing skin
Details
08-28-2017
8.00
Aileron torque tubes
Details
08-27-2017
4.00
AP roll servo and OAT probe
Details
08-26-2017
6.00
Magnetometer mount and wire lacing
Details
08-25-2017
6.00
Pitot mast mount and prime bottom skins
Details
08-24-2017
7.00
Right landing light and bottom wing skins
Details
08-23-2017
8.00
Attach right tank
Details
08-22-2017
5.00
Wiring in wings
Details
08-21-2017
6.00
Attach left tank
Details
08-18-2017
6.00
Prepare tank for wing attachment
Details
08-17-2017
6.00
Install aileron bellcranks
Details
08-16-2017
6.00
Wing wiring harness
Details
08-15-2017
5.00
Completing the wings
Details
07-01-2017
4.00
Retest tanks with manometer
Details
09-23-2016
2.00
Install SB aileron brackets
Details
09-22-2016
4.00
Aileron bracket service bulletin
Details
07-05-2016
6.00
Finish left tank close out
Details
07-04-2016
6.00
Close out right tank
Details
06-30-2016
5.00
Assemble right flap
Details
06-27-2016
3.00
Left flap trailing edge
Details
06-26-2016
7.00
Left flap assembly
Details
06-25-2016
7.00
Tank leak and Flaps part deux
Details
06-24-2016
3.00
Right tank leak check
Details
06-23-2016
6.00
Install fuel level senders and test left tank
Details
06-22-2016
5.00
Right tanks
Details
06-21-2016
4.00
Right tank assembly
Details
06-20-2016
6.00
Tank assembly
Details
06-19-2016
4.00
Install the J channel stiffener in laft tank
Details
06-18-2016
5.00
Seal ribs on left tank
Details
06-14-2016
6.00
Rivet ribs into left tank
Details
06-12-2016
7.00
Back rivet stiffeners and add ribs to left tank
Details
06-11-2016
5.00
Pro seal tank stiffeners
Details
06-10-2016
6.00
Prep tank parts for assembly
Details
05-23-2016
6.00
Mocking up the tanks
Details
05-22-2016
6.00
Tank parts cut, deburred
Details
05-21-2016
7.00
Finishing flaps and starting taks
Details
05-20-2016
6.00
Assemble flaps
Details
05-19-2016
5.00
Assemble flaps for riveting
Details
05-14-2016
3.00
Priming flap parts
Details
05-13-2016
3.00
Deburring and priming flap parts
Details
04-28-2016
3.00
Preparing flap parts
Details
03-31-2016
6.00
Prepare flap parts for priming
Details
03-30-2016
6.00
Right aileron trailing edge and start flaps
Details
03-29-2016
5.00
Left aileron completed.Right aileron started
Details
03-26-2016
4.00
EAA Technichal Counselor inspection
Details
03-25-2016
5.00
Left aileron
Details
03-22-2016
6.00
Assemble aileron counter balances
Details
03-21-2016
5.00
Rivet stiffeners to aileron skins
Details
03-17-2016
8.00
Deburr and prime aileron parts
Details
03-16-2016
5.00
Finish riveting right leading edge
Details
03-15-2016
4.00
Prepare aileron parts
Details
03-13-2016
6.00
Top skin right wing
Details
03-12-2016
8.00
Finish left wing skin and leading edge attach
Details
03-10-2016
4.00
Continue top skin left wing
Details
03-09-2016
4.00
Start attaching wing skin to left wing
Details
02-22-2016
3.00
Dimple wing skins
Details
02-07-2016
4.00
Finish riveting left leading edge assembly
Details
02-02-2016
3.00
Preparing left wing skin for assembly
Details
02-01-2016
3.00
Dimple right leading edge
Details
01-17-2016
4.00
Begin riveting left leading edge
Details
01-13-2016
4.00
Assemble left leading edge
Details
01-12-2016
4.00
Paint langing light areas
Details
01-11-2016
3.00
Prepared parts for satin paint
Details
01-10-2016
4.00
deburr leading edge skins
Details
01-06-2016
4.00
Left leading edge assembly
Details
01-05-2016
4.00
Buid wing cart and leading edge holders
Details
01-01-2016
6.00
Right wing assembly
Details
12-31-2015
6.00
Install left rear spar
Details
12-30-2015
4.00
Left leading edge assembly
Details
12-26-2015
6.00
Finished left wing rib attachment
Details
12-25-2015
2.00
Rivet main spar ribs
Details
12-24-2015
5.00
Prime more parts and dimple
Details
12-23-2015
3.00
Assembly of wing parts
Details
12-22-2015
6.00
Priming wing parts
Details
12-21-2015
4.00
Prep parts for primer
Details
12-20-2015
6.00
Prepare rear spars
Details
12-19-2015
2.00
Dimple ribs and the deburr parts
Details
12-18-2015
5.00
Finish ribs and begin bolting to spar
Details
12-17-2015
6.00
Begin assembling main spars
Details
12-16-2015
2.00
Dimpled wing ribs
Details
12-13-2015
7.00
Prime ribs and main spar flangs
Details
12-12-2015
7.00
Finish main spars and prepare parts for primer
Details
12-11-2015
5.00
Main spars continued...
Details
12-10-2015
4.00
Main spars contiinued
Details
12-09-2015
5.00
Debur parts and match drill J channel
Details
12-08-2015
6.00
Unpack and inventory
Details
12-07-2015
2.00
Pick up wing kit crates
Details
SITE NAVIGATION
Contact Builder
RV-14A Home
Category
# Logs
# Hours
All
517
2694
Avionics
59
320
Avionics/Electrical
59
320
Empennage
38
157
Engine
24
111
Final assembly
22
97
Finish Kit
34
170
Firewall Forward
11
49
Fuselage
112
667
Miscellaneous
4
8
Painting
38
218
Prop
1
2
Rear Fuselage
14
67
Shop Supplies
1
4
Wings
100
504
Copyright © 2001-2024 Matronics. All Rights Reserved.