Installed the Garmin AP roll servo. The final pushrod length will be set after the main aileron pushrod is installed afetr thee bottom skins are riveted. Ran the wires and set the OAT probe in the proper bay. The hole for the probe is already drilled in the skin by Vans so thats where it will go.