Powered By Kitlog Pro v2.0
Building Integrity
Long Ez
Avionics
Work Logs Found:
89
Category Work Time:
262 Hours
Date
Hours
Work Log Summary
Details
09-09-2019
0.50
Nav light mounting points touched up and ready
Details
09-07-2019
2.00
Navlight refresh and install
Details
08-17-2019
0.50
ADSB Out is Complete
Details
08-16-2019
1.00
ADSB and Vertical Power programming
Details
08-15-2019
1.00
ADSB Solution is EZ
Details
05-17-2018
4.00
Finally, the probes are programmed
Details
05-09-2018
0.50
Landing light lens installed
Details
04-17-2018
5.00
Fuel probe issues
Details
12-14-2017
0.50
All back together now
Details
12-12-2017
2.00
Relocation of the OAT sensor
Details
10-22-2017
0.50
Less wires, less hassle
Details
06-01-2016
1.00
Servo shield is on
Details
05-30-2016
0.50
Servo Shield
Details
10-30-2015
0.50
Amp draw test
Details
09-30-2015
2.00
Panel lights are done.
Details
09-23-2015
0.50
Panel lights
Details
04-30-2015
2.00
HOLY FUEL ECONOMY!!!!!!!!!!
Details
04-04-2015
2.00
The iLevil is back!
Details
03-25-2015
0.50
Let me hear the SOUND!
Details
03-19-2015
0.00
iLevil Update
Details
03-11-2015
2.00
iLevil is out
Details
12-02-2014
1.00
Magnetometer calibration
Details
11-26-2014
5.00
Final fuel calibration and filter swap
Details
11-19-2014
2.00
Transponder and Pitot/Static Certification
Details
11-15-2014
3.00
Marty to save the day!
Details
11-11-2014
1.00
Updates
Details
11-03-2014
2.00
More programming
Details
10-21-2014
2.00
Fuel Tank calibration
Details
09-23-2014
1.00
Nav/Stobe light install
Details
09-18-2014
1.00
Color coded switches and a change of mind
Details
09-09-2014
1.00
Speed Brake success... finally
Details
09-08-2014
5.00
Panel installation
Details
09-05-2014
3.00
VPX, I've found your weakness!
Details
09-04-2014
2.00
Firewall Closeout and RTV
Details
09-02-2014
0.00
Zip ties galore 2
Details
09-02-2014
7.00
Zip ties galore
Details
09-01-2014
8.00
Nose Tidy up
Details
08-31-2014
3.00
VPX and G3X programming
Details
08-30-2014
0.00
We've got power!!! 3
Details
08-30-2014
0.00
We've got power!!! 2
Details
08-30-2014
11.50
We've got power!!!
Details
08-29-2014
3.00
Odds and ends
Details
08-28-2014
0.00
More adels and panel assembly 2
Details
08-28-2014
8.00
More adels and panel assembly
Details
08-27-2014
2.50
Nose gear switch re-wiring
Details
08-27-2014
5.00
Main Ground Buss cleanup and a new issue
Details
08-26-2014
10.50
Switch wires, speed brake and cleanup
Details
08-25-2014
6.00
Tighty up and switch wires
Details
08-24-2014
3.00
Hardware install and hwy cleanup
Details
08-23-2014
0.00
WIRES WIRES WIRES 2
Details
08-23-2014
8.00
WIRES WIRES WIRES
Details
08-21-2014
5.00
Running more wires
Details
07-19-2014
5.00
VPX install, wires n highways..
Details
07-12-2014
2.00
OAT probe and fresh air ducting
Details
07-08-2014
0.00
Com/Transponder RG400 and conduits 2
Details
07-08-2014
3.00
Com/Transponder RG400 and conduits
Details
07-07-2014
1.50
Pitot and static lines installed
Details
07-07-2014
0.50
Landing light installed
Details
07-06-2014
6.00
ADHRS, and Pitot static fittings and AP servo
Details
07-03-2014
1.50
Pitot static and Transponder antenna install
Details
06-11-2014
2.00
Aligning the magnetometer brackets
Details
05-02-2014
0.50
Nav Antenna
Details
04-23-2014
0.50
Panel cover finishing
Details
04-16-2014
0.00
Look what showed up today!
Details
04-16-2014
3.00
Avionics panel cover install
Details
04-15-2014
1.00
Avionics cover....take 2!
Details
04-14-2014
3.00
Avionics panel cover woes
Details
04-07-2014
4.00
Instrument panel mounting holes
Details
03-30-2014
0.00
Autopilot Pitch servo location 2
Details
03-30-2014
6.00
Autopilot Pitch servo location
Details
03-24-2014
1.00
Avionics bay cover
Details
03-23-2014
0.50
Pitot tube hardpoint glass
Details
03-07-2014
4.00
Final Panel design
Details
02-25-2014
4.50
Freakin awesome
Details
02-24-2014
1.00
Panel template is in!
Details
02-19-2014
0.50
New location
Details
02-18-2014
1.00
Transponder antenna
Details
02-17-2014
5.00
Another round of changes
Details
02-07-2014
6.00
Update
Details
02-06-2014
8.00
The panel design begins
Details
01-13-2014
5.00
panel fit and finish
Details
11-16-2013
5.00
Panel round 1
Details
11-09-2013
0.00
ELT ground plane 2
Details
11-09-2013
5.00
ELT ground plane
Details
07-30-2013
5.00
The decision was made and the money was spent
Details
03-29-2013
10.00
Coming soon
Details
01-16-2013
12.00
XPanel planner
Details
04-26-2012
2.00
Changing views
Details
04-21-2012
8.50
Panel and interior design
Details
SITE NAVIGATION
Contact Builder
Long Ez Home
Category
# Logs
# Hours
All
2163
5429
Airframe Tweaking
4
6
Avionics
89
262
Canard
44
65
Canopy
94
226
Control System
95
279
Cowling
129
363
Electrical System
36
102
Elevators
5
15
Engine
421
934
Finishing
561
1584
Firewall
32
92
FLIGHT TESTING
41
58
Fuel system
24
48
Fuse Exterior
11
16
Fuselage
126
246
Instrument Panel
4
15
Landing Brake
14
21
Main Landing Gear
64
162
Miscellaneous
31
43
Nose and Nose gear
111
236
Plans
2
43
Prop
26
32
Scheduled Maintenanc
2
3
Seat Belts
2
3
Shop Supplies
18
57
Spar
19
41
Strakes
73
228
The Beginning
1
The Shop
18
57
Throttle
3
8
Weight and Balance
6
10
Winglets and Rudders
16
44
Wings
41
130
Copyright © 2001-2024 Matronics. All Rights Reserved.