KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  9-23-2014
Number of Hours:  1.00
Manual Reference:  ch 22
Brief Description:  Nav/Stobe light install

This was a cool job to finish. I lined up the lights to level at cruise which is about 2 degrees down from level with the longerons. This way the lights will be only create a very small amount of drag. Instead of installing 4-40 nuts and screws, I decided that being totally weather tight was more important especially considering that LED lights will outlast the airplane and may NEVER need to be replaced. However, When it comes time to paint, I will simply run a razor blade under the light for removal.
' style=

Level with longerons

Level with longerons

' style=

Light 2 degrees down

Light 2 degrees down

' style=

Testing out the lights :)

Testing out the lights :)

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.