KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  7-12-2014
Number of Hours:  2.00
Manual Reference:  ch 22
Brief Description:  OAT probe and fresh air ducting

I first cut the proper length of the SCEET tubing then routed it from the pilot fresh air vent to the panel eye ball vent. I will need to hard mount it at the eyeball somehow but that will come after the panel is installed and ready for it. Next I drilled a 5/16" hole in the fresh air naca to accept the OAT probe and the install was very simple and straight forward. This location works so well "wiring wise" that I hope it works out as an accurate place to have the sensor. I've seen people love this stop and other hate it. Crossing my toes here, but if it must change locations it will be a very easy hole to patch up.
' style=

SCEET Tubing zip tied in position

SCEET Tubing zip tied in position

' style=

OAT sensor installed

OAT sensor installed

' style=

nice and straight in the middle

nice and straight in the middle

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.