Brief Description: Pitot and static lines installed
The fastest pitot tube on earth got to be installed today :) After assembling the fittings, the Safeair lines were cut to length and installed. To date, I must say this was the easiest part of the build so far. What a brilliant design. Plug and play and true dual redundancy if either ADHRS fails.