Home
Builder Search
Builder Login
KitLog.com    

RECENT ACTIVITY

Previous Builder          Next Builder

Builder:
  John McGlynn
Location:
  St Johns, FL - USA
Aircraft:
  S-19
Total Build Hours:
  232
Web Site:
  http://www.mykitlog.com/jhmcglynn/

Date:  03-26-2020
Number of Hours:  1.00
Short Description:  Charge Left Brakes

Greg brought a hand pump to the hangar and we charged the left brake system from the nipple on the caliper pushing up through the parking brake to the T that connects to the master reservoir. There was a lot of back pressure which seemed to be relieved when I moved the left pilot brake cyclinder. Also the parking brake cable needs to be adjusted. I suspect it is locked when fully pushed in; suspect it goes to open when pulled out 1/2 way and the handle is vertical. Plan to do the right side today.
Previous Builder          Next Builder




 Recent Builder Activity
Builder Project Date Hours
Thomas Balmer
Challenger Part 103
03-30
1
Barry Bernstein
RV12iS
03-29
536
Carl Orton
750 Cruzer
03-29
534
Darrel Watson
S7 Super Sport
03-29
1639
Gregory LeCrone
RV-7
03-29
242
Martin Filiatrault
RV-8
03-29
2448
Matthew Lorenz
RV-10
03-29
47
Rick McBride
RV-10
03-29
1402
Robert Lussow
RV-10
03-29
2471
Sean Smith
CX5
03-29
769
Tom Brackx
7 Speedster
03-29
217
Bob Corriveau
RV-8
03-28
1455
Brian Perry
RV-14a
03-28
526
Mark Weitkamp
CX4
03-28
1384
Norris Brown
RV10
03-28
932
Phil Risley
RV9
03-28
1052
Ronald Cardwell
RV-8
03-28
718
Thomas Ferranti
RV7
03-28
181
Wendell Engelien
RV-6A
03-28
1860
Edward Beam
RV-14A
03-27
404
Jay Johnson
CH-750 Cruzer
03-27
1815
John Peck
C120
03-27
330
Lance W. Miller
CH650
03-27
148
Neil Rosoff
EX-3
03-27
26
Peter Calley
Sling4
03-27
2058
Steven Lynn
RV-7A
03-27
1739
Greg Long
RV-12
03-26
1216
Greg Schroeder
Sportsman 2+2
03-26
2628
John McGlynn
S-19
03-26
232
Randy Doughty
CH750 Cruzer
03-25
542

Projects Uploaded: 1477
Logs Uploaded: 255900








Copyright © 2001-2020 Matronics. All Rights Reserved. Privacy Policy.