Home
Builder Search
Builder Login
KitLog.com    

RECENT ACTIVITY

Previous Builder          Next Builder

Builder:
  Randy Doughty
Location:
  Fayetteville, AR - USA
Aircraft:
  CH750 Cruzer
Total Build Hours:
  645
Web Site:
  http://www.mykitlog.com/srdough/

Date:  09-19-2020
Number of Hours:  3.50
Short Description:  Installed rudder pedals

Located and drilled the lateral pedal bearings (C3-6).
Installed the center pedal bearing and rudder pedals.
Began drilling of the brake cylinder supports (C3-7).















Previous Builder          Next Builder




 Recent Builder Activity
Builder Project Date Hours
Andrew Caldwell
RV-8
09-28
184
Des Howson
Sling 2 Taildragger
09-28
2329
Peter Calley
Sling4
09-28
2287
Bob Corriveau
RV-8
09-27
1860
Brian Perry
RV-14a
09-27
961
Carl Peterson
A QB
09-27
163
Edward Beam
RV-14A
09-27
544
James Roberts
RV8
09-27
170
Martin Filiatrault
RV-8
09-27
2792
Mike Mitchell
RV-14A
09-27
335
Peter Autenried
CH - 750
09-27
409
Phil Risley
RV9
09-27
1120
Rick McBride
RV-10
09-27
2151
Sean Smith
CX5
09-27
1100
Carl Orton
750 Cruzer
09-26
709
Chris King
Fokker D.VII
09-26
1746
Miles Bowen
RV-7
09-26
1789
Thomas Ferranti
RV7
09-26
405
Don Johnson
RV-8
09-25
298
John Peck
C120
09-25
332
Norris Brown
RV10
09-25
1470
Ronald Cardwell
RV-8
09-25
828
Jeremy Seals
RV-10
09-24
58
Jim Novak
RV-8
09-24
2195
Robert Lussow
RV-10
09-24
2826
Wendell Engelien
RV-6A
09-24
2073
John D Hazen
RV-12iS
09-22
931
Jean Gosselin
RV6
09-21
1013
Nathaniel Jackson
RV-7
09-21
459
Douglas Kupersmith
Zodiac 650 B
09-20
1408

Projects Uploaded: 1493
Logs Uploaded: 261558








Copyright © 2001-2020 Matronics. All Rights Reserved. Privacy Policy.