Powered By Kitlog Pro v2.0
Building Integrity
Long Ez
Electrical System
Work Logs Found:
36
Category Work Time:
102 Hours
Date
Hours
Work Log Summary
Details
02-18-2019
2.00
More cranking amps
Details
11-08-2016
0.50
Time for a new battery...shame on me
Details
12-14-2015
5.00
My....Gosh....
Details
08-20-2014
1.00
Peace of Mind is Priceless
Details
08-19-2014
0.00
More work than expected 2
Details
08-19-2014
6.00
More work than expected
Details
07-23-2014
0.00
New Highways and ELT install 2
Details
07-23-2014
5.00
New Highways and ELT install
Details
07-22-2014
8.00
AP Roll servo, ECU wiring, and Cabin lights 2
Details
07-21-2014
8.00
AP Roll servo, ECU wiring, and Cabin lights
Details
07-20-2014
7.00
Fuel Pump wires and Engine mount highways
Details
07-18-2014
2.00
Nose gear wiring and ground wires begin
Details
07-12-2014
1.00
Fuel pump wires run
Details
07-05-2014
0.50
Master relay and ground buss
Details
06-09-2014
0.00
Magnetometer location and brackets 2
Details
06-09-2014
4.00
Magnetometer location and brackets
Details
03-30-2014
2.00
Landing light enclosure and BU Battery tray
Details
03-29-2014
0.00
Landing light housing prep and finish 2
Details
03-29-2014
4.00
Landing light housing prep and finish
Details
03-27-2014
0.00
iLevil and battery bracket install 2
Details
03-27-2014
8.00
iLevil and battery bracket install
Details
03-27-2014
0.00
iLevil and battery bracket install
Details
03-26-2014
6.00
Battery hardpoints and iLevil bracket
Details
03-25-2014
0.00
Brackets and hardpoints 2
Details
03-25-2014
8.00
Brackets and hardpoints
Details
03-24-2014
0.00
Battery brackets, Master relay and Ground busses 3
Details
03-24-2014
0.00
Battery brackets, Master relay and Ground busses 2
Details
03-24-2014
6.00
Battery brackets, Master relay and Ground busses
Details
03-23-2014
0.00
Landing Light 2
Details
03-23-2014
6.00
Landing Light
Details
02-22-2014
1.00
Wire conduit
Details
02-19-2014
0.00
Highways and Biways 2
Details
02-19-2014
8.50
Highways and Biways
Details
01-05-2014
1.00
Landing light bracket
Details
01-03-2014
1.50
Landing Light
Details
03-12-2013
0.15
Batteries test fit
Details
SITE NAVIGATION
Contact Builder
Long Ez Home
Category
# Logs
# Hours
All
2163
5429
Airframe Tweaking
4
6
Avionics
89
262
Canard
44
65
Canopy
94
226
Control System
95
279
Cowling
129
363
Electrical System
36
102
Elevators
5
15
Engine
421
934
Finishing
561
1584
Firewall
32
92
FLIGHT TESTING
41
58
Fuel system
24
48
Fuse Exterior
11
16
Fuselage
126
246
Instrument Panel
4
15
Landing Brake
14
21
Main Landing Gear
64
162
Miscellaneous
31
43
Nose and Nose gear
111
236
Plans
2
43
Prop
26
32
Scheduled Maintenanc
2
3
Seat Belts
2
3
Shop Supplies
18
57
Spar
19
41
Strakes
73
228
The Beginning
1
The Shop
18
57
Throttle
3
8
Weight and Balance
6
10
Winglets and Rudders
16
44
Wings
41
130
Copyright © 2001-2024 Matronics. All Rights Reserved.