KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  7-23-2014
Number of Hours:  5.00
Manual Reference:  ch 22
Brief Description:  New Highways and ELT install

I've begun adding more adel clamps in the nose forward of the panel for routing the avionics wires to the instruments. I also trial fitted the cabin light dimmer switch and needed to clear out a little glass and foam for it to fit. I also had to re-locate one of my adel clamps as it was too close for good clearance.
Next I ran the ELT wire through the conduit, decided on a location to mount the ELT tray and instead of trying to mount hardpoints inside the baggage area, I whipped up some Flox and layed the tray down on top of a nice bed of the stuff.
Avionics are set to be COMPLETE in 1 month so All this work must be done before I leave town for 2 weeks. Getting to the finish line!!
' style=

cables routed with adel clamps

cables routed with adel clamps

' style=

glass cleared for switch

glass cleared for switch

' style=

install fits well.

install fits well.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.