KitLog pro

Powered By Kitlog Pro v2.0

Bob Leffler's RV-10
Work Logs Found: 9
Category Work Time: 15 Hours
 Date
Hours
Work Log Summary

Details

 11-05-2009
2.00
Control Sticks Continued #3
Details
       

 11-05-2009
1.00
Control Sticks Continued #2
Details
     

 11-04-2009
2.00
Right Control Stick
Details
     

 11-03-2009
2.00
Left Control Stick and Instrument Panel
Details
       

 11-02-2009
2.00
Install elevator idler arm and control column
Details
       

 10-31-2009
2.00
Aileron pushrods and Elevator Idler Arm
Details
       

 10-30-2009
1.00
Elevator Pushrod (Mid)
Details
     

 10-30-2009
1.00
Elevator Pushrod (Forward)
Details
     

 10-29-2009
2.00
Rudder cables
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.