KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
Work Logs Found: 65
Category Work Time: 127 Hours
 Date
Hours
Work Log Summary

Details

 06-09-2012
9.00
Rigging
Details
       

 09-28-2008
2.00
Etch primed rudder
Details

 09-25-2008
1.00
Filled and sanded rudder
Details
       

 09-25-2008
1.00
Filled and sanded Elevators
Details
       

 09-16-2008
2.00
Sand left elevator and TC inspection
       

 09-09-2008
3.00
Right Elevator tip
Details
       

 09-06-2008
2.00
Horizontal stab tips
Details
       

 09-06-2008
1.00
Elevator tips with epoxy filler applied
       

 09-06-2008
2.00
Drilled fiberglass tips to the left and right elev
Details
       

 08-17-2008
4.00
Fitting fiberglass tips to elevator
Details
       

 08-17-2008
1.00
Drilling the elevator horns
Details
       

 07-26-2008
15.00
Right rudder
       

 07-26-2008
0.00
Right elevatror, roll leading edge
Details
       

 07-26-2008
0.00
Right elevator
       

 07-26-2008
0.00
Right elevator
       

 06-09-2008
0.00
Roll the nose skin
Details
       

 06-09-2008
0.00
Rivet the right elevator skin
Details
       

 06-09-2008
8.00
Counter weight
Details
       

 06-08-2008
3.00
Install elevator skeleton
Details
       

 06-07-2008
4.00
Primed and riveted right elevator skin
       

 06-07-2008
0.00
Bend elevator skin and install counter weight
       

 06-01-2008
3.50
Rudder stiffeners
Details
       

 06-01-2008
0.00
Elevator skin dimpled
       

 05-29-2008
1.50
Rolled rudder leading edge
Details
       

 05-29-2008
0.00
Pop rivet forward rudder skins
Details
       

 05-28-2008
1.50
Rivet rudder trailing edge
Details
       

 05-27-2008
1.50
Prosealed wedge into rudder
Details
       

 05-25-2008
0.00
Rudder skin installed
       

 05-25-2008
0.00
Rudder skeleton
       

 05-25-2008
8.00
Assemble rudder skeleton
       

 05-24-2008
2.00
Disaasemble and prep rudder
       

 05-18-2008
0.00
Rudder horn brace
       

 05-18-2008
0.00
Riveting right skins and stiffeners
       

 05-18-2008
0.00
Rivet left rudder skin stiffeners
       

 05-18-2008
6.00
Etch priming skins and stiffeners
       

 05-18-2008
0.00
Assemble rudder skeleton
       

 05-15-2008
1.00
Rudder skin stiffeners
Details
       

 05-14-2008
1.50
VS rear spar
       

 05-13-2008
0.00
VS Skin riveted in place
       

 05-13-2008
1.50
Riveted the skin of the VS
       

 05-12-2008
1.50
Rivet rear spar of VS
       

 05-12-2008
0.00
Front spar riveted
Details
       

 05-11-2008
2.00
Skin the Vertical stabiliser
Details
       

 05-11-2008
1.00
Etch prime Vertical Stab
Details
       

 05-11-2008
2.00
Debur, dimple and counter skin VS
Details
       

 05-11-2008
2.00
Assemble Vertical Stab Skeleton
Details
       

 05-10-2008
3.00
Finished right side of Stab
Details
       

 05-08-2008
2.50
Top surface of skin riveted
Details
       

 05-08-2008
0.50
Rivet left horizontal stab nose rib
Details
       

 05-08-2008
1.00
Rivet HS-708, HS-706 in place
Details
       

 05-01-2008
2.00
Rivet the rear sapr
Details
       

 04-27-2008
2.00
FInished deubrring
Details
       

 04-27-2008
2.00
Etch prime parts
Details
       

 04-27-2008
2.00
Dimple parts
Details
       

 04-26-2008
3.00
Disassemble and deburr
Details
       

 04-24-2008
1.20
Trimed plastic from stab
Details
       

 04-23-2008
1.50
Back drilled HS-404, 405
Details
       

 04-22-2008
1.00
Working on right side of Horizontal stab
Details
     

 04-21-2008
1.50
Back drilled skins to ribs
Details
       

 04-20-2008
3.50
Prepare all horizontal ribs and fit skin
Details
       

 04-20-2008
0.60
Notch HS-404 and fit HS-405
Details
       

 04-18-2008
1.00
Cut and taper HS-710, 714
Details
       

 04-18-2008
1.00
Bend HS-710, 714 to 6 degrees
Details
       

 04-15-2008
1.50
Drilled doublers to #30 and attached ribs
Details
       

 04-12-2008
2.00
Prepared both rear support doublers
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.