Powered By Kitlog Pro v2.0
Eddie's Zodiac XL Project
RV-7
Empennage
Work Logs Found:
65
Category Work Time:
127 Hours
Date
Hours
Work Log Summary
Details
06-09-2012
9.00
Rigging
Details
09-28-2008
2.00
Etch primed rudder
Details
09-25-2008
1.00
Filled and sanded rudder
Details
09-25-2008
1.00
Filled and sanded Elevators
Details
09-16-2008
2.00
Sand left elevator and TC inspection
09-09-2008
3.00
Right Elevator tip
Details
09-06-2008
2.00
Horizontal stab tips
Details
09-06-2008
1.00
Elevator tips with epoxy filler applied
09-06-2008
2.00
Drilled fiberglass tips to the left and right elev
Details
08-17-2008
4.00
Fitting fiberglass tips to elevator
Details
08-17-2008
1.00
Drilling the elevator horns
Details
07-26-2008
15.00
Right rudder
07-26-2008
0.00
Right elevatror, roll leading edge
Details
07-26-2008
0.00
Right elevator
07-26-2008
0.00
Right elevator
06-09-2008
0.00
Roll the nose skin
Details
06-09-2008
0.00
Rivet the right elevator skin
Details
06-09-2008
8.00
Counter weight
Details
06-08-2008
3.00
Install elevator skeleton
Details
06-07-2008
4.00
Primed and riveted right elevator skin
06-07-2008
0.00
Bend elevator skin and install counter weight
06-01-2008
3.50
Rudder stiffeners
Details
06-01-2008
0.00
Elevator skin dimpled
05-29-2008
1.50
Rolled rudder leading edge
Details
05-29-2008
0.00
Pop rivet forward rudder skins
Details
05-28-2008
1.50
Rivet rudder trailing edge
Details
05-27-2008
1.50
Prosealed wedge into rudder
Details
05-25-2008
0.00
Rudder skin installed
05-25-2008
0.00
Rudder skeleton
05-25-2008
8.00
Assemble rudder skeleton
05-24-2008
2.00
Disaasemble and prep rudder
05-18-2008
0.00
Rudder horn brace
05-18-2008
0.00
Riveting right skins and stiffeners
05-18-2008
0.00
Rivet left rudder skin stiffeners
05-18-2008
6.00
Etch priming skins and stiffeners
05-18-2008
0.00
Assemble rudder skeleton
05-15-2008
1.00
Rudder skin stiffeners
Details
05-14-2008
1.50
VS rear spar
05-13-2008
0.00
VS Skin riveted in place
05-13-2008
1.50
Riveted the skin of the VS
05-12-2008
1.50
Rivet rear spar of VS
05-12-2008
0.00
Front spar riveted
Details
05-11-2008
2.00
Skin the Vertical stabiliser
Details
05-11-2008
1.00
Etch prime Vertical Stab
Details
05-11-2008
2.00
Debur, dimple and counter skin VS
Details
05-11-2008
2.00
Assemble Vertical Stab Skeleton
Details
05-10-2008
3.00
Finished right side of Stab
Details
05-08-2008
2.50
Top surface of skin riveted
Details
05-08-2008
0.50
Rivet left horizontal stab nose rib
Details
05-08-2008
1.00
Rivet HS-708, HS-706 in place
Details
05-01-2008
2.00
Rivet the rear sapr
Details
04-27-2008
2.00
FInished deubrring
Details
04-27-2008
2.00
Etch prime parts
Details
04-27-2008
2.00
Dimple parts
Details
04-26-2008
3.00
Disassemble and deburr
Details
04-24-2008
1.20
Trimed plastic from stab
Details
04-23-2008
1.50
Back drilled HS-404, 405
Details
04-22-2008
1.00
Working on right side of Horizontal stab
Details
04-21-2008
1.50
Back drilled skins to ribs
Details
04-20-2008
3.50
Prepare all horizontal ribs and fit skin
Details
04-20-2008
0.60
Notch HS-404 and fit HS-405
Details
04-18-2008
1.00
Cut and taper HS-710, 714
Details
04-18-2008
1.00
Bend HS-710, 714 to 6 degrees
Details
04-15-2008
1.50
Drilled doublers to #30 and attached ribs
Details
04-12-2008
2.00
Prepared both rear support doublers
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
470
2573
Ailerons
9
38
Avionics
12
110
Brakes
5
14
Canopy
33
141
Center Fuselage
26
116
Centre spar
3
37
Cowling
20
109
Empennage
65
231
Engine
24
114
Fairing
24
87
Final Assembly
6
39
Firewall
14
66
Flap assembly
6
30
Flight testing
2
25
Front Fuselage
5
115
Fuselage
34
176
FWF
2
16
Instrument panel
9
50
Miscellaneous
10
142
None
4
13
Painting
25
219
Prop
3
7
Rear turtle deck
6
38
Roll Bar
1
16
Rudder
3
3
Seats
2
8
Spinner
3
4
Vertical Stab
5
14
Wheels and brakes
1
41
Wings
108
554
Zodiac 601 XL Home
Copyright © 2001-2024 Matronics. All Rights Reserved.