With practise the setting of both the dome and flush rivets is getting easier and easier. I completed the assembly of the right side of the stab in half the time it took to do the left side. Now I just have to fit the fiberglass tip ribs and then onto the vertical stab.
Right nose rib riveted in place
Tip rib riveted in place
Top and bottom of stab with all riveting complete, just need to fit the fiberglass ribs to each end