KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  4-15-2008
Number of Hours:  1.50
Manual Reference:  HS-708
Brief Description:  Drilled doublers to #30 and attached ribs

This evening I made rapid progress as I back drilled the rear spar supports to #30 and attached all the elevator hinge brackets. The center hinge bracket with its bearing was then back drilled again to #30 and then removed and etch primed. The horizontal stab ribs where also clecoed in place and back drilled to #21.
' style=

Horizontal stab ribs HS-708 back drilled to #21 and attached to rear spar

Horizontal stab ribs HS-708 back drilled to #21 and attached to rear spar

' style=

Elevator bearing back drilled to #30 and attached to rear spar and doublers

Elevator bearing back drilled to #30 and attached to rear spar and doublers

' style=

Remaining elevator hinge brackets back drilled and attached to rear spar

Remaining elevator hinge brackets back drilled and attached to rear spar

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.