KitLog pro

Powered By Kitlog Pro v2.0

John's RV10 Project Build
Work Logs Found: 118
Category Work Time: 444 Hours
 Date
Hours
Work Log Summary

Details

 10-13-2023
1.00
priming rear bulkhead assembly
Details
       

 10-12-2023
1.00
Rear Spar Bulkhead clecoing
Details
       

 10-11-2023
1.00
Finished other Center Section Bulkhead Complete:-)
Details
       

 10-06-2023
1.00
Riveting Center Section bulkhead assemblies
Details
       

 10-03-2023
1.00
Priming Mid fuselage bulkheads Center Section Bulk
Details
       

 09-26-2023
2.00
Wiring ZipTips to CPC Connector
Details
       

 09-22-2023
1.00
Installing GAP26 control box
Details
       

 09-19-2023
3.00
Installing wing conduit
Details
       

 09-14-2023
3.00
Fuel Tank Gapping for Paint
Details
       

 08-23-2023
6.00
GAP26 Pitot hole cut Bottom skin nutplate attach a
Details
       

 08-22-2023
2.00
priming bottom wing skins
Details
       

 08-21-2023
2.00
Electric Aileron Trim Assembly
Details
       

 08-21-2023
3.00
Cutting Pitot Hole in Bottom Wing Skin
Details
       

 08-16-2023
1.00
Pitot Doubler Plate fabrication
Details
     

 08-15-2023
3.00
Cutting Bottom Skin Extra Access Panel ER tanks
Details
       

 08-15-2023
3.00
Aileron Flap Gap Fairings Riveting
Details
       

 08-14-2023
1.00
Gap Fairings test fit
Details
       

 08-11-2023
3.50
drilling and riveting left flap bottom skin
Details
       

 08-10-2023
2.50
Hooking Up Garmin Roll Servo in Wing
Details
       

 08-09-2023
6.00
Final assembly of right flap
Details
       

 08-08-2023
2.00
Flap Hinge Brackets
Details
     

 08-07-2023
2.50
Aileron bellcrack nuts torqued
Details
       

 08-03-2023
2.00
Aileron Bellcrack/ actuation
Details
       

 07-21-2023
1.50
Aileron Pushrod
Details
     

 07-19-2023
4.00
Aileron Bellcrack & Pushrod drilling/assembly
Details
       

 07-04-2023
3.00
Nose Skin Riveting and Backriveting Ribs
Details
       

 07-04-2023
0.00
DAD COMING OVER TO HELP
Details
     

 06-29-2023
2.00
left flap priming
Details
       

 06-28-2023
2.00
Left Flap Prepping Parts - final assembly
Details
       

 06-26-2023
4.00
Aileron Trailing Edge proseal and riveting
Details
       

 06-23-2023
5.00
Aileron Skins Riveting
Details
       

 06-22-2023
2.00
Right Aileron Top Skin
Details
       

 06-21-2023
2.00
Trailing Edge countersinking/ Counterbanance Drill
Details
       

 06-20-2023
2.00
Aileron trailing edge Clecoed ready for riveting
Details
       

 06-16-2023
1.00
Back Riveting Aileron ribs
Details
       

 06-15-2023
1.00
taping the rivets for aileron skin backriveting
Details
       

 06-08-2023
4.00
primed skins and stiffeners
Details
       

 06-08-2023
4.00
Aileron Counterbalance Match Drill
Details
       

 06-07-2023
4.00
Aileron Rib priming
Details
     

 06-06-2023
6.00
Attach ER Fuel Tanks to Main Spar
Details
       

 06-01-2023
8.00
Moving EFII Fuel Return Bung Fittings
Details
       

 05-26-2023
2.50
Priming Fuel tank outside baffle
Details
       

 05-20-2023
2.00
BOTH FUEL TANKS NO LEAKS!!!!!!!!!!!!!!!
Details
       

 05-19-2023
2.00
Tested Left Fuel Tank NO LEAKS!!!!
Details
       

 05-19-2023
4.00
BOTH ER FUEL TANKS COMPLETE!!!!
Details
       

 05-18-2023
0.50
Right tank Locking Fuel Cap Lookin' Sexy!!
Details
     

 05-17-2023
2.00
Right Tank Inboard Rib w/ AN Fittings Complete
Details
       

 05-17-2023
3.00
Right tank ALL ribs riveted and prosealed
Details
       

 05-17-2023
3.50
Right ER Tank Fuel Flange and Outboard Rib
Details
       

 05-16-2023
8.00
Right Tank 1004 Ribs Finished and Riveted
Details
       

 05-15-2023
1.00
Right ER fuel tank skin in cradle ready for Prosea
Details
     

 05-13-2023
1.00
Bought Locking Fuel Caps
Details
       

 05-12-2023
3.50
Tank Attatch Z Brackets
Details
       

 05-12-2023
2.50
Right Fuel Tank Taping Rivets for Back Riveting St
Details
       

 05-11-2023
2.00
Priming Tank Atatch Z Brackets
Details
       

 05-11-2023
2.00
Left Fuel Tank Complete
Details
       

 05-11-2023
4.00
Left ER Tank Rear Baffle Riveted Proseal
Details
       

 05-10-2023
5.00
Pass Thru Fitting ER Tanks DUAL FUEL SENDERS
Details
       

 05-04-2023
4.50
Installing OB Fuel Level Sender
Details
       

 05-04-2023
3.00
Instaling the Inboard Fuel Level Sender
Details
       

 05-03-2023
3.00
Outboard Fuel Tank Rib and test fit baffle
Details
       

 05-03-2023
2.00
Fuel Supply, Return and Vent Lines
Details
       

 05-01-2023
5.00
Left Tank Vent Line Proseal and Flared
Details
       

 05-01-2023
4.50
Left Fuel Tank Inboard Rib Prosealed
Details
       

 05-01-2023
4.50
Installed the Fuel Tank Vent Line
Details
       

 05-01-2023
2.50
Installed and prosealed OB fuel tank rib
Details
       

 05-01-2023
12.00
Adding the fuel tank fitings
Details
       

 04-30-2023
4.00
Pro Sealed Fuel Drain Flange
Details
       

 04-30-2023
2.00
Left Fuel Tank Drain Flange
Details
       

 04-30-2023
3.00
Bending Fuel Vent Lines
Details
     

 04-29-2023
10.00
Proseal Riveting 1004 Ribs to tank
Details
       

 04-29-2023
5.00
Left Fuel Tank Stiffeners Prosealed Riveted
Details
       

 04-29-2023
3.00
Fuel Return Bung for EFII
Details
       

 04-29-2023
1.50
Fuel Cap Flange
Details
     

 04-28-2023
4.00
Back Riveting Lerft Tank Skin Stiffeners
Details
       

 04-27-2023
3.00
Fuel Tank Prep
Details
       

 04-27-2023
18.00
Deburring & Dimpling Fuel Tank Skins
Details
       

 04-27-2023
5.00
Assembly of 1005 Fuel Tank Attach
Details
       

 04-26-2023
6.00
Final Drilled ER Fuel Tank Skin Holes
Details
       

 04-17-2023
3.00
Right Outboard LE Attach to Main Spar
Details
       

 04-17-2023
4.00
Left Wing Leading Edge Riveted to Spar
Details
       

 04-15-2023
1.00
Riveting Leading Edge Skin to Spar
Details
     

 04-13-2023
2.00
Leading Edge Stall Warning Opening
Details
       

 04-13-2023
4.00
Completed Stall Warning System Install
Details
       

 04-12-2023
4.00
cutting out access panel from skin
Details
       

 04-12-2023
5.00
Completed Outboard Leading Edge Riveting!!!!!!
Details
       

 04-11-2023
9.00
Riveting Outboard Leading Edge Assembly
Details
       

 04-10-2023
7.50
Dimpling LE skins
Details
       

 04-08-2023
2.00
Riveting nutplates on LE splice strips
Details
     

 04-03-2023
4.00
trimming leading edge skin for ER fuel tanks
Details
       

 04-02-2023
2.00
cleco nutplates to ER tank splice strips
Details
     

 04-01-2023
7.00
outboard leading edge modification PM
Details
       

 04-01-2023
5.00
outboard leading edge AM
Details
       

 03-31-2023
4.00
wing conduit runs
Details
       

 03-30-2023
2.00
trimming leading edge skins for ER fuel tanks
Details
       

 03-28-2023
11.00
right wing top skin riveting
Details
       

 03-25-2023
8.00
Top Wing Skin Riveting
Details
       

 02-24-2023
2.00
countersinking Inboard Top Skin nutplate attach ri
Details
     

 02-23-2023
4.00
blending top wing skins
Details
       

 02-14-2023
7.00
riveting ribs to main spar
Details
       

 02-09-2023
10.00
rear spar assembly
Details
       

 02-09-2023
5.00
making aileron hinge brackets
Details
       

 02-09-2023
2.00
Finsih Kit Seats Arrive!!
Details
       

 02-03-2023
4.00
Riveting Main Spar Nutplates and CS Holes
Details
       

 02-03-2023
6.00
More Riveting Main Spar Nutplates
Details
       

 01-21-2023
4.00
Match drilling Doubler for ER fuel tanks
Details
       

 01-20-2023
4.00
RV10 Finish Kit Arrival
Details
       

 01-20-2023
3.00
More Unpacking of the Finish KIt
Details
       

 01-20-2023
5.00
Main Spar Alteration Clecoing ER Tank Doubler
Details
       

 01-19-2023
2.50
alteration of main spar for ER fuel tanks
Details
       

 01-18-2023
3.00
Modifying Main Spar for ER Tank Doubler
Details
       

 01-18-2023
4.50
match drilling wing J stiffeners
Details
       

 01-13-2023
3.00
wing spar extension
Details
       

 07-21-2022
9.00
riveting VS skin
Details
       

 07-19-2022
5.00
Dimple Debur and Prime
Details
       

 07-16-2022
0.20
dimpling VS and missed hole oops
Details
     

 07-13-2022
6.50
VS initial construction
Details
       

 06-22-2022
6.50
Empennage Arrives and begin inventory
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.