Powered By Kitlog Pro v2.0
John's RV10 Project Build
RV10
All
Work Logs Found:
118
Category Work Time:
444 Hours
Date
Hours
Work Log Summary
Details
10-13-2023
1.00
priming rear bulkhead assembly
Details
10-12-2023
1.00
Rear Spar Bulkhead clecoing
Details
10-11-2023
1.00
Finished other Center Section Bulkhead Complete:-)
Details
10-06-2023
1.00
Riveting Center Section bulkhead assemblies
Details
10-03-2023
1.00
Priming Mid fuselage bulkheads Center Section Bulk
Details
09-26-2023
2.00
Wiring ZipTips to CPC Connector
Details
09-22-2023
1.00
Installing GAP26 control box
Details
09-19-2023
3.00
Installing wing conduit
Details
09-14-2023
3.00
Fuel Tank Gapping for Paint
Details
08-23-2023
6.00
GAP26 Pitot hole cut Bottom skin nutplate attach a
Details
08-22-2023
2.00
priming bottom wing skins
Details
08-21-2023
2.00
Electric Aileron Trim Assembly
Details
08-21-2023
3.00
Cutting Pitot Hole in Bottom Wing Skin
Details
08-16-2023
1.00
Pitot Doubler Plate fabrication
Details
08-15-2023
3.00
Cutting Bottom Skin Extra Access Panel ER tanks
Details
08-15-2023
3.00
Aileron Flap Gap Fairings Riveting
Details
08-14-2023
1.00
Gap Fairings test fit
Details
08-11-2023
3.50
drilling and riveting left flap bottom skin
Details
08-10-2023
2.50
Hooking Up Garmin Roll Servo in Wing
Details
08-09-2023
6.00
Final assembly of right flap
Details
08-08-2023
2.00
Flap Hinge Brackets
Details
08-07-2023
2.50
Aileron bellcrack nuts torqued
Details
08-03-2023
2.00
Aileron Bellcrack/ actuation
Details
07-21-2023
1.50
Aileron Pushrod
Details
07-19-2023
4.00
Aileron Bellcrack & Pushrod drilling/assembly
Details
07-04-2023
3.00
Nose Skin Riveting and Backriveting Ribs
Details
07-04-2023
0.00
DAD COMING OVER TO HELP
Details
06-29-2023
2.00
left flap priming
Details
06-28-2023
2.00
Left Flap Prepping Parts - final assembly
Details
06-26-2023
4.00
Aileron Trailing Edge proseal and riveting
Details
06-23-2023
5.00
Aileron Skins Riveting
Details
06-22-2023
2.00
Right Aileron Top Skin
Details
06-21-2023
2.00
Trailing Edge countersinking/ Counterbanance Drill
Details
06-20-2023
2.00
Aileron trailing edge Clecoed ready for riveting
Details
06-16-2023
1.00
Back Riveting Aileron ribs
Details
06-15-2023
1.00
taping the rivets for aileron skin backriveting
Details
06-08-2023
4.00
primed skins and stiffeners
Details
06-08-2023
4.00
Aileron Counterbalance Match Drill
Details
06-07-2023
4.00
Aileron Rib priming
Details
06-06-2023
6.00
Attach ER Fuel Tanks to Main Spar
Details
06-01-2023
8.00
Moving EFII Fuel Return Bung Fittings
Details
05-26-2023
2.50
Priming Fuel tank outside baffle
Details
05-20-2023
2.00
BOTH FUEL TANKS NO LEAKS!!!!!!!!!!!!!!!
Details
05-19-2023
2.00
Tested Left Fuel Tank NO LEAKS!!!!
Details
05-19-2023
4.00
BOTH ER FUEL TANKS COMPLETE!!!!
Details
05-18-2023
0.50
Right tank Locking Fuel Cap Lookin' Sexy!!
Details
05-17-2023
2.00
Right Tank Inboard Rib w/ AN Fittings Complete
Details
05-17-2023
3.00
Right tank ALL ribs riveted and prosealed
Details
05-17-2023
3.50
Right ER Tank Fuel Flange and Outboard Rib
Details
05-16-2023
8.00
Right Tank 1004 Ribs Finished and Riveted
Details
05-15-2023
1.00
Right ER fuel tank skin in cradle ready for Prosea
Details
05-13-2023
1.00
Bought Locking Fuel Caps
Details
05-12-2023
3.50
Tank Attatch Z Brackets
Details
05-12-2023
2.50
Right Fuel Tank Taping Rivets for Back Riveting St
Details
05-11-2023
2.00
Priming Tank Atatch Z Brackets
Details
05-11-2023
2.00
Left Fuel Tank Complete
Details
05-11-2023
4.00
Left ER Tank Rear Baffle Riveted Proseal
Details
05-10-2023
5.00
Pass Thru Fitting ER Tanks DUAL FUEL SENDERS
Details
05-04-2023
4.50
Installing OB Fuel Level Sender
Details
05-04-2023
3.00
Instaling the Inboard Fuel Level Sender
Details
05-03-2023
3.00
Outboard Fuel Tank Rib and test fit baffle
Details
05-03-2023
2.00
Fuel Supply, Return and Vent Lines
Details
05-01-2023
5.00
Left Tank Vent Line Proseal and Flared
Details
05-01-2023
4.50
Left Fuel Tank Inboard Rib Prosealed
Details
05-01-2023
4.50
Installed the Fuel Tank Vent Line
Details
05-01-2023
2.50
Installed and prosealed OB fuel tank rib
Details
05-01-2023
12.00
Adding the fuel tank fitings
Details
04-30-2023
4.00
Pro Sealed Fuel Drain Flange
Details
04-30-2023
2.00
Left Fuel Tank Drain Flange
Details
04-30-2023
3.00
Bending Fuel Vent Lines
Details
04-29-2023
10.00
Proseal Riveting 1004 Ribs to tank
Details
04-29-2023
5.00
Left Fuel Tank Stiffeners Prosealed Riveted
Details
04-29-2023
3.00
Fuel Return Bung for EFII
Details
04-29-2023
1.50
Fuel Cap Flange
Details
04-28-2023
4.00
Back Riveting Lerft Tank Skin Stiffeners
Details
04-27-2023
3.00
Fuel Tank Prep
Details
04-27-2023
18.00
Deburring & Dimpling Fuel Tank Skins
Details
04-27-2023
5.00
Assembly of 1005 Fuel Tank Attach
Details
04-26-2023
6.00
Final Drilled ER Fuel Tank Skin Holes
Details
04-17-2023
3.00
Right Outboard LE Attach to Main Spar
Details
04-17-2023
4.00
Left Wing Leading Edge Riveted to Spar
Details
04-15-2023
1.00
Riveting Leading Edge Skin to Spar
Details
04-13-2023
2.00
Leading Edge Stall Warning Opening
Details
04-13-2023
4.00
Completed Stall Warning System Install
Details
04-12-2023
4.00
cutting out access panel from skin
Details
04-12-2023
5.00
Completed Outboard Leading Edge Riveting!!!!!!
Details
04-11-2023
9.00
Riveting Outboard Leading Edge Assembly
Details
04-10-2023
7.50
Dimpling LE skins
Details
04-08-2023
2.00
Riveting nutplates on LE splice strips
Details
04-03-2023
4.00
trimming leading edge skin for ER fuel tanks
Details
04-02-2023
2.00
cleco nutplates to ER tank splice strips
Details
04-01-2023
7.00
outboard leading edge modification PM
Details
04-01-2023
5.00
outboard leading edge AM
Details
03-31-2023
4.00
wing conduit runs
Details
03-30-2023
2.00
trimming leading edge skins for ER fuel tanks
Details
03-28-2023
11.00
right wing top skin riveting
Details
03-25-2023
8.00
Top Wing Skin Riveting
Details
02-24-2023
2.00
countersinking Inboard Top Skin nutplate attach ri
Details
02-23-2023
4.00
blending top wing skins
Details
02-14-2023
7.00
riveting ribs to main spar
Details
02-09-2023
10.00
rear spar assembly
Details
02-09-2023
5.00
making aileron hinge brackets
Details
02-09-2023
2.00
Finsih Kit Seats Arrive!!
Details
02-03-2023
4.00
Riveting Main Spar Nutplates and CS Holes
Details
02-03-2023
6.00
More Riveting Main Spar Nutplates
Details
01-21-2023
4.00
Match drilling Doubler for ER fuel tanks
Details
01-20-2023
4.00
RV10 Finish Kit Arrival
Details
01-20-2023
3.00
More Unpacking of the Finish KIt
Details
01-20-2023
5.00
Main Spar Alteration Clecoing ER Tank Doubler
Details
01-19-2023
2.50
alteration of main spar for ER fuel tanks
Details
01-18-2023
3.00
Modifying Main Spar for ER Tank Doubler
Details
01-18-2023
4.50
match drilling wing J stiffeners
Details
01-13-2023
3.00
wing spar extension
Details
07-21-2022
9.00
riveting VS skin
Details
07-19-2022
5.00
Dimple Debur and Prime
Details
07-16-2022
0.20
dimpling VS and missed hole oops
Details
07-13-2022
6.50
VS initial construction
Details
06-22-2022
6.50
Empennage Arrives and begin inventory
Details
SITE NAVIGATION
Contact Builder
RV10 Home
Category
# Logs
# Hours
All
132
503
Aileron
11
30
Aileron Bellcrack
4
11
Bottom Wing Skins
6
17
Empennage
2
7
ER fuel tanks
25
84
Finish Kit
3
9
Flaps
6
18
Fuel Drain Flange
1
4
Fuel Level Sender
2
10
Fuel Tank Attach
1
6
Fuel Tank Fittings
2
20
Fuel Tank Leak Test
2
4
Fuel Tank Skin
3
27
Fuel Tank Vent
2
10
Fuel Vent Lines
1
3
Fuselage Bulkheads
5
5
IB Fuel Level Sender
1
3
LE Attatch to Spar
1
3
Locking Fuel Caps
1
1
OB Fuel Tank Rib
1
2
Stall Warning System
3
10
Vertical Stabilizer
3
20
wing conduit
2
7
Wing LE Spar
3
8
Wing leading edge sp
3
8
Wing OB Leading Edge
7
38
Wing Outboard Leadin
7
38
Wing Spar
2
8
Wing Spar ER tank
4
14
Wing Spar ER tank Al
4
14
Wing Spar Nutplates
2
10
Wing Top Skin
1
2
Wing Wiring
2
3
Wings
9
49
Copyright © 2001-2024 Matronics. All Rights Reserved.