KitLog pro

Powered By Kitlog Pro v2.0

John's RV10 Project Build
' style=
Date:  4-29-2023
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Proseal Riveting 1004 Ribs to tank

Okay, so today was a long day with using this proseal. Getting use to using this will come with time but it is not as bas as I though.

I spent my entire day off today getting messy in the garage with proseal....
I finished all the left fuel tank1004 ribs. Pictured below you will see all ribs prosealed and riveted in place on the left wing. The top side of the skin was a little bit more difficult because of the reach further down the skin on a slight angle. I had to make sure my rivet gun and bucking bar were exactly positioned properly so I would not have any oopsies.

All went wel but it was very time consuming. I took my time but used the entire day to make sure this was done properly. I did not rush and I was extremely satisfied with the results.

I must of used 1/2 gallon of asetone and 50 pairs of gloves!
' style=

left fuel tank

left fuel tank

' style=

left fuel tank 2

left fuel tank 2

' style=

left fuel tank 3

left fuel tank 3

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.