Powered By Kitlog Pro v2.0
Building Integrity
Long Ez
Canopy
Work Logs Found:
94
Category Work Time:
226 Hours
Date
Hours
Work Log Summary
Details
12-03-2018
1.00
test
Details
05-20-2018
0.50
The canopy is on and better than ever
Details
01-10-2015
0.50
Weather seal
Details
11-04-2014
2.00
Backup Latch hook floxed in
Details
10-29-2014
3.00
Added security
Details
09-09-2014
0.00
The canopy is cleaned and installed 2
Details
09-09-2014
8.00
The canopy is cleaned and installed
Details
05-11-2014
1.00
Scratch repair
Details
05-07-2014
2.00
Strike out
Details
04-23-2014
1.50
Lift tab
Details
03-23-2014
0.00
Cleanup, tape up, lock down 2
Details
03-23-2014
4.00
Cleanup, tape up, lock down
Details
03-17-2014
1.00
Fitting the canopy hinges
Details
03-14-2014
1.00
Re-Alignment
Details
03-12-2014
0.00
Latch hardware install 3
Details
03-12-2014
0.00
Latch hardware install 2
Details
03-12-2014
7.00
Latch hardware install
Details
03-11-2014
3.00
Latches and pins
Details
03-11-2014
0.50
Canopy install
Details
06-26-2013
2.00
Last 2 plies on the turtledeck
Details
06-16-2013
2.50
Turtle Deck interior Carbon
Details
06-10-2013
2.00
Turtle deck interior sanding
Details
06-08-2013
0.00
Glassing the turtle Deck 2
Details
06-08-2013
6.00
Glassing the turtle Deck
Details
06-06-2013
0.00
Turtle Deck work 2
Details
06-06-2013
5.00
Turtle Deck work
Details
05-31-2013
4.00
Rear turtle deck install
Details
05-22-2013
0.50
Rear turtle deck begins
Details
05-20-2013
1.50
Let's get it even better.
Details
05-20-2013
1.00
Latch trim
Details
04-30-2013
1.00
Strippin it
Details
04-29-2013
1.00
Oops be MORE gone
Details
04-27-2013
1.50
oops be gone
Details
04-14-2013
2.00
trimming and glass
Details
04-13-2013
1.50
Aft glass work
Details
04-12-2013
0.00
Glassing the hardpoints 2
Details
04-12-2013
4.00
Glassing the hardpoints
Details
04-10-2013
0.00
Hardpoints installed 2
Details
04-10-2013
4.00
Hardpoints installed
Details
04-09-2013
2.45
Preliminary Gas Spring locations
Details
04-05-2013
2.00
Re-installing the goods
Details
04-03-2013
4.50
Nothin Special
Details
03-30-2013
9.00
4 plies underneath
Details
03-28-2013
3.00
Redesign
Details
03-27-2013
3.50
Hardpoints made and floxed in
Details
03-25-2013
0.00
Canopy Pins located and tested 2
Details
03-25-2013
3.00
Canopy Pins located and tested
Details
03-24-2013
2.50
Hinge point glass
Details
03-23-2013
4.50
Carbon and Glass all over
Details
03-19-2013
6.50
Frame prep for glass
Details
03-18-2013
2.50
Frame foam
Details
03-17-2013
3.00
First Canopy Test
Details
03-15-2013
3.00
Hinge Hardpoint and tape line
Details
03-12-2013
0.50
Canopy test fit on hinges
Details
03-12-2013
2.50
Cam Lock Pin holes drilled
Details
03-10-2013
2.00
Rotary Cam Locks
Details
03-09-2013
0.00
Carving Foam and latch hardpoints 2
Details
03-09-2013
6.50
Carving Foam and latch hardpoints
Details
03-08-2013
0.25
Canopy placement
Details
03-05-2013
0.75
Hardpoint flox joint
Details
03-02-2013
2.50
Canopy Hinge installment
Details
02-25-2013
2.00
Canopy Hinge nutplates
Details
02-09-2013
2.00
Canopy line trimming
Details
02-09-2013
1.00
Canopy hinges
Details
02-03-2013
0.50
knife trimming
Details
02-02-2013
8.00
Carbon Canopy
Details
02-01-2013
2.00
Turtle deck design
Details
01-31-2013
0.40
knife trim
Details
01-30-2013
1.00
The Jury is in...
Details
01-30-2013
2.50
glassing the forward deck
Details
01-29-2013
3.00
More fitting and glassing
Details
01-29-2013
3.00
canopy removed and prepped
Details
01-27-2013
0.00
Turtle deck2
Details
01-27-2013
5.00
Turtle deck
Details
01-26-2013
3.00
Perfectionism is a curse
Details
01-25-2013
6.00
Canopy Hinge research
Details
01-23-2013
2.50
more sanding
Details
01-21-2013
7.00
Design and carving
Details
01-20-2013
0.00
Canopy Foam 2
Details
01-20-2013
9.00
Canopy Foam
Details
01-19-2013
3.00
Discoat and trial fit
Details
01-18-2013
0.50
more discoat
Details
01-17-2013
3.00
The canopy has landed
Details
01-12-2013
4.00
My Favorite position :)
Details
01-12-2013
3.00
.....record scratch...!!!!
Details
01-10-2013
4.00
Prep for canopy mounting
Details
01-09-2013
0.50
Discoat underside
Details
01-08-2013
2.50
Trimmed, cleaned, and coated
Details
01-07-2013
3.00
Time for plexiglass
Details
05-07-2012
1.00
Filling canopy access hole
Details
05-01-2012
1.00
Prep and dry micro the access hole
Details
04-30-2012
1.00
Glassing the Canopy hatch access hole
Details
04-27-2012
1.00
Filling the canopy access door
Details
04-14-2012
0.50
Removing the canopy access door
Details
SITE NAVIGATION
Contact Builder
Long Ez Home
Category
# Logs
# Hours
All
2163
5429
Airframe Tweaking
4
6
Avionics
89
262
Canard
44
65
Canopy
94
226
Control System
95
279
Cowling
129
363
Electrical System
36
102
Elevators
5
15
Engine
421
934
Finishing
561
1584
Firewall
32
92
FLIGHT TESTING
41
58
Fuel system
24
48
Fuse Exterior
11
16
Fuselage
126
246
Instrument Panel
4
15
Landing Brake
14
21
Main Landing Gear
64
162
Miscellaneous
31
43
Nose and Nose gear
111
236
Plans
2
43
Prop
26
32
Scheduled Maintenanc
2
3
Seat Belts
2
3
Shop Supplies
18
57
Spar
19
41
Strakes
73
228
The Beginning
1
The Shop
18
57
Throttle
3
8
Weight and Balance
6
10
Winglets and Rudders
16
44
Wings
41
130
Copyright © 2001-2024 Matronics. All Rights Reserved.