Powered By Kitlog Pro v2.0
Bob Leffler's RV-10
RV-10
Ailerons
Work Logs Found:
13
Category Work Time:
27 Hours
Date
Hours
Work Log Summary
Details
04-10-2010
1.00
Left Aileron Brackets
Details
02-25-2009
1.00
Riveted trailing edge of both ailerons
Details
02-11-2009
1.00
More right aileron assembly
Details
02-10-2009
2.00
Started assembly and riveting the right aileron
Details
02-09-2009
3.00
Assembled and riveted left aileron
Details
02-05-2009
1.00
Starting to assemble the left aileron
Details
01-25-2009
5.00
Cleaned, etched, alodined aileron and flap parts
Details
01-23-2009
2.00
Debur and dimple aileron parts
Details
01-22-2009
2.00
Dimple and debur aileron skins and spar
Details
12-01-2008
0.25
Disassemble ailerons
Details
11-23-2008
4.00
Match drilling left and right ailerons
Details
11-22-2008
1.00
Aileron skins
Details
11-21-2008
3.50
Started right and left ailerons
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1456
3251
Ailerons
13
27
Airworthiness
1
2
Avionics
8
21
Brakes
10
24
Cabin Cover
18
50
Condition Inspection
1
Control System
9
15
Diversions
46
6
Doors
77
144
Electrical
24
60
Elevator
38
80
Empennage
27
56
Engine
1
Final Assembly
58
174
Finish Kit
167
541
Firewall Forward
91
228
First Flight
1
1
Flaps
22
35
Flying
3
Fuel System
4
10
Fuel Tanks
45
80
Fuselage
192
375
Horizontal Stab
26
59
Interior
14
22
Lighting
4
5
Maintenance
3
3
Milestones
11
0
Miscellaneous
35
78
Paint
71
139
Panel
118
375
Phase I
12
16
Pre-Flight
7
34
Prep
4
18
Prop
1
2
Rudder
16
34
Shop
20
56
Tailcone
46
96
Tools
12
12
Vertical Stabilizer
14
44
Wing Leading Edge
38
57
Wings
1
Wings
147
272
Copyright © 2001-2024 Matronics. All Rights Reserved.