Powered By Kitlog Pro v2.0
Bob Leffler's RV-10
RV-10
Rudder
Work Logs Found:
16
Category Work Time:
34 Hours
Date
Hours
Work Log Summary
Details
07-09-2011
0.10
Dimple Rudder for Fairing
Details
07-08-2011
2.00
Rudder Fairing and Strobe
Details
04-15-2007
1.50
Final Rudder Assembly
Details
04-14-2007
3.00
Rudder Assembly
Details
04-14-2007
3.00
Rivet Rudder
Details
04-07-2007
4.00
Rudder riveting, rudder trim finalize
Details
04-07-2007
1.00
Joining the skins is complete
Details
04-07-2007
2.00
Final rudder assembly and proseal
Details
04-05-2007
1.00
Rivet stiffners
Details
03-31-2007
2.00
Primed rudder parts
Details
03-30-2007
3.00
Alodine Rudder part
Details
03-29-2007
2.00
Etched Rudder parts
Details
03-24-2007
4.00
Dimple skins
Details
03-23-2007
1.00
Cut rudder trim holes
Details
02-13-2007
3.00
Rudder match drilling
Details
02-12-2007
1.50
Match drilling rudder ribs
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1456
3251
Ailerons
13
27
Airworthiness
1
2
Avionics
8
21
Brakes
10
24
Cabin Cover
18
50
Condition Inspection
1
Control System
9
15
Diversions
46
6
Doors
77
144
Electrical
24
60
Elevator
38
80
Empennage
27
56
Engine
1
Final Assembly
58
174
Finish Kit
167
541
Firewall Forward
91
228
First Flight
1
1
Flaps
22
35
Flying
3
Fuel System
4
10
Fuel Tanks
45
80
Fuselage
192
375
Horizontal Stab
26
59
Interior
14
22
Lighting
4
5
Maintenance
3
3
Milestones
11
0
Miscellaneous
35
78
Paint
71
139
Panel
118
375
Phase I
12
16
Pre-Flight
7
34
Prep
4
18
Prop
1
2
Rudder
16
34
Shop
20
56
Tailcone
46
96
Tools
12
12
Vertical Stabilizer
14
44
Wing Leading Edge
38
57
Wings
1
Wings
147
272
Copyright © 2001-2024 Matronics. All Rights Reserved.