KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
Work Logs Found: 108
Category Work Time: 315 Hours
 Date
Hours
Work Log Summary

Details

 02-05-2012
4.00
Nut plates for gap fairings
Details
       

 02-04-2012
5.00
Installed and rigged the flaps
Details
       

 01-08-2012
3.50
Strobes and lenses
Details
       

 01-07-2012
1.50
Left wing,strobes and internal aluminum support do
       

 01-06-2012
3.00
Strobes and internal aluminum support doublers
Details
       

 01-05-2012
3.00
Strobe lenes installed
Details
       

 01-05-2012
1.50
Left wing fiber glass wing tip
       

 01-04-2012
2.00
Right wing tip
Details
       

 12-29-2011
5.00
Right aileron auto pilot servo
Details
     

 07-11-2009
8.00
Fit right flap and move wing to cradle
Details
       

 06-27-2009
6.00
Rivet bottom wing skins
Details
       

 05-30-2009
1.00
Tech councilor inspection right wing
Details
       

 05-30-2009
0.50
Replace two dud rivets with NAS rivets
Details
       

 05-25-2009
3.00
Rivet aileron and flap support bracket
Details
       

 05-25-2009
4.00
Aileron brackets
Details
       

 05-17-2009
0.00
Top wing skins
       

 05-17-2009
6.00
Rivet top wing skins
Details
       

 05-05-2009
0.10
Tank back in place
Details
       

 05-04-2009
2.00
Riveted right wing outboard leading edge
Details
       

 04-20-2009
1.00
Install landing light lens
Details
       

 04-19-2009
3.00
Right wing landing light
       

 04-14-2009
4.00
Install rear fuel tank baffle
Details
     

 04-12-2009
12.00
Proseal Right tank
Details
       

 03-30-2009
2.00
Fuel tank stiffeners, drain and filler
Details
       

 03-29-2009
4.00
Rivet right leading edge skins
Details
       

 03-22-2009
0.00
Fuel fittings
       

 03-22-2009
0.00
Fuel fittings
Details
       

 03-22-2009
6.00
Capacitive fuel senders and tank stiffeners
Details
       

 03-20-2009
1.50
Dimple joint plate and tank skin
Details
       

 03-16-2009
2.50
Test install tank onto wing
Details
       

 03-15-2009
5.00
Z brackets and baffle plate
       

 03-09-2009
3.00
Install joint plate and back drill rib
       

 03-05-2009
2.50
Dimple and etch prime wing skins
Details
       

 03-02-2009
2.50
Wing walk doubler and dimple top skins
Details

 02-24-2009
3.00
Rivet ribs to front and rear spar
Details
       

 02-19-2009
1.00
Prepare and etch prime nose ribs
       

 02-18-2009
1.00
Left aileron pins
Details
       

 02-17-2009
1.50
Counter sunk remaining holes in right spar
Details
       

 02-15-2009
2.00
Drill holes in ribs for conduit and etch prime
Details
       

 02-13-2009
2.00
Rivet rear spar
Details
       

 02-12-2009
1.50
Right rear spar
Details

 02-09-2009
4.00
Rear spar
Details
       

 02-08-2009
8.00
Tie down bracket
Details
       

 02-01-2009
8.00
Prep right wing spar
     

 01-26-2009
0.00
Left wing complete
     

 01-26-2009
0.00
Install Flap
Details
       

 01-26-2009
6.00
Construct control rods
Details
       

 01-25-2009
5.00
Riveting left flap
Details
       

 01-25-2009
0.00
Rivet left flap part 2
Details
       

 01-15-2009
2.00
Left flap
Details
       

 01-13-2009
2.00
Flap bracket
Details

 01-12-2009
2.00
Left Flap
Details
       

 01-11-2009
0.00
Left wing pretty much complete
Details
       

 01-11-2009
9.00
Close the bottom of the wing
Details
       

 01-10-2009
4.00
Left aileron
       

 01-09-2009
4.00
Left Aileron
       

 01-09-2009
0.00
Left aileron
       

 01-08-2009
3.00
Left aileron
Details
       

 01-06-2009
5.00
Fitted outboard leading edge and light
Details
       

 12-23-2008
0.00
Landing light
Details
       

 12-23-2008
5.00
Duckworks Landing Light
Details
       

 12-21-2008
0.50
Drilled hole for Pitot
       

 12-20-2008
0.25
Leak testing tanks
Details
     

 12-20-2008
8.00
Aileron gap seal and flap brace
Details
       

 12-20-2008
0.00
Aileron gap seal and flap brace
       

 12-17-2008
3.00
Aileron Brackets
Details
       

 12-14-2008
4.00
Rivet top skins to left wing
Details
       

 12-13-2008
7.00
Debur, dimple and etch prime
Details
       

 12-10-2008
1.00
Inspection plate installed into left tank
     

 12-09-2008
2.50
Install back plate on left tank
Details
       

 12-06-2008
2.00
Outboard nose skin and ribs dimpled and primed
Details
       

 12-04-2008
1.00
Leading edge joint plate
     

 12-03-2008
2.00
Installed inboard tank rib
Details
       

 11-24-2008
4.00
Installed last 2 outside baffels
Details
       

 11-21-2008
1.50
Install 1 rib into left tank
Details

 11-19-2008
2.50
Installed 2 rib into left tank
Details

 11-16-2008
3.00
Fuel pick up and vent fitting
Details
       

 11-14-2008
1.00
Installed 1 outboard rib into tank
Details
       

 11-11-2008
1.00
Proseal fuel cap
Details
       

 11-10-2008
3.50
Left fuel tank stiffeners
Details
       

 11-08-2008
5.00
Prepare left fuel tank
Details
       

 11-07-2008
2.00
Prep fuel tank skin and install inspection ring
       

 11-06-2008
1.00
Install capacitive sender
Details
       

 10-30-2008
2.50
Fuel tank attach brackets
Details
       

 10-27-2008
3.00
Fuel tank nose ribs
Details
     

 10-26-2008
2.00
Drill the joint plate for the fuel tank
Details
       

 10-23-2008
3.00
Fuel tank support brackets
Details

 10-21-2008
1.20
Tank support brackets
Details
       

 10-19-2008
0.00
Removing the vinyl from the skins
       

 10-19-2008
9.00
Install wing skins
Details
       

 10-19-2008
1.00
Install the leading edge rib and joint strip
Details
       

 10-17-2008
2.20
Level spar and hang top inboard skin
Details
       

 10-15-2008
2.50
Rivet ribs to left spar
Details
       

 10-12-2008
9.00
Back drill and etch prime ribs
Details
       

 10-09-2008
1.00
Installed ribs onto left spar
Details
       

 10-08-2008
1.00
Fluting nose ribs
     

 10-07-2008
3.00
Fluting ribs
Details
       

 10-07-2008
5.00
Edge finishing wing ribs
Details
       

 10-06-2008
0.00
Rivet the doubler brackets
       

 10-06-2008
6.00
Left rear spar preparation
       

 10-06-2008
0.00
Etch priming of the rear spar
       

 10-04-2008
7.00
Left spar nut plates
Details
       

 10-04-2008
0.00
Left spar mounted in jig
       

 10-04-2008
0.00
#6 nut plates riveted and counter sunk
Details
       

 10-03-2008
4.00
Built wing jig
Details
       

 04-03-2008
1.50
Edge finishing ribs
Details

 04-01-2008
4.00
Flanging and Fluting W710 ribs
Details
     

 03-31-2008
4.00
Edge finishing ribs
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.