KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  11-8-2008
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Prepare left fuel tank

I forgot that each of the nose ribs have two rivet holes that need to be back drilled when installed into the tank, so I reassembled the tank, back drilled the two holes in each rib, removed it again, deburred it, dimpled and re-installed into the tank...slow progress.
I also installed the fuel cap, and machine counter sunk the rear skin where it gets riveted to the rear baffle plate. I still need to do the same for the fuel drain and then make the fuel cap support bracket for the breather line.
But all things going OK it should be a go for the first stage of assembly when the stiffeners get back riveted in place...first encounter with pro-seal, should be interesting.
' style=

Stripped blue plastic from tank

Stripped blue plastic from tank

' style=

Machine countersunk rear baffle plate skin attachment

Machine countersunk rear baffle plate skin attachment

' style=

Installed fule cap

Installed fule cap

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.