KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  11-10-2008
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Left fuel tank stiffeners

Ian came over tonight to lend a hand and I have to say the process went quite well except that my scales packed it in, so I eye balled the 10:1 measurement of white goop to black goop. The first batch I think got a little to much black goop as it started to go off in 45 minutes rather than the expected 60, but all in all pretty good.
' style=

Tank taped off to stop proseal getting into places it should'nt

Tank taped off to stop proseal getting into places it should'nt

' style=

Measuring stuff all ready to go

Measuring stuff all ready to go

' style=

Stiffeners and fuel drain back riveted into place

Stiffeners and fuel drain back riveted into place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.