KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  4-14-2009
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Install rear fuel tank baffle

This evening Ian came and lent a hand to close up the tank, even though we only had to install the rear baffle and Z brackets, it took ages because there are soooo many rivets.

Using hte squeezer to do the side skins made the job easy, but poping off the rivets for the Z brackts was though going.

FInishing at 10pm, I was pleased that Ian ahd come over and the job was done. Only the inspection cover left to install.

All the rivets have had an extra coat of proseal added to their exposed surfaces which is what you can see in this photo.
' style=

Rear baffle installed and riveted to the skins and Z brackets installed

Rear baffle installed and riveted to the skins and Z brackets installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.