KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  4-12-2009
Number of Hours:  12.00
Manual Reference:  
Brief Description:  Proseal Right tank

On Sunday while waiting for Anne-Marie to come home, I got stuck into prosealing and riveting the ribs into the right side fuel tank. With this done I realised that I have forgotten to install the vent line, so I carefully unrolled it and fed it through all the pre-drilled holes in the ribs, took a measurement and cut it to size. Fitting the vent line into the gromets and trying to insert the capacitive sender wires at the same time was a real pain, two hours later I had the vent line installed and the capacitive senders installed and checked for shorts etc. all was good. I finished off by prosealing the fuel line fitting onto the tank inspection cover and installing the vent line fitting. Wow big day.
' style=

Inboard end with black goop applied

Inboard end with black goop applied

' style=

Outboard end, more black goop

Outboard end, more black goop

' style=

Top view all riveted and prosealed

Top view all riveted and prosealed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.