With the ribs clecoed into place I now need to back drill the main spar and rear spar holes to the correct size into the ribs, then disassemble, debur and etch prime before re-installing and riveting in place. I also need to drill the hole for the wiring conduit to about 20.5mm or I think 0.82 inches.