750 Cruzer
Empennage
Work Logs Found:
54
Category Work Time:
107 Hours
Date
Hours
Work Log Summary
Details
05-04-2023
2.10
Set rudder deflection
Details
05-03-2023
1.00
Struggle to adjust rudder swing
Details
12-15-2022
2.40
Finish empennage
Details
12-02-2022
2.00
Riveted vertical fin parts
Details
11-29-2022
1.50
Finalizing Vertical stab installation
Details
11-23-2022
1.70
Wing Rack / continue rudder cable outlets
Details
11-11-2022
1.50
Install rudder, start rudder cable fairing install
Details
10-25-2022
2.20
Misc Tail tasks
Details
10-22-2022
3.30
Tail finish-up activities
Details
10-20-2022
2.00
Up-drill / fit lower fin skin & vert stab lower ed
Details
10-18-2022
2.50
finishing up (closer) to the lower vertical fin
Details
10-14-2022
1.50
Fit lower vertical fin
Details
10-13-2022
2.10
Add lower vertical fin brackets
Details
10-11-2022
1.00
Vertical stab
Details
09-29-2022
2.80
More tail work / misc
Details
09-20-2022
2.30
More elevator finish tasks
Details
09-17-2022
2.00
Work on elevator travel / attach counterweights /
Details
09-15-2022
1.80
Prep elevator for cables / Start wing tip strobe m
Details
09-13-2022
2.30
More elevator prep
Details
09-10-2022
2.00
Worked on elevator cable pulleys.
Details
09-08-2022
2.00
More work on horizontal
Details
09-05-2022
2.00
Drill Horizontal Stab to Fuselage
Details
12-17-2020
2.00
Prepping tail for closure
Details
11-30-2020
0.50
"finessing" the elevator to horiz stab clearance
Details
11-28-2020
1.30
Start rivet of horizontal stab tips to stabilizer
Details
11-04-2020
2.80
Continuation of Horiz Stab Service Builletin
Details
11-03-2020
3.60
Horiz Stab Service Bulletin
Details
02-03-2018
1.80
Check Alignment / Rivet Stab Hinge / Start Flapero
Details
02-01-2018
2.00
Rework Trim Tab Operation
Details
01-31-2018
2.10
Rivet Elevator
Details
01-30-2018
3.10
Debur, Final Fit, Final Cleco, some Manual Rivetin
Details
01-29-2018
2.00
Finish Trial Fitment of Elevator
Details
01-27-2018
3.20
Elevator Control Arms / Bracing / Trim Tab
Details
01-27-2018
0.00
Continuation of Elevator population
Details
01-24-2018
1.80
Drill Elevator Hinge
Details
01-23-2018
2.50
Parts Fitment on Elevator / Mate with Horizontal S
Details
01-21-2018
1.30
Finish Elevator Parts Prep / Cam Bevel Gear
Details
01-20-2018
1.00
Debur / Sort / De-label elevator parts
Details
01-19-2018
0.00
Vertical Fin Completed (second part)
Details
01-19-2018
2.30
Finish Vertical Fin
Details
01-17-2018
0.50
Debur spar; remove wrong rivet, test fit hinge to
Details
01-15-2018
1.20
Cleanup / Debur / Label removal / Riveting
Details
01-13-2018
4.50
Finish Horizontal Stabilizer
Details
01-11-2018
2.30
Finish right tip; disassemble & debur
Details
01-09-2018
2.30
Finish drilling elevator hinge; mount tips
Details
01-08-2018
0.80
Drilled elevator hinge
Details
01-06-2018
0.40
Close top of Horiz Stab
Details
01-04-2018
1.70
Replace 2 Rivets, install end ribs, fab L-angles
Details
01-03-2018
2.30
Skin Lower Side Horiz Stab
Details
01-01-2018
1.20
Add'l Riveting, Angle Trim, Skin Prep
Details
12-30-2017
1.30
Finished Preliminary Riveting Horiz Stab Skeleton
Details
12-29-2017
2.70
Horiz Stab Skeleton
Details
12-20-2017
1.20
Debur Horizontal Tail Skeleton
Details
11-17-2017
7.00
Completed Rudder / Attended Workshop
Details
SITE NAVIGATION
Contact Builder
750 Cruzer Home
Category
# Logs
# Hours
All
869
2789
00 - Kit Arrival
20
41
00 - Miscellaneous
14
100
01 - Empennage
54
273
02 - Wing Spars
24
86
03 - Wings
109
464
04 - Flaps & Aileron
19
82
Avionics
63
123
Controls
14
100
Empennage
54
273
Engine
83
125
Fuselage
188
336
Landing Gear
19
82
Miscellaneous
55
113
Paint
24
86
Systems
20
41
Wings
109
464