Powered By Kitlog Pro v2.0
Zenith CruZer & Sonex Logs
750 Cruzer
Engine
Work Logs Found:
83
Category Work Time:
125 Hours
Date
Hours
Work Log Summary
Details
04-16-2023
2.30
Safety wire engine parts / remove plexi paper cove
Details
12-17-2022
2.40
Misc items
Details
04-13-2022
2.30
Engine checkout / mags plus prep for installing up
Details
03-27-2022
1.00
First sustained engine start
Details
03-03-2022
2.00
SUCCESS! First engine start!
Details
02-28-2022
1.00
Checking spark
Details
02-23-2022
1.80
More start attempts
Details
02-16-2022
2.00
More start attempt
Details
02-09-2022
2.00
First Sart Attempt
Details
12-14-2021
1.00
Fiddled with prop tip distance.
Details
12-13-2021
0.50
Install propeller
Details
12-10-2021
2.00
Scat hose, plug wire loom, etc
Details
12-06-2021
1.00
Fab'd cable for alternator to battery
Details
11-24-2021
1.20
Finish up baffles
Details
11-23-2021
0.30
reinforce hole for crankcase breather hose
Details
11-22-2021
1.50
More baffle work
Details
11-19-2021
1.40
instsall pilot side intercylinder baffles
Details
11-16-2021
1.40
More baffle work
Details
11-14-2021
0.80
Begin engine cooling baffle installation
Details
11-13-2021
1.90
Exhaust completed
Details
11-12-2021
2.00
Finish wire ties; mess with exhaust
Details
10-28-2021
1.50
Install exhaust headers
Details
10-23-2021
2.40
Mixture Cable
Details
10-21-2021
0.70
mixture cable adjustments
Details
10-17-2021
3.00
Finish throttle cable, start mixture cable
Details
10-16-2021
1.60
Continue with throttle connection at carb
Details
10-10-2021
0.00
Part 3: Throttle cable preliminary fitment
Details
10-10-2021
0.00
Part 2: Carb heat cable installation
Details
10-10-2021
3.10
Part 1: Carb Heat / Air Filter
Details
10-09-2021
2.30
Add carb heat box
Details
10-08-2021
0.80
Attach Carb
Details
09-20-2021
0.80
More HD wiring
Details
09-10-2021
1.10
power/sensor wiring at engine
Details
09-09-2021
3.00
Misc engine tasks
Details
09-03-2021
1.10
general checkout
Details
08-24-2021
1.30
Install engine to airframe
Details
08-20-2021
1.30
Misc prep work
Details
08-08-2021
1.20
Install Alternator
Details
05-29-2021
2.00
Misc Engine Tasks
Details
05-21-2021
0.80
Install intake manifold tubes
Details
05-20-2021
2.50
Install and time mags, install starter, install in
Details
04-26-2021
1.50
New pushrod, paint & install rocker covers
Details
04-11-2021
3.50
Swap purshrods around & mount oil sump & intake ma
Details
04-10-2021
1.00
Torque Cylinders
Details
04-10-2021
1.00
Install Pushrods & Rockers
Details
04-09-2021
3.20
Install two remaining cylinders
Details
04-01-2021
0.50
Cylinder prep
Details
03-31-2021
0.70
Cylinder #3 prep
Details
03-29-2021
1.30
Install first 2 cylinders
Details
03-28-2021
0.90
Cylinder prep
Details
03-21-2021
0.80
Install left side pushrod tube housings
Details
02-20-2021
1.00
Install 2 pushrod housings
Details
02-19-2021
0.70
Parts prep for cylinder installation
Details
02-10-2021
0.60
parts cleaning
Details
02-08-2021
1.50
Parts prep
Details
02-07-2021
2.50
Attach accessory case
Details
02-03-2021
2.50
Rework Engine screwups
Details
02-02-2021
4.50
Engine case assembly
Details
01-31-2021
2.00
Engine assembly prep
Details
01-29-2021
0.50
engine assembly prep
Details
01-28-2021
1.60
Crank work, Case prep
Details
01-26-2021
2.60
Wire cam gear / install conn rods
Details
01-25-2021
2.00
Wrap up accessory case / prep internals
Details
01-24-2021
1.70
Install oil pump
Details
01-22-2021
1.20
Prep parts for paint
Details
01-19-2021
1.80
more parts prep
Details
01-09-2021
2.10
more parts cleaning
Details
01-08-2021
1.00
parts cleaning
Details
06-07-2020
0.60
Cylinder prep
Details
11-13-2019
4.00
Fuel drain prep
Details
06-24-2019
2.30
Secure comm cables & initial fit motor mount
Details
02-20-2019
1.20
Re-mic crankshaft journals
Details
05-30-2018
0.00
Text Continuation from other 5/30 post
Details
05-29-2018
0.50
Mic the journals
Details
01-13-2018
1.50
Prep Case for Shipment
Details
01-10-2018
0.00
Crankshaft checkout
Details
01-09-2018
1.00
Crankshaft Dimension Checks
Details
01-08-2018
0.80
Remove rods; test fit crank in case; bag lifters
Details
01-06-2018
0.20
Separated case halves
Details
12-24-2017
2.00
Removed Pistons, Valve Stuff, split case
Details
12-23-2017
2.50
Remove Cylinders & other misc parts
Details
12-20-2017
0.30
Cylinder removal progress
Details
11-03-2017
2.00
Engine Choice Made! (and purchased!)
Details
SITE NAVIGATION
Contact Builder
750 Cruzer Home
Category
# Logs
# Hours
All
869
2789
00 - Kit Arrival
20
41
00 - Miscellaneous
14
100
01 - Empennage
54
273
02 - Wing Spars
24
86
03 - Wings
109
464
04 - Flaps & Aileron
19
82
Avionics
63
123
Controls
14
100
Empennage
54
273
Engine
83
125
Fuselage
188
336
Landing Gear
19
82
Miscellaneous
55
113
Paint
24
86
Systems
20
41
Wings
109
464
Sonex Home
Copyright © 2001-2025 Matronics. All Rights Reserved.