Date
|
Hours
|
Work Log Summary
|
Details
|
04-01-2011
|
200.00
|
Performing condition inspection
|
Details
|
|
|
01-05-2010
|
0.50
|
601XL Upgrade Kit
|
Details
|
|
|
10-19-2008
|
1.00
|
Final Paint Job
|
Details
|
|
|
10-06-2008
|
1.00
|
Mask and Paint Aircraft
|
Details
|
|
|
06-06-2008
|
0.10
|
The Rest of the commentary
|
Details
|
|
|
06-06-2008
|
0.75
|
First Flight in Pattern
|
Details
|
|
|
05-09-2008
|
0.40
|
First Flight
|
Details
|
|
|
03-11-2008
|
0.25
|
Engine run and short taxi
|
Details
|
|
|
03-09-2008
|
0.20
|
First Engine Run
|
Details
|
|
|
01-15-2008
|
1.00
|
Mixture control cable setup
|
Details
|
|
|
01-15-2008
|
2.00
|
Dual Throttle using MA3SPA carb
|
|
|
|
12-18-2007
|
2.00
|
After all wiring done and inspection OK'd more req
|
Details
|
|
|
12-16-2007
|
0.10
|
My Granddaughters checking out the aircraft
|
Details
|
|
|
12-15-2007
|
6.00
|
This is the day of Inspection
|
Details
|
|
|
12-13-2007
|
28.00
|
Adding wings and controls
|
|
|
|
12-07-2007
|
14.00
|
Six days and counting til inspection
|
|
|
|
11-29-2007
|
9.00
|
Finishing canopy and fitting to fuselage
|
Details
|
|
|
11-17-2007
|
6.00
|
Adding horizonal stabilizer to fueselage
|
|
|
|
11-15-2007
|
1.50
|
Wiring the panel
|
|
|
|
09-24-2007
|
0.50
|
Cowling Kit arrived
|
|
|
|
09-16-2007
|
0.10
|
My New Hangar
|
|
|
|
09-11-2007
|
6.00
|
Had to modify attachment points of stabilizer
|
Details
|
|
|
08-16-2007
|
5.00
|
Added mods to cowling
|
|
|
|
07-08-2007
|
3.00
|
Adding Components
|
|
|
|
06-11-2007
|
0.10
|
MicroSwitch Casualty
|
|
|
|
06-10-2007
|
2.50
|
Added fuel selector to center console
|
|
|
|
05-25-2007
|
2.00
|
Added circuit breakers
|
|
|
|
05-24-2007
|
12.00
|
Parking brake and lines filled with fluid
|
Details
|
|
|
05-15-2007
|
0.25
|
Called Zenith for OK on Line Position
|
Details
|
|
|
05-14-2007
|
1.50
|
Brake Pedals
|
Details
|
|
|
05-11-2007
|
1.00
|
Testing rudder pedal location
|
Details
|
|
|
05-11-2007
|
0.50
|
Tested location and effectiveness of Y stick
|
|
|
|
03-23-2007
|
2.00
|
Creating a small circuit breaker panel
|
|
|
|
03-19-2007
|
16.00
|
Fitting the brake lines.
|
|
|
|
03-13-2007
|
10.00
|
Pick Up Engine and Run on Dyno at WW
|
Details
|
|
|
03-13-2007
|
1.00
|
Getting ready to take the Corvair home
|
|
|
|
03-11-2007
|
14.00
|
Torqueing the an bolts properly for gear
|
Details
|
|
|
02-20-2007
|
4.00
|
Solder wires and mark them for trim
|
Details
|
|
|
02-16-2007
|
14.00
|
Installing Canopy Hardware
|
|
|
|
01-23-2007
|
1.00
|
Step Fairings installed
|
|
|
|
01-19-2007
|
12.00
|
Elevator controls and step fairings
|
Details
|
|
|
01-10-2007
|
6.00
|
Control Cables - Critical parts. Use Go, No Go Too
|
Details
|
|
|
01-09-2007
|
4.00
|
Added horn and top bushing
|
|
|
|
12-22-2006
|
2.50
|
Nosegear assembly
|
|
|
|
12-22-2006
|
3.00
|
Installing Nose Gear Bungee
|
Details
|
|
|
12-21-2006
|
3.00
|
Drill, tap threads for AN4 bolt into nose bearing
|
|
|
|
12-20-2006
|
3.00
|
Added CHT and EGT to panel
|
|
|
|
12-17-2006
|
4.00
|
Positioning the nose gear
|
|
|
|
12-16-2006
|
1.00
|
Close up photos of the instruments
|
|
|
|
12-15-2006
|
6.00
|
Steps
|
|
|
|
12-15-2006
|
12.00
|
Adding the instruments
|
Details
|
|
|
12-06-2006
|
16.00
|
Started cutouts on Instrument Panel
|
Details
|
|
|
11-27-2006
|
5.00
|
Temporary seats made of Leather
|
Details
|
|
|
11-24-2006
|
22.00
|
Add stringers to top skin. Add fairleads.
|
|
|
|
11-22-2006
|
32.00
|
Middle skin and stringers, seatbelt connection
|
Details
|
|
|
11-18-2006
|
8.00
|
Rebuilt KX-170B faceplate and knobs
|
Details
|
|
|
11-11-2006
|
1.00
|
WW working on my engine at the college
|
|
|
|
11-10-2006
|
48.00
|
Corvair College #10 (My Engine Being Built)
|
|
|
|
11-09-2006
|
6.00
|
Looking over the handiwork with wings above
|
|
|
|
10-30-2006
|
5.00
|
After spending about a month on vacation, got to w
|
Details
|
|
|
09-30-2006
|
24.00
|
Add top skin to fuselage
|
Details
|
|
|
09-23-2006
|
7.00
|
Gusset to hold flap motor
|
|
|
|
09-16-2006
|
15.00
|
Installed seats and control cover
|
Details
|
|
|
09-14-2006
|
8.00
|
Adding stick controls and leveling
|
|
|
|
09-08-2006
|
13.00
|
checking angles
|
Details
|
|
|
09-01-2006
|
36.00
|
Cockpit construction
|
Details
|
|
|
08-22-2006
|
25.00
|
Fuselage sides, floor setup on sawhorses
|
Details
|
|
|
08-19-2006
|
17.00
|
Setting Fuse on saw horses and alignment
|
Details
|
|
|
08-12-2006
|
15.00
|
Wing Spar and Jig
|
Details
|
|
|
08-09-2006
|
27.00
|
Cabin Floor and Rudder Controls
|
Details
|
|
|
07-13-2006
|
8.00
|
Firewall
|
Details
|
|
|
07-11-2006
|
4.00
|
Set flush rivets, cut Gear Channel, seat panel
|
Details
|
|
|
07-11-2006
|
3.00
|
Cut Vertical Stiffeners, add Cable Outlet fairing
|
Details
|
|
|
07-09-2006
|
7.00
|
Rear Panel and HT Attachment Brackets
|
Details
|
|
|
07-08-2006
|
8.00
|
Add Fuselage Sides
|
Details
|
|
|
07-07-2006
|
4.00
|
Add nutplates to, and position access cover
|
Details
|
|
|
07-06-2006
|
1.00
|
Caleb at Zenith approved edge distance
|
Details
|
|
|
07-05-2006
|
4.00
|
Rivet bottom skin and stiffeners. Cut Rudder Hinge
|
Details
|
|
|
06-30-2006
|
18.00
|
Lower Skin, Longerons, Stiffeners and HT Frames
|
Details
|
|
|
06-27-2006
|
3.00
|
Horizontal Tail, Fairleads
|
Details
|
|
|
06-26-2006
|
4.00
|
Inventory & Horizontal Tail
|
Details
|
|
|
06-19-2006
|
5.00
|
Loading at Factory
|
Details
|
|
|
12-21-2005
|
6.00
|
Put in fuel gauges on center console
|
|
|
|
07-22-2005
|
11.00
|
Final wiring of wing
|
|
|
|
07-03-2005
|
7.00
|
Pitot riveted into position
|
|
|
|
06-29-2005
|
12.00
|
Review of wing wiring
|
|
|
|
05-30-2005
|
5.00
|
Drill holes for nav/strobe light. Install exterior
|
|
|
|
05-07-2005
|
5.00
|
Wing Landing/Taxi Lights - Finish up
|
|
|
|
05-04-2005
|
16.00
|
Wing Landing/Taxi Light
|
|
|
|
05-03-2005
|
8.00
|
Wiring fuel tank second wing
|
|
|
|
04-23-2005
|
17.00
|
Finish trim tab, add pitot
|
|
|
|
02-24-2005
|
65.00
|
Showing both wings, building sender unit
|
|
|
|
01-15-2005
|
17.00
|
Final touch up before raising to ceiling
|
|
|
|
12-17-2004
|
45.00
|
Clean table, start second wing
|
|
|
|
12-14-2004
|
12.00
|
Finish Locker, add aileron and flaps for position
|
|
|
|
12-02-2004
|
4.00
|
String wire for lights
|
|
|
|
11-25-2004
|
6.00
|
Build the actual locker cover
|
|
|
|
11-22-2004
|
12.00
|
Baggage Locker
|
|
|
|
10-02-2004
|
7.00
|
Fit tank and drain
|
|
|
|
10-02-2004
|
2.00
|
Access cover for aileron bellcrank, overflow tube
|
|
|
|
09-01-2004
|
12.00
|
Cleco top skin to ribs, prepare tank for install
|
|
|
|
08-29-2004
|
15.00
|
Rivet bottom skin and roll nose skin into position
|
|
|
|
08-26-2004
|
9.00
|
Inboard and outboard sides, bottom skin
|
|
|
|
08-26-2004
|
12.00
|
add nose ribs and skin
|
|
|
|
08-24-2004
|
7.00
|
Add top skin and fuel cutout
|
|
|
|
08-22-2004
|
8.00
|
After assembly, remove them, check level and reass
|
|
|
|
08-17-2004
|
12.00
|
Bellcrank and stiffeners
|
|
|
|
08-15-2004
|
13.00
|
The ribs are adding up
|
|
|
|
08-13-2004
|
7.00
|
Starting the Wing
|
|
|
|
08-10-2004
|
6.00
|
Ailerons
|
|
|
|
08-07-2004
|
16.00
|
Flaps
|
|
|
|
08-04-2004
|
7.00
|
Layout flaps, install fairlead
|
|
|
|
08-04-2004
|
4.00
|
Got the Wings!
|
Details
|
|
|
05-24-2004
|
7.50
|
Cut out made for elevator trim, rudder fit and hor
|
|
|
|
05-21-2004
|
15.00
|
Building the elevator
|
|
|
|
05-15-2004
|
24.00
|
Started work on Elevator
|
Details
|
|
|
05-11-2004
|
55.00
|
Stabilizer and Elevator
|
Details
|
|
|
03-04-2004
|
21.20
|
The rudder kit
|
Details
|
|