KitLog pro

Powered By Kitlog Pro v2.0

SCOTT'S WEB SITE
Work Logs Found: 118
Category Work Time: 1333 Hours
 Date
Hours
Work Log Summary

Details

 04-01-2011
200.00
Performing condition inspection
Details
       

 01-05-2010
0.50
601XL Upgrade Kit
Details

 10-19-2008
1.00
Final Paint Job
Details
       

 10-06-2008
1.00
Mask and Paint Aircraft
Details
       

 06-06-2008
0.10
The Rest of the commentary
Details
     

 06-06-2008
0.75
First Flight in Pattern
Details
     

 05-09-2008
0.40
First Flight
Details
       

 03-11-2008
0.25
Engine run and short taxi
Details
       

 03-09-2008
0.20
First Engine Run
Details
       

 01-15-2008
1.00
Mixture control cable setup
Details
       

 01-15-2008
2.00
Dual Throttle using MA3SPA carb
       

 12-18-2007
2.00
After all wiring done and inspection OK'd more req
Details
       

 12-16-2007
0.10
My Granddaughters checking out the aircraft
Details
       

 12-15-2007
6.00
This is the day of Inspection
Details
       

 12-13-2007
28.00
Adding wings and controls
       

 12-07-2007
14.00
Six days and counting til inspection
       

 11-29-2007
9.00
Finishing canopy and fitting to fuselage
Details
       

 11-17-2007
6.00
Adding horizonal stabilizer to fueselage
       

 11-15-2007
1.50
Wiring the panel
       

 09-24-2007
0.50
Cowling Kit arrived
       

 09-16-2007
0.10
My New Hangar
       

 09-11-2007
6.00
Had to modify attachment points of stabilizer
Details
       

 08-16-2007
5.00
Added mods to cowling
       

 07-08-2007
3.00
Adding Components
       

 06-11-2007
0.10
MicroSwitch Casualty
       

 06-10-2007
2.50
Added fuel selector to center console
       

 05-25-2007
2.00
Added circuit breakers
       

 05-24-2007
12.00
Parking brake and lines filled with fluid
Details
       

 05-15-2007
0.25
Called Zenith for OK on Line Position
Details
     

 05-14-2007
1.50
Brake Pedals
Details
     

 05-11-2007
1.00
Testing rudder pedal location
Details
       

 05-11-2007
0.50
Tested location and effectiveness of Y stick
       

 03-23-2007
2.00
Creating a small circuit breaker panel
       

 03-19-2007
16.00
Fitting the brake lines.
       

 03-13-2007
10.00
Pick Up Engine and Run on Dyno at WW
Details
       

 03-13-2007
1.00
Getting ready to take the Corvair home
       

 03-11-2007
14.00
Torqueing the an bolts properly for gear
Details
       

 02-20-2007
4.00
Solder wires and mark them for trim
Details
       

 02-16-2007
14.00
Installing Canopy Hardware
       

 01-23-2007
1.00
Step Fairings installed
       

 01-19-2007
12.00
Elevator controls and step fairings
Details
       

 01-10-2007
6.00
Control Cables - Critical parts. Use Go, No Go Too
Details
       

 01-09-2007
4.00
Added horn and top bushing
     

 12-22-2006
2.50
Nosegear assembly
       

 12-22-2006
3.00
Installing Nose Gear Bungee
Details
       

 12-21-2006
3.00
Drill, tap threads for AN4 bolt into nose bearing
       

 12-20-2006
3.00
Added CHT and EGT to panel
       

 12-17-2006
4.00
Positioning the nose gear
       

 12-16-2006
1.00
Close up photos of the instruments
       

 12-15-2006
6.00
Steps
       

 12-15-2006
12.00
Adding the instruments
Details
       

 12-06-2006
16.00
Started cutouts on Instrument Panel
Details
       

 11-27-2006
5.00
Temporary seats made of Leather
Details
       

 11-24-2006
22.00
Add stringers to top skin. Add fairleads.
       

 11-22-2006
32.00
Middle skin and stringers, seatbelt connection
Details
       

 11-18-2006
8.00
Rebuilt KX-170B faceplate and knobs
Details
       

 11-11-2006
1.00
WW working on my engine at the college
       

 11-10-2006
48.00
Corvair College #10 (My Engine Being Built)
       

 11-09-2006
6.00
Looking over the handiwork with wings above
     

 10-30-2006
5.00
After spending about a month on vacation, got to w
Details
       

 09-30-2006
24.00
Add top skin to fuselage
Details
       

 09-23-2006
7.00
Gusset to hold flap motor
       

 09-16-2006
15.00
Installed seats and control cover
Details
       

 09-14-2006
8.00
Adding stick controls and leveling
       

 09-08-2006
13.00
checking angles
Details
       

 09-01-2006
36.00
Cockpit construction
Details
       

 08-22-2006
25.00
Fuselage sides, floor setup on sawhorses
Details
       

 08-19-2006
17.00
Setting Fuse on saw horses and alignment
Details
       

 08-12-2006
15.00
Wing Spar and Jig
Details
       

 08-09-2006
27.00
Cabin Floor and Rudder Controls
Details
       

 07-13-2006
8.00
Firewall
Details
       

 07-11-2006
4.00
Set flush rivets, cut Gear Channel, seat panel
Details
       

 07-11-2006
3.00
Cut Vertical Stiffeners, add Cable Outlet fairing
Details
       

 07-09-2006
7.00
Rear Panel and HT Attachment Brackets
Details
       

 07-08-2006
8.00
Add Fuselage Sides
Details
       

 07-07-2006
4.00
Add nutplates to, and position access cover
Details
       

 07-06-2006
1.00
Caleb at Zenith approved edge distance
Details

 07-05-2006
4.00
Rivet bottom skin and stiffeners. Cut Rudder Hinge
Details
       

 06-30-2006
18.00
Lower Skin, Longerons, Stiffeners and HT Frames
Details
       

 06-27-2006
3.00
Horizontal Tail, Fairleads
Details
       

 06-26-2006
4.00
Inventory & Horizontal Tail
Details
     

 06-19-2006
5.00
Loading at Factory
Details
       

 12-21-2005
6.00
Put in fuel gauges on center console
       

 07-22-2005
11.00
Final wiring of wing
       

 07-03-2005
7.00
Pitot riveted into position
       

 06-29-2005
12.00
Review of wing wiring
       

 05-30-2005
5.00
Drill holes for nav/strobe light. Install exterior
       

 05-07-2005
5.00
Wing Landing/Taxi Lights - Finish up
       

 05-04-2005
16.00
Wing Landing/Taxi Light
       

 05-03-2005
8.00
Wiring fuel tank second wing
       

 04-23-2005
17.00
Finish trim tab, add pitot
       

 02-24-2005
65.00
Showing both wings, building sender unit
       

 01-15-2005
17.00
Final touch up before raising to ceiling
       

 12-17-2004
45.00
Clean table, start second wing
       

 12-14-2004
12.00
Finish Locker, add aileron and flaps for position
       

 12-02-2004
4.00
String wire for lights
       

 11-25-2004
6.00
Build the actual locker cover
       

 11-22-2004
12.00
Baggage Locker
       

 10-02-2004
7.00
Fit tank and drain
       

 10-02-2004
2.00
Access cover for aileron bellcrank, overflow tube
       

 09-01-2004
12.00
Cleco top skin to ribs, prepare tank for install
       

 08-29-2004
15.00
Rivet bottom skin and roll nose skin into position
       

 08-26-2004
9.00
Inboard and outboard sides, bottom skin
       

 08-26-2004
12.00
add nose ribs and skin
       

 08-24-2004
7.00
Add top skin and fuel cutout
       

 08-22-2004
8.00
After assembly, remove them, check level and reass
       

 08-17-2004
12.00
Bellcrank and stiffeners
       

 08-15-2004
13.00
The ribs are adding up
       

 08-13-2004
7.00
Starting the Wing
       

 08-10-2004
6.00
Ailerons
       

 08-07-2004
16.00
Flaps
       

 08-04-2004
7.00
Layout flaps, install fairlead
       

 08-04-2004
4.00
Got the Wings!
Details
       

 05-24-2004
7.50
Cut out made for elevator trim, rudder fit and hor
       

 05-21-2004
15.00
Building the elevator
       

 05-15-2004
24.00
Started work on Elevator
Details
       

 05-11-2004
55.00
Stabilizer and Elevator
Details
       

 03-04-2004
21.20
The rudder kit
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.