KitLog pro

Powered By Kitlog Pro v2.0

Bob Leffler's RV-10
' style=
Date:  3-29-2011
Number of Hours:  2.00
Manual Reference:  47-6
Brief Description:  More Cowl work #3

47-6, Steps 11 & 12

Using the bottom cowl as a guide, mark the split line on the lop cowl. Remove the lop cowl and remove the material below the split line. Remove the 1/8" spacers from the front of the top cowl. Adjust the split line to obtain a .020 to .032 gap (approximately the width of a hacksaw blade) between the top and bottom cowls.

Brad assisted me this evening. We still have a couple issues with the cowl to resolve. The right front corner needs some additional material removed, as well as a couple spots along the side. There is also a spot of the front of the bottom cowl behind the spinner that needs about 1/16" removed.

The vertical stabilizer was re-installed this evening.
' style=

Front view of cowl

Front view of cowl

' style=

Left view of trimmed cowl

Left view of trimmed cowl

' style=

Vertical stabilizer re-installed

Vertical stabilizer re-installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.