KitLog pro

Powered By Kitlog Pro v2.0

Bob Leffler's RV-10
' style=
Date:  11-10-2008
Number of Hours:  0.75
Manual Reference:  18-5
Brief Description:  Left & right fuel tank attach bracket sub-assembly

18-5, Steps 1-5

Attach the shims to the tank attach bracket sub assembly along with the VA-146 bearing. I did this for both left and right tank attach brackets.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.