KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  8-17-2019
Number of Hours:  1.00
Manual Reference:  C75-LA-2
Brief Description:  Install MLG mount hardware

8 Bolts/nuts, one hour. These were a real bear to install since one wrench needed to be in the lower tunnel area and the other hand had to maneuver a combo wrench topside between seat supports and the tunnel.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.