Powered By Kitlog Pro v2.0
Cowboy's RV-10
RV-10
Aileron
Work Logs Found:
25
Category Work Time:
79 Hours
Date
Hours
Work Log Summary
Details
07-05-2012
1.80
Rivet R-Aileron TE; Install hardware
Details
07-04-2012
2.30
Rivet Left Aileron TE; Install Hardware
Details
07-01-2012
1.30
Right Aileron TE Proseal and Clamp
Details
06-30-2012
1.50
L Aileron Trailing Edge Proseal and Clamp
Details
06-26-2012
1.50
Rivet R Aileron Nose and Main Ribs; Pop rivet C-we
Details
06-24-2012
5.00
Rivet Bottom Aileron Skins, end Ribs, and C-Balanc
Details
06-21-2012
1.00
Rivet Right Aileron Top Skin
Details
06-20-2012
1.00
Rivet L Top Aileron Skin
Details
06-18-2012
2.60
Assemble Left and Right Aileron LE
Details
06-17-2012
4.30
Prime L & R Aileron Parts and Begin L Assy.
Details
06-16-2012
2.00
Prime L and R Aileron Parts
Details
06-10-2012
7.00
Scotchbrite and Dimple L and R Ailerons
Details
06-09-2012
2.50
L and R Aileron TE Countersink
Details
06-03-2012
3.00
Final Drill Right Aileron
Details
06-02-2012
5.00
Final Drill Left Aileron
Details
05-28-2012
2.70
Final Drill and Temp Assemble Bottom Skins
Details
05-27-2012
5.70
Prime Skins and Stiffeners; Back-rivet same
Details
05-26-2012
5.00
Final Drill, Debur, Dimple Aileron Skin and Stiffe
Details
05-25-2012
6.70
Aileron Bracket Fitting and Skin Stiffener Constr
Details
05-10-2012
1.00
Final-Drill Outboard Right Aileron Hinge Bracket
Details
04-17-2012
2.00
Drill Right Aileron Counterbalance
Details
04-16-2012
1.50
Drill Right Aileron Nose Ribs to Spar
Details
01-08-2012
3.50
Assemble and Drill L-aileron Nose Structure.
Details
12-29-2011
5.00
Torsion Box Assembly Table (continued)
Details
12-28-2011
4.00
Begin Torsion Box Assembly Table
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
247
770
Aileron
25
79
Elevators
6
24
Empennage
3
2
Empennage Attach
11
38
Flap
22
82
Horizonal Stab
8
38
Rudder
3
11
Tail Cone
41
125
Vertical Stab
10
14
Wings
118
357
Copyright © 2001-2024 Matronics. All Rights Reserved.