KitLog pro

Powered By Kitlog Pro v2.0

Cowboy's RV-10
' style=
Date:  4-16-2012
Number of Hours:  1.50
Manual Reference:  21-2
Brief Description:  Drill Right Aileron Nose Ribs to Spar

21-2: Prior to start, inspected Left Aileron Nose parts for step conpleteness and deburring. Ran EZ Burr 1/8 inch tool through the A-1009 Counterweight Nose Skin holes to debur the inner holes after drilling. What a great tool.
Step 1: Reviewed all the parts and alignment for the Right Aileron since it's been over three months since doing work on the Left Aileron.
Step 2: Clecoed Nose Ribs, spacer, doublers, and Spar of Right Aileron. Final-Drilled #30 holes as indicated using reamer.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.