KitLog pro

Powered By Kitlog Pro v2.0

Ron Lendon's Aircraft Mfg.
Work Logs Found: 533
Category Work Time: 1100 Hours
 Date
Hours
Work Log Summary

Details

 10-08-2012
1.00
Airflow through Cowl
Details

 05-28-2012
2.50
Gascolator heatshield and cowling attach
Details
       

 05-28-2012
4.00
Aileron trim and gascolator heat sheid
Details
       

 05-27-2012
2.50
Routing wires for aileron trim tab
Details
       

 05-27-2012
4.50
Made up sholder harness attach points
Details
       

 05-26-2012
5.00
Documents holder, pitot plumbing
Details
       

 05-25-2012
0.75
Safety wired all control cables 2 of 2
       

 05-25-2012
0.75
Safety wired all control cables 1 of 2
Details
       

 05-25-2012
1.00
Rudder adjust travel, and tow bar
Details
       

 05-24-2012
1.50
Rivet fairleads for ailerons
Details
       

 05-23-2012
2.70
Aileron fairleads and horizontal stabilizer tips
Details
       

 05-22-2012
6.00
Make cables for ailerons
Details
       

 05-21-2012
5.00
Remade the upper elevator cable
Details
       

 05-20-2012
7.00
TheTail is cabled
Details
       

 05-19-2012
5.00
Beging making cables for the controls
Details
       

 05-18-2012
1.50
Saftey wired all control cables 1 of 2
Details
       

 05-14-2012
3.00
Attach right wing
Details
       

 05-13-2012
8.00
Left wing is attached, right wing is next
Details
       

 05-11-2012
3.00
Hang rudder, canopy seal, wing root trim
Details
       

 05-06-2012
2.50
Seal canopy flashing with sikaflex gray
Details
       

 05-03-2012
1.00
Putzing before theEAA meeting
Details
       

 05-02-2012
5.00
Rudder and right wing close to done
Details
       

 04-29-2012
2.16
Set Horizontal Stabilizer
Details
       

 04-29-2012
2.16
Move rear spar attach plate, wing wiring
Details
       

 04-29-2012
2.16
Hung tail feathers
Details
       

 04-28-2012
3.00
Set horizontal stabilizer, test run engine
Details
       

 04-27-2012
4.00
Tram wing tips and set horizontal stabilizer
Details
       

 04-20-2012
3.00
Rivet canopy flashing, grind welds on cowl
Details
       

 04-19-2012
1.20
Fitting Canopy Flashing 5 of 5
Details
       

 04-19-2012
1.20
Fitting Canopy Flashing 4 of 5
Details
       

 04-19-2012
1.20
Fitting Canopy Flashing 3 of 5
Details
       

 04-19-2012
1.20
Fitting Canopy Flashing 2 of 5
Details
       

 04-19-2012
1.20
Fitting Canopy Flashing 1 of 5
Details
       

 04-18-2012
2.00
Fit and cleco inner flashing for the canopy
Details
       

 04-16-2012
1.50
Pilot drill L-Angles for canopy sides
Details
     

 04-16-2012
1.50
Creating the side attachments for the canopy
Details
       

 04-15-2012
0.50
Unload canopy and cover it
Details
       

 04-15-2012
2.00
Marked and trimmed sides of canopy
Details
       

 04-15-2012
2.50
Canopy latch mechanicals'
Details
       

 04-15-2012
0.50
Cable routing for canopy latch
       

 04-14-2012
2.00
Prep canopy latch cable through front hoop
Details
     

 04-14-2012
2.00
Fresh air ducts
       

 04-13-2012
2.00
Fresh air ducts
Details
       

 04-12-2012
3.00
Canopy Flashing
Details
       

 04-11-2012
2.50
Canopy frame flashing
Details
       

 04-10-2012
2.00
Canopy frame work
Details
       

 04-09-2012
3.00
Canopy Flashing
Details
       

 04-06-2012
4.00
Odds and ends
Details
     

 04-02-2012
1.50
Pilot drilling canopy
Details
       

 04-02-2012
0.50
Open holes to 5/16" in canopy
Details
       

 04-02-2012
1.00
Fastening canopy to the hoops
Details
       

 04-01-2012
4.00
Fit and glue the front and rear seals
Details
       

 03-31-2012
5.00
Making rear hoop template
Details
       

 03-31-2012
2.00
Fitting rear tube to the template
Details
       

 03-31-2012
1.00
Fitting front hoop length for the canopy
Details
       

 03-30-2012
3.00
Canopy fitting phase 2, 2 of 2
Details
       

 03-30-2012
3.00
Canopy fitting phase 2, 1 of 2
Details
       

 03-29-2012
2.00
Canopy fitting phase 1
Details
       

 03-29-2012
2.00
Canopy fitting phase 1
Details
       

 03-27-2012
1.00
Trial fit canopy
Details
       

 03-27-2012
2.00
Canopy frame
Details
       

 03-26-2012
2.50
Canopy frame
Details
       

 03-25-2012
2.00
Fit canopy rails
Details
       

 03-25-2012
2.00
First canopy fiting
Details
       

 03-13-2012
3.00
Remake right front baffle
Details
       

 03-06-2012
2.00
Fitting & Wiring Flap Motor
Details
       

 02-16-2012
1.00
Bleed brakes
Details

 02-06-2012
2.00
Measure coax and wire flap motor switches
Details
       

 01-26-2012
2.00
Planning location for Remote Compass
Details
       

 01-24-2012
4.00
Mount ELT and rear spinner bulkhead
Details
       

 01-18-2012
8.00
Front Right Baffle
Details
       

 01-17-2012
8.00
Front Right Baffle
Details
       

 01-12-2012
1.50
Parking brake handle
Details
     

 01-11-2012
1.50
Bleed Brakes
Details

 11-30-2011
1.50
Protect wires and cabin heat air deflector
Details
       

 11-25-2011
2.00
Reset main gear
Details
       

 11-25-2011
1.50
Brake line routing
Details
       

 11-24-2011
2.00
Hide the brake line 3 of 3
Details
       

 11-23-2011
0.75
Hide the brake line 2 of 3
Details
       

 11-23-2011
0.75
Hide the brake line 1 of 3
Details
       

 11-16-2011
2.00
Route ignition and temp probe wires through FW
Details
       

 11-15-2011
2.00
Route oil pressure and temp lines through firewall
       

 11-14-2011
2.00
Safety wired the cables
       

 11-13-2011
2.00
Putzing
Details
       

 11-13-2011
1.50
Cabin heat cable
Details
       

 11-12-2011
2.50
Carb heat cable placement
Details
       

 11-11-2011
2.50
Mixture and Carb heat cables
Details
       

 11-09-2011
3.00
Route brake lines from parking brake to caliper
Details
       

 11-08-2011
2.00
Mount parking brake, route lines
Details
       

 11-07-2011
3.00
Parking brake mechanicals
Details
       

 11-06-2011
1.00
Steering rod boots
Details
       

 11-06-2011
2.00
Making things airworthy
Details
       

 11-06-2011
3.00
Brake cylinders
Details
       

 11-05-2011
1.50
Plates for the steering rod boots
Details
       

 10-31-2011
2.00
Remove test shroud and start front baffel
Details
       

 10-17-2011
3.00
ReDo Parking Brake
Details
       

 10-16-2011
3.00
Mounted parking brake valves
Details
       

 09-10-2011
1.00
Trim leading edge of the air scoop
       

 09-09-2011
0.50
Inside heat muff 4 of 4
Details
       

 09-09-2011
0.50
Inside heat muff 3 of 4
Details
       

 09-09-2011
0.50
Inside heat muff 2 of 4
Details
       

 09-09-2011
0.50
Inside heat muff 1 of 4
Details
       

 09-07-2011
2.00
Make heat muff from galvanized steel
Details
       

 09-06-2011
2.50
Heat muff mock up
Details
       

 09-03-2011
6.00
Air Scoop
Details
       

 09-02-2011
3.00
Air Scoop
Details
       

 09-01-2011
2.00
Air scoop work
Details
       

 08-31-2011
4.00
Carb heat valve for the air scoop
Details
       

 08-30-2011
2.00
Air Scoop for Carb
Details
       

 08-27-2011
1.50
Tune up line on cowl top skins
Details
       

 08-26-2011
2.00
Nose bowl is held by the cowl panels now
Details
     

 08-25-2011
1.50
Lower Side Cowl Panels
Details
       

 08-25-2011
2.50
Lower Cowl Panels
Details
       

 08-24-2011
2.50
Layout and trim rear lower cowl panels
Details
       

 08-24-2011
1.50
Layout and trim front lower cowl panels
Details
       

 08-23-2011
2.50
Make lower cowl panels
Details
       

 08-22-2011
3.00
Tuning up the cowl transistions
Details
       

 08-21-2011
5.00
Added nut plates for the top side cowl skins
Details
       

 08-20-2011
5.00
Side work fueslage and cowl
Details
       

 08-19-2011
2.50
Side upper panels cowl
Details
       

 08-18-2011
1.50
Bubble up Nose Bowl to clear starter
Details
       

 08-18-2011
3.00
Attach hinges to top and bottom cowl panels
       

 08-17-2011
2.00
Parts and cowl hinge work
Details
       

 08-16-2011
1.00
Trim fuselage sides by firewall
       

 08-15-2011
2.00
Trim and fit upper door templates
Details
       

 08-14-2011
4.00
Bracket fab and skin (door) templates
Details
       

 08-13-2011
4.00
Nut plates and dimples for Cowl top and bottom
Details
       

 08-12-2011
3.00
Joggle nose bowl and tune up and structure cowl
Details
       

 08-10-2011
3.00
Prep for putting joggle in the nose bowl
Details
       

 08-09-2011
3.00
Upper center cowl
Details
       

 08-09-2011
3.00
Lower cowl / air intake
Details
       

 08-08-2011
1.00
Align Nose Bowl with Fuselage
Details
       

 08-07-2011
2.00
Trim rear edge of Nose Bowl & make Alt Brkt
Details
       

 08-06-2011
4.00
Cowl and Nose Bowl
Details
       

 08-05-2011
2.00
Finish welding nose bowl
Details
       

 07-14-2011
2.00
Patching and welding nose bowl
Details
       

 07-10-2011
3.50
Tune up front face of lower nose bowl
Details
       

 07-10-2011
1.50
Tack welding and cutting center hole in Nose Bowl
       

 07-08-2011
3.00
Fitting lower nose bowl
Details
       

 07-08-2011
2.00
Fitting lower nose bowl
Details
       

 07-07-2011
5.00
Tack Welding Upper Nose Bowl
Details
       

 07-06-2011
7.00
Upper Nose Bowl
Details
       

 07-05-2011
3.00
Upper Nose Bowl
Details
       

 07-05-2011
2.00
Lower Nose Bowl
Details
       

 07-04-2011
4.00
Lower Nose Bowl
Details
       

 07-02-2011
3.00
Lower Nose Bowl
Details
       

 07-01-2011
3.00
Finished the Battery Box
Details
       

 06-24-2011
1.00
Nosebowl Lower Panel restart
Details
       

 06-24-2011
4.00
Battery box
Details
       

 06-20-2011
0.60
Template lower nosebowl 4 of 4
Details
       

 06-20-2011
0.60
Template lower nosebowl 3 of 4
Details
       

 06-20-2011
0.60
Template lower nosebowl 2 of 4
Details
       

 06-20-2011
0.60
Template lower nosebowl 1 of 4
Details
       

 06-18-2011
1.00
Lower nosebowl templates
Details
       

 06-17-2011
2.00
Templates for the top side of the nosebowl
Details
       

 06-16-2011
2.00
Nosebowl template and fuel line
Details
       

 06-13-2011
2.00
Make a template of nosebowl
Details
       

 06-09-2011
1.00
Destroyed the material by over working it
Details
       

 06-07-2011
1.00
Soften bends in lower nosebowl
Details
       

 06-01-2011
2.00
Focused metal movement to tighten it up to form
Details
       

 05-31-2011
2.00
Little tune up and lots of rest today
Details
       

 05-30-2011
3.50
Almost destroyed the bottom nose bowl
Details
       

 05-29-2011
3.50
Shaping the air inlets
Details
       

 05-28-2011
4.00
Shaping the air inlets
Details
       

 05-21-2011
0.50
Smooth out main center shape and tuck in one side
Details
       

 05-20-2011
0.63
Nosebowl Shot Bag 4 of 4
Details
       

 05-20-2011
0.63
Nosebowl Shot Bag 3 of 4
Details
       

 05-20-2011
0.63
Nosebowl Shot Bag 2 of 4
Details
       

 05-20-2011
0.63
Nosebowl Shot Bag 1 of 4
Details
       

 05-19-2011
1.50
Afternoon nose bowl work
Details
       

 05-19-2011
2.00
4am morning, can't sleep, so get to work...
Details
       

 05-17-2011
0.63
Nose bowl bottom skin 4 of 4
Details
       

 05-17-2011
0.63
Nose bowl bottom skin 3 of 4
Details
       

 05-17-2011
0.63
Nose bowl bottom skin 2 of 4
Details
       

 05-17-2011
0.63
Nose bowl bottom skin 1 of 4
Details
       

 05-15-2011
0.30
Nosebowl Air inlet remake 7 of 7
Details
       

 05-15-2011
1.40
Nosebowl Air inlet remake 6 of 7
Details
       

 05-15-2011
0.30
Nosebowl Air inlet remake 5 of 7
Details
       

 05-15-2011
0.50
Nosebowl Air inlet remake 4 of 7
Details
       

 05-15-2011
0.10
Nosebowl Air inlet remake 3 of 7
Details
       

 05-15-2011
0.10
Nosebowl Air inlet remake 2 of 7
Details
       

 05-15-2011
0.30
Nosebowl Air inlet remake 1 of 7
Details
       

 05-14-2011
0.80
Nosebowl 5 of 5
Details
       

 05-14-2011
0.80
Nosebowl 4 of 5
Details
       

 05-14-2011
0.80
Nosebowl 3 of 5
Details
       

 05-14-2011
0.80
Nosebowl 2 of 5
Details
       

 05-14-2011
0.80
Nosebowl 1 of 5
Details
       

 05-14-2011
1.00
Begin nose bowl fabrication
Details
       

 05-03-2011
2.50
Re-riveted nut plates, Fuel system pressure test
Details
       

 05-02-2011
1.00
Fuel system plumbing 2 of 2
Details
     

 05-02-2011
2.00
Fuel system plumbing 1 of 2
Details
       

 05-01-2011
3.00
Top Skin Fitting
Details
       

 04-30-2011
3.50
Nut plates for removable top skin
Details
       

 04-28-2011
1.00
Drilling holes for nut plate rivets
Details
     

 04-26-2011
2.00
Inventory, tool making, dimpling
Details
       

 04-25-2011
3.00
Fuel system and IP brace
Details
       

 04-22-2011
2.00
Rivet step farings
       

 04-22-2011
3.00
Fitting the side panels behind canopy hinge
Details
       

 04-21-2011
1.00
Test fit top skin
Details
       

 04-20-2011
2.00
Structure planning
Details
       

 04-11-2011
2.00
Step farings (verticle)
Details
       

 04-09-2011
2.00
Step faring bottom
Details
       

 04-08-2011
4.00
Test fit IP with all the stuff in it
Details
       

 04-03-2011
2.00
Step faring
Details
       

 04-03-2011
2.00
Make step tube pilot to connect the step
Details
       

 04-02-2011
2.00
Flap controls
Details
       

 04-01-2011
1.50
Brake pedal riviting and pedal placement
Details
       

 03-31-2011
8.00
Fuel delivery system
Details
       

 03-29-2011
3.50
Brakes and steering link windows
Details
       

 03-28-2011
2.00
Triming seat foam and sending it out for upolstery
Details
       

 03-27-2011
3.00
Seat foam gluing
Details
       

 03-27-2011
3.50
Brake pedals
Details
       

 03-26-2011
3.00
Gluing the seat foam
Details
       

 03-26-2011
3.00
Engine mount, brake pedal hinges
Details
       

 03-24-2011
2.00
Brake pedals, steering rods, & seat cushions
Details
       

 03-23-2011
2.00
Test fit rudder pedals and make two brake pedals
Details
       

 03-22-2011
1.50
Reset main gear with 3/16" red neoprene
Details
       

 03-19-2011
7.00
On its gear finally
Details
       

 03-17-2011
2.00
Landing gear
Details
       

 03-16-2011
3.50
Attaching the steel parts.
Details
       

 03-12-2011
1.50
IP Reinforcement angles
Details
       

 03-11-2011
1.50
IP Cutouts for trim controls
       

 03-09-2011
2.50
More IP work
Details
       

 03-07-2011
2.00
Custom fitting guages
Details
       

 03-06-2011
7.00
Poking Large holes in the IP
Details
       

 03-05-2011
2.00
Top skin firewall to IP
Details
       

 03-05-2011
2.00
remake the Panel Side Angles
Details
       

 03-05-2011
1.00
Paste print to IP
Details
       

 03-05-2011
1.00
Center punch and pilot drill IP face
Details
       

 03-03-2011
1.00
Cut paper IP layout and Top skin
Details
       

 03-01-2011
1.30
Cutting seat foam
Details
       

 02-28-2011
1.00
Cutting seat foam
Details
       

 02-26-2011
2.00
Drill holes in the fork and doubler
Details
       

 02-25-2011
3.00
Nose wheel fork and mount 3 tires
Details
       

 02-24-2011
1.50
Nose wheel fork
Details
       

 02-21-2011
2.00
Forward center console verticle panels
Details
       

 02-20-2011
3.00
Center console screw mounting
Details
       

 02-19-2011
4.00
Reverse some rivets and test bend nose gear
Details
       

 02-19-2011
3.00
Nose gear lower bearing
Details
       

 02-18-2011
4.50
Little bit of fab and a lot of welding
Details
       

 02-17-2011
2.20
Cross drilling Nose Gear down tube
Details
       

 02-16-2011
1.50
Nose gear Bottom plate
Details
       

 02-15-2011
1.00
Nose gear, cut and fit pipe
Details
       

 02-10-2011
4.00
Collect steel parts for media blast and paint
Details
       

 02-09-2011
7.00
Center console
Details
       

 02-08-2011
2.00
Cut and bend 6-K-2 parts for the Center Console
       

 02-07-2011
4.00
IP and firewall fuel pass through fabrication
Details
       

 02-06-2011
2.00
Add a few rivets and plan instrument panel
Details
       

 02-05-2011
3.50
Riviting top skins and seat
       

 02-05-2011
3.00
Longeron Doubler
Details
       

 02-04-2011
1.50
Shaping metal around front hoop
Details
       

 02-03-2011
3.00
Rear forward top skin
Details
       

 02-02-2011
5.00
Forward rear skin
Details
       

 02-01-2011
8.00
Layout and drill upper rear forward skin
Details
       

 01-31-2011
3.00
Positioned forward rear skin
Details
       

 01-30-2011
3.00
Trim and fit fuselage hoops
       

 01-29-2011
3.00
Canopy hoops
Details
       

 01-28-2011
2.00
Bending tube
Details
       

 01-28-2011
2.00
Bending tube
Details
       

 01-27-2011
2.50
Bend tube for fuselage
Details
       

 01-26-2011
2.00
Flap torque arm install 3 of 3
Details
       

 01-26-2011
2.00
Flap torque arm install 2 of
Details
       

 01-26-2011
1.00
Flap torque arm install 1 of
Details
       

 01-25-2011
2.00
Seats and arm rest
Details
       

 01-25-2011
1.50
Cutting holes
       

 01-25-2011
1.40
Arm rest & Flap Torque Tube
Details
       

 01-24-2011
2.75
Center console / arm rest
Details
       

 01-22-2011
1.00
Position front control stick bearing
Details
       

 01-21-2011
2.00
Seat back Chanel & forward torque tube bearing
Details
       

 01-19-2011
3.50
Seat back, center support & doubler
Details
       

 01-19-2011
2.00
Seat back riveted in place
Details
       

 01-19-2011
3.00
Flanging hole back into shape
Details
       

 01-18-2011
4.00
Seat back support and flap motor mount
Details
       

 01-18-2011
3.00
Finish left front seat panel, start seat back supp
Details
       

 01-17-2011
1.75
Right front seat panel rivetd in place
Details
       

 01-13-2011
1.50
Front seat panel / angles
Details
       

 01-12-2011
1.50
Front Seat Panel
Details
       

 01-11-2011
2.00
Clean up and rivet bottom of fuselage
Details
       

 01-10-2011
1.50
Layout trim and rivet last section of side skin
       

 01-09-2011
1.00
Rivet gussets right side start seats
Details
       

 01-08-2011
1.00
Caulk, rivet front side skins and firewall 3 of 3
       

 01-08-2011
2.00
Caulk, rivet front side skins and firewall 2 of 3
Details
       

 01-08-2011
2.00
Caulk, rivet front side skins and firewall 1 of 3
Details
       

 01-07-2011
1.50
Fresh air vents
Details
       

 01-04-2011
2.00
Fresh air vents
Details
       

 01-03-2011
0.50
Finish up forward side skin rivet lines 3 of 3
Details
       

 01-03-2011
1.00
Finish up forward side skin rivet lines 2 of 3
Details
       

 01-03-2011
1.00
Finish up forward side skin rivet lines 1 of 3
Details
       

 01-01-2011
1.00
L-Angles front side skins 2 of 2
Details
       

 01-01-2011
1.00
L-Angles front side skins 1 of 2
Details
       

 12-31-2010
4.00
Fitting forward side skins
Details
       

 12-30-2010
2.00
Begin joining front floor and side skins
Details
       

 12-26-2010
5.00
Set center spar rear wing attachment uprights
Details
       

 12-25-2010
2.00
Reset wing jigs and mark for transfer punch
Details
       

 12-25-2010
1.00
Front outer Seat Belt Attach points
     

 12-24-2010
3.00
Rivet baggage floor in place
Details
       

 12-23-2010
2.00
Rivet parts together
Details
       

 12-23-2010
2.00
Establish rivetline on outer skins
Details
       

 12-23-2010
3.00
Baggage floor
Details
       

 12-22-2010
2.00
Rivet splice upper rear longerons
Details
       

 12-20-2010
2.00
Main cabin floor and baggage floor
Details
       

 12-20-2010
2.00
Baggage floor
Details
       

 12-19-2010
3.00
Main cabin floor
Details
       

 12-11-2010
5.00
Fuselage Center Spar and Baggage Floor
Details
       

 12-10-2010
1.00
Rear baggage floor
Details
       

 12-07-2010
1.00
Enlarge pilot holes to 5/32 and 1/8 side skins
       

 12-05-2010
3.00
Main gear upright supports
Details
       

 12-04-2010
2.50
Main Landing Gear Attachment
Details
       

 12-04-2010
2.50
Main Landing Gear Attachment
Details
       

 12-01-2010
1.00
Main Landing gear
Details
       

 11-30-2010
2.00
Main Landing Gear Attachment
Details
       

 11-29-2010
2.00
Main Landing Gear Attachment
Details
       

 11-27-2010
1.00
Making the rear baggage floor
Details
       

 11-27-2010
4.00
Baggage tray
Details
       

 11-26-2010
2.00
Main gear attachment stud tool
Details
     

 11-25-2010
2.00
Adjust side skins and deburr some update parts

 11-23-2010
3.00
Cut holes in side skins
Details
       

 11-22-2010
1.00
Adjust bend near center spar on floor
Details
       

 11-21-2010
2.00
Trimmed and hung side skins
Details
       

 11-20-2010
2.50
Upper Seat & Baggage Floor Support
Details
       

 11-20-2010
1.50
Set instrument panel and hang side skins
Details
       

 11-19-2010
3.00
More fuselage work
Details
       

 11-19-2010
2.50
Fuselage work
Details
       

 11-17-2010
2.00
Setting rear wing attach points
Details
       

 11-15-2010
6.50
Recheck and reset everything
Details
       

 11-13-2010
2.50
Remove rear frame assembly to relocate it
Details
       

 11-04-2010
3.50
Wing Jigs
Details
       

 11-03-2010
3.50
Move rear fuselage back and start front build up
Details
       

 11-02-2010
4.00
Setting up for fuselage marriage
Details
       

 11-02-2010
1.00
Set rear fuselage
Details
       

 11-02-2010
1.00
Rear fuslage prep work
Details
       

 11-02-2010
1.00
Rear fuselage prep work
Details
       

 11-01-2010
1.00
Putzing around
Details

 10-30-2010
1.10
Rough trim rear top skin
Details
       

 10-29-2010
0.50
Drill and cleco rear top skin 3 of 3
Details
       

 10-29-2010
0.50
Drill and cleco rear top skin 2 of 3
Details
       

 10-29-2010
1.00
Drill and cleco rear top skin 1 of 3
Details
       

 10-28-2010
1.20
Setting top rear skin on fuselage
Details
       

 10-28-2010
1.80
Rear top fuselage skin
Details
       

 10-28-2010
0.50
Clamping rear top skin in place
Details
       

 10-26-2010
2.00
Setup bulkheads on rear fuselage
Details
       

 10-25-2010
3.00
Prepping rear fuselage for assembly
Details
       

 10-24-2010
4.00
Prime mating surfaces on rear fuselage
Details
       

 10-07-2010
2.00
Cutout rear spar clearance in rear side skin
Details
       

 10-06-2010
2.00
Assembled rear sides of fuselage
Details
       

 08-28-2010
3.00
Riveting firewall
Details
       

 08-27-2010
2.00
Firewall riveting
Details
       

 08-27-2010
2.00
Firewall Riveting
Details
       

 04-23-2010
1.50
Finished welding motor mount
Details
     

 10-24-2009
1.50
Cutting sheets for rear top fuselage
Details
       

 10-24-2009
2.50
Canopy parts
Details

 10-15-2009
1.00
Made front Axle Spacers

 09-26-2009
1.00
Make clearance for calipers on the main gear
Details
       

 09-25-2009
0.50
Bolt holes for axel 3 of 3
Details
       

 09-25-2009
2.00
Bolt holes for axel 2 of 3
Details
       

 09-25-2009
2.00
Bolt holes for axel 1 of 3
Details
       

 09-22-2009
2.50
Main Gear
Details
       

 09-19-2009
2.50
Main Gear
Details
       

 09-06-2009
2.50
Grind forms to line and smooth shape
Details
       

 09-04-2009
2.25
Layout and trim forms for canopy tubes
Details
       

 09-02-2009
1.00
Weld canopy hinge / engine mounts
Details
       

 09-01-2009
1.00
Clean up and make lists of needed material
Details
       

 08-28-2009
1.00
Layout, cut, and bend air vents 5 of 5
Details
       

 08-28-2009
1.00
Layout, cut, and bend air vents 4 of 5
Details
       

 08-28-2009
0.10
Layout, cut, and bend air vents 3 of 5
Details
       

 08-27-2009
1.75
Layout, cut, and bend air vents 2 of 5
Details
       

 08-27-2009
1.75
Layout, cut, and bend air vents 1 of 5
Details
       

 08-26-2009
2.00
Gusset and Fairleads
Details
       

 08-25-2009
2.00
Flap motor & fairleads
Details
       

 08-24-2009
1.50
Small B Details
Details
       

 08-23-2009
2.00
Small B details
Details
       

 08-23-2009
1.50
Making small B details, sheet 18
Details
       

 08-22-2009
1.00
Layout, cut, drill, deburr
       

 08-21-2009
2.00
Making more B details
Details
       

 08-20-2009
2.00
Cleaned up bench and made some parts
Details
       

 08-17-2009
2.00
Discovered I didn't have long enough .040 left
Details
       

 08-16-2009
2.00
Started on 6b16 details
Details
       

 08-16-2009
1.80
Make tool for setting rivets
Details
       

 08-13-2009
1.50
Prep corners for NutPlates MS21075L3
Details
       

 08-11-2009
0.70
Dimple and rivet frame around access hole
       

 08-08-2009
1.00
Trim and bend 6b-15-2
Details
       

 08-08-2009
3.00
Made left and right parts of 6B15-4
Details
       

 08-08-2009
2.00
Getting all the 6B15 details made
Details
       

 08-06-2009
1.00
Small parts fabrication 6b-12,14,& 15
Details
       

 08-05-2009
1.50
Scrap built layout
Details
       

 08-05-2009
1.00
Bend the other two parts
       

 08-04-2009
2.00
Modify form 10 degrees, bend 85 part 3
Details
       

 07-08-2009
0.16
bending flange on hardwood 6 of 6
Details
       

 07-08-2009
0.16
bending flange on hardwood 5 of 6
Details
       

 07-08-2009
0.16
bending flange on hardwood 4 of 6
Details
       

 07-08-2009
0.16
bending flange on hardwood 3 of 6
Details
       

 07-08-2009
0.16
bending flange on hardwood 2 of 6
Details
       

 07-08-2009
0.16
bending flange on hardwood 1 of 6
Details
       

 06-25-2009
2.50
Fitting rudder bearing and spar jig
Details
       

 06-21-2009
2.50
Landing Gear and extra parts
Details
       

 06-21-2009
1.00
Disassemble canopy frame, test fit rudder pedals
Details
       

 06-20-2009
2.00
Made shutter slides for steering rods
Details
       

 06-20-2009
1.40
Drilled center spar rivet line to size
       

 06-19-2009
3.50
Deburred side skins, mounted center spar
Details
       

 06-18-2009
1.00
Cut side skins for cabin
Details

 06-17-2009
3.50
Bend other upper longeron
Details
       

 06-14-2009
2.00
Start 6B11-1 template
Details
       

 06-14-2009
1.50
Bend upper forward longerons
Details
       

 06-13-2009
2.00
Weld and finish lower engine mount bracket
Details
       

 06-13-2009
2.00
Fit lower engine mount and drill holes
Details
       

 06-11-2009
1.20
Cabin Floor 3 of 3
Details
       

 06-11-2009
1.20
Cabin Floor 2 of 3
Details
       

 06-11-2009
1.20
Cabin Floor 1 of 3
Details
       

 06-10-2009
1.00
Drill cabin floor to rivet size
       

 06-09-2009
4.50
Layout and pilot drill Cabin Floor
Details
       

 06-08-2009
4.00
Layout rivet holes on Cabin Floor
Details
       

 06-07-2009
3.00
Layout cabin floor
Details
       

 06-05-2009
1.00
Front Floor Skin
Details

 05-26-2009
2.00
Brake Cylinder Supports
Details

 05-23-2009
1.00
Cut 3/4 x 3/4 x 1/8 angle
Details
       

 05-21-2009
2.50
Brake Cylinder Supports
Details
       

 05-19-2009
2.00
Toe Brake Pedal and Lateral Pedal Bearing
Details
       

 05-18-2009
1.00
Cut and fabricate Heel Support
Details
       

 05-11-2009
2.00
Central Pedal Bearing mfg
Details
       

 05-01-2009
1.50
Lower LG Bearing
Details
       

 05-01-2009
0.70
Lower LG Bearing
Details
       

 04-30-2009
1.00
Lower LG Bearing
Details
       

 04-30-2009
1.00
Lower LG Bearing
Details
       

 04-14-2009
2.00
Finish Upper Gear Bearing & Start Lower
Details
       

 04-13-2009
2.50
Fabricate Upper Bearing for Nose Gear
Details
       

 02-08-2009
0.50
Disassemble firewall for storage
Details
     

 02-07-2009
2.00
Layout and cut Lower Engine Mount Fitting
Details
       

 02-07-2009
1.00
Holes and bend Lower Engine Mount Fitting
Details
       

 02-07-2009
0.50
Bend Upper Engine Mount & Canopy Hinge 3 of 3
Details
       

 02-07-2009
0.50
Bend Upper Engine Mount & Canopy Hinge 2 of 3
Details
       

 02-07-2009
0.50
Bend Upper Engine Mount & Canopy Hinge 1 of 3
Details
       

 02-05-2009
1.00
Trim brackets
Details
       

 02-04-2009
1.50
Upper Engine Mount & Canopy Hinge
Details
       

 02-02-2009
1.00
Upper Engine Mount & Canopy Hinge
Details
       

 02-01-2009
2.00
Layout and locate 6b8-11 & 6b8-10
Details
       

 01-31-2009
8.00
Center Firewall Stiffener and Gear Gusset
Details
       

 01-30-2009
1.00
Remade 6b8-7 for better fit
Details
       

 01-28-2009
3.00
Layout and cut 6b8-3, 1, & 7. Bent 1 & 7
Details
       

 01-27-2009
2.00
Cut material for 6b13-1
Details
     

 01-26-2009
2.00
Layout and make 6b8-2
Details
       

 01-25-2009
2.00
Cut two strips of .062 for 6b8-10 & 11
Details
       

 01-25-2009
2.00
Cut and made 6b8-9
Details
       

 01-24-2009
1.00
Attached 6b7-3's to 6b7-1
Details
     

 01-22-2009
4.00
Trimmed ends of 6b6-3,6b7-1 & 2, and L-angles.
Details
       

 01-22-2009
2.00
Layout and drill all rivets holes in main firewal
Details
       

 01-21-2009
2.20
Layout and silver cleco firewall, 6b7-1 and 6b6-1
Details
       

 01-20-2009
2.50
Cut and made 6b6-1, 6b6-3, 6b7-2, and 6b7-3
Details
       

 01-20-2009
2.50
Cleaned up table and worked 6b7-1
Details
       

 01-19-2009
1.00
Straightened flange on 6B7-1
Details
       

 01-16-2009
1.20
Qualify flange of Firewall
Details
       

 01-16-2009
3.00
Firewall Top Stiffener (front)
Details
       

 01-15-2009
0.60
Trim Firewall 6b6-2
Details
       

 01-15-2009
0.20
Ready firewall form for hammering
Details
       

 01-15-2009
1.10
Form firewall
Details
       

 01-14-2009
3.00
Making more bulkheads
Details
       

 01-14-2009
2.50
Making 6b12-2 Baggage Back Bulkhead
Details
       

 01-13-2009
0.30
Tune up part to specs 6b12-3
Details
       

 01-13-2009
0.50
Test forms, make 6b12-3 from scrap piece 3 of 3
Details
       

 01-13-2009
1.00
Test forms, make 6b12-3 from scrap piece 2 of 3
Details
       

 01-13-2009
1.00
Test forms, make 6b12-3 from scrap piece 1 of 3
Details
       

 01-13-2009
0.90
Form Middle Bulkhead
Details
       

 01-12-2009
1.00
Rear Frame Assembly Storage
Details
       

 01-12-2009
1.50
Mark crimp locations in all bulkhead forms 2 of 2
Details
       

 01-12-2009
1.50
Mark crimp locations in all bulkhead forms 1 of 2
Details
       

 01-10-2009
4.00
Rear Frame Assembly trial fit
Details
       

 01-10-2009
4.00
Final fit of Rear Frame Channel
Details
       

 01-09-2009
1.00
Make template, make and fit 6-b-5-4
Details
       

 01-09-2009
1.00
Cut and flange 115mm hole
Details
       

 01-08-2009
1.00
Scrap built the uprights
Details
       

 01-08-2009
1.00
Bend and qualify Parts 6-b-5-1, 6-b-5-3, and 6-b-5
Details
       

 01-07-2009
1.50
Deburr and layout 3 parts
Details
     

 01-06-2009
1.00
Repair elongated hole
Details

 01-05-2009
2.00
Lower left rear longeron repair
Details
       

 01-04-2009
2.00
Take rear fueslage apart for deburring
Details
       

 01-03-2009
1.00
Cable outlet farings 2 of 2
Details
       

 01-03-2009
1.50
Cable outlet farings 1 of 2
Details
       

 01-02-2009
1.00
Attach 6-b-3-6 and L-angles 3 of 3
Details
       

 01-02-2009
2.00
Attach 6-b-3-6 and L-angles 2 of 3
Details
       

 01-02-2009
2.00
Attach 6-b-3-6 and L-angles 1 of 3
Details
       

 01-01-2009
1.00
Drill and cleco left rear fuselage side
Details
       

 12-31-2008
2.00
Tool for cable farings 2 of 2
Details
       

 12-31-2008
2.00
Tool for cable farings 1 of 2
Details
       

 12-31-2008
1.00
Drill right bottom side skin to lower longeron
Details
       

 12-30-2008
1.00
Set rear sides on fuselage bottom
Details
       

 12-30-2008
4.00
Get sides ready to hang on floor
Details
       

 12-30-2008
1.00
Clecoed H.T. frames & brackets
Details
       

 12-30-2008
1.00
Adjust rear side skins down in front
Details
       

 12-29-2008
1.20
Position and pilot drill upper longerons
Details
       

 12-29-2008
2.00
Dimpled skins and longerons, cut L-angles
Details
       

 12-29-2008
1.00
Attached L-Angles to rear sides
Details
       

 12-28-2008
2.00
Layout longeron rivet lines on side skins
Details
       

 12-26-2008
1.00
Upper & lower rudder bushings for rudder
Details
       

 12-26-2008
3.50
Rear side skin layout
Details
       

 12-24-2008
3.00
Fit and rivet rear floor bottom
Details
       

 12-23-2008
2.00
Prime and assemble bottom
Details
       

 12-22-2008
5.00
deburred and fabricated some parts
Details
       

 12-21-2008
4.00
Prep bottom for primer
Details
       

 12-19-2008
2.00
Fitting access door
Details
       

 12-19-2008
2.00
Fitting access door
Details
       

 12-17-2008
0.75
Trim & joggle cross pieces, begin clamping
Details
       

 12-17-2008
1.00
Rear longerons
Details
       

 12-17-2008
0.50
Crease access door
Details
       

 12-17-2008
1.00
Clamp lonerons to bottom skin
Details
       

 12-17-2008
0.50
Attach hinge to access door
Details
       

 12-17-2008
1.50
Access door screw holes
Details
     

 12-16-2008
0.50
Qualify 6-b-2-1 angles

 12-14-2008
3.50
Cut material for rear longerons & sides
Details
       

 12-14-2008
0.50
Bend rear longerons
Details
       

 12-13-2008
1.00
Rivet nut plates to access door frame
Details
       

 12-13-2008
1.00
Make screw holes and layout and drill hinge
       

 12-13-2008
1.00
Drill, drill, drill frame work
Details
       

 12-11-2008
2.00
Make tool for nut plate rivet spacing
Details
       

 12-10-2008
2.00
6-b-3-6 and nut plate layout for access door
Details
       

 12-08-2008
2.70
Layout bottom access hole in floor
Details
       

 12-07-2008
1.00
Smooth out flange on the Z-Angles
Details
       

 12-07-2008
1.00
Layout rivet holes in 6-b-2-3
Details
       

 12-07-2008
1.00
Joggle Forward angles for fit over longerons
Details
       

 12-07-2008
1.00
Form Bottom Longerons
Details
       

 12-07-2008
1.00
Cleco longerons and Z-angles
Details
       

 12-06-2008
1.00
Trimmed ends of L & Z Angles
Details
       

 12-06-2008
0.10
Flange hole in 6-b-1-1
Details
     

 12-06-2008
1.00
Add L angles and other Z angles to bottom skin
Details
       

 12-03-2008
3.00
Layout rivet lines on bottom skin
Details
       

 12-01-2008
1.50
Re-layout bottom skin and trim
Details
       

 12-01-2008
0.50
Layout, cut, cleco and attach fairlead
       

 11-30-2008
1.00
Form Z angle short flange
Details
       

 11-30-2008
1.50
Details 8 & 9
Details
       

 11-30-2008
2.50
Cut and form Z angles
       

 11-30-2008
1.00
Bottom skin layout
Details
       

 11-29-2008
2.00
Trimmed and formed details 1 and 2
Details
       

 11-29-2008
1.50
Formed 5, 6, & 7 details
Details
       

 11-29-2008
0.50
Deburr parts
Details
       

 11-27-2008
1.00
Pull out cut metal and survey what's next
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.