Powered By Kitlog Pro v2.0
Ron Lendon's Aircraft Mfg.
Zodiac CH 601 XL
Fuselage
1-2-2009
< Previous Log Entry
Next Log Entry >
Date:
1-2-2009
Number of Hours:
2.00
Manual Reference:
6-b-4
Brief Description:
Attach 6-b-3-6 and L-angles 2 of 3
Marked and pilot drilled end holes (not the upper hinge bolt holes) in upper longerons to establish the rest of the rivet spacing.
Layout and pilot drill 6-b-3-6 for all the rest of the rivet holes except for the very forward ones for 6-b-12-3 bulkhead.
Set and clecoed 6-b-3-6 on top of the longerons and use it as a template to pilot drill the longerons and H.T's
Marked and pilot drilled end holes
Layout and pilot drill 6-b-3-6
Set and clecoed 6-b-3-6 on top of the longerons
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CZAW CH601XL Home
Light Sport Recumbent Bike Home
Zodiac CH 601 XL Home
Category
# Logs
# Hours
All
1605
3634
Avionics
19
36
Electrical
22
49
Empennage
91
225
Engine
181
358
Facilities
57
177
Flight Testing
12
17
Fuselage
533
1137
Maintenance
8
9
Miscellaneous
35
-74
None
6
196
Nose Gear
7
10
Planning
21
47
Shop Supplies
6
22
Tools
85
185
Wings
457
1054
ZU601XLB
65
186
Copyright © 2001-2024 Matronics. All Rights Reserved.