KitLog pro

Powered By Kitlog Pro v2.0

Ron Lendon's Aircraft Mfg.
Work Logs Found: 1605
Category Work Time: 3352 Hours
 Date
Hours
Work Log Summary

Details

 01-01-2018
3.00
Build a fuel primer 2 of 2
Details
       

 01-01-2018
1.50
Build a fuel primer 1 of 2
Details
       

 04-13-2016
0.00
Why I Use Iridium Spark Plugs
Details
     

 02-14-2015
3.00
Wing Root Faring
       

 02-13-2015
3.00
Wing Root Faring
Details
       

 02-12-2015
2.00
Wing Root Faring
Details
       

 02-11-2014
2.00
Leak Test Carburetor MA3-SPA 10-4895C
Details
       

 01-18-2014
1.00
Vacumn Leak MA3-SPA 10-4895C
Details
       

 12-28-2013
1.00
Check and set timing
Details

 12-09-2013
1.00
Tear down heads to inspect Lean Misfire
Details

 11-19-2013
0.10
Test 93 MOGAS 2 of 2
Details
       

 11-19-2013
0.10
Test 93 MOGAS 1 of 2
Details
       

 02-10-2013
0.10
Start up and warm up
Details
       

 02-10-2013
0.10
Return trip from KOEB 2500'
Details
       

 02-10-2013
0.10
Climb to 3500'
Details
       

 02-09-2013
2.00
Install carb and add louvers to lower cowl
Details

 02-08-2013
1.00
Open Main Jet on the MA3SP 10-2948
Details
       

 01-19-2013
0.50
Phoenix Flight
Details

 01-13-2013
1.00
Spot face upper head bolt bosses
Details

 01-13-2013
4.00
Installed the Falcon heads and adjusted the valves
Details
       

 01-12-2013
4.00
Assemble rods to crank
Details
       

 01-11-2013
2.00
Assemble rods and new 2850 pistons
Details
       

 12-02-2012
4.00
Tear down engine top end
Details
       

 11-29-2012
1.00
Check Cylinder piston clearance
Details
       

 11-28-2012
1.00
Remove pistons from rods, check piston size
Details
       

 10-08-2012
1.00
Airflow through Cowl
Details

 09-23-2012
1.00
Back in the air
Details
       

 09-16-2012
1.00
Made a clay squash heads
Details
       

 08-27-2012
2.00
Finish outside cleaning of pistons
       

 08-24-2012
2.00
De-ring and measure pistons
Details
       

 08-24-2012
1.00
Cleaning carbon off pistons
Details
       

 08-21-2012
0.50
Cylinder deck height measure 2 of 2
Details
       

 08-21-2012
0.50
Cylinder deck height measure 1 of 2
Details
       

 08-20-2012
1.00
Blown Head Gasket teardown 3 of 3
       

 08-20-2012
1.00
Blown Head Gasket teardown 2 of 3
Details
       

 08-20-2012
1.00
Blown Head Gasket teardown 1 of 3
Details
       

 08-10-2012
1.00
Installing the nose gear shock cord 3 of 3
Details
       

 08-10-2012
1.00
Installing the nose gear shock cord 2 of 3
Details
       

 08-10-2012
1.00
Installing the nose gear shock cord 1 of 3
Details
       

 08-08-2012
3.00
Add stop ring to nose gear
Details
       

 08-05-2012
2.00
Limp home gear repair 3 of 3
Details
       

 08-04-2012
1.00
Limp home gear repair 2 of 3
Details
       

 08-04-2012
1.00
Limp home gear repair 1 of 3
Details
       

 06-29-2012
1.00
Ran down the 4000' 28 four times today
Details
       

 06-28-2012
10.00
Moving wings to KPHN
Details
       

 06-26-2012
1.00
It's an Airplane!
Details
       

 06-22-2012
1.00
Two Minute stress test
Details
       

 05-28-2012
2.50
Gascolator heatshield and cowling attach
Details
       

 05-28-2012
2.50
Final entry of the build process, in maintenance m
Details
       

 05-28-2012
4.00
Aileron trim and gascolator heat sheid
Details
       

 05-27-2012
2.50
Routing wires for aileron trim tab
Details
       

 05-27-2012
4.50
Made up sholder harness attach points
Details
       

 05-26-2012
5.00
Documents holder, pitot plumbing
Details
       

 05-25-2012
0.75
Safety wired all control cables 2 of 2
       

 05-25-2012
0.75
Safety wired all control cables 1 of 2
Details
       

 05-25-2012
1.00
Rudder adjust travel, and tow bar
Details
       

 05-24-2012
1.50
Rivet horzontal stabilizer tips
Details
       

 05-24-2012
1.50
Rivet fairleads for ailerons
Details
       

 05-23-2012
2.70
Aileron fairleads and horizontal stabilizer tips
Details
       

 05-22-2012
6.00
Make cables for ailerons
Details
       

 05-21-2012
5.00
Remade the upper elevator cable
Details
       

 05-20-2012
7.00
TheTail is cabled
Details
       

 05-19-2012
5.00
Beging making cables for the controls
Details
       

 05-18-2012
1.50
Saftey wired all control cables 1 of 2
Details
       

 05-18-2012
1.50
R- adjusted flaps
Details
       

 05-16-2012
6.50
Right Flap, Right Aileron, Left Aileron
Details
       

 05-15-2012
2.00
Trim and install left flap
Details
       

 05-14-2012
3.00
Attach right wing
Details
       

 05-13-2012
8.00
Left wing is attached, right wing is next
Details
       

 05-11-2012
3.00
Hang rudder, canopy seal, wing root trim
Details
       

 05-10-2012
2.00
Shop repairs
Details
       

 05-08-2012
2.50
Reset upper hinge
Details
       

 05-07-2012
0.60
Re-make upper rudder hinge
Details
     

 05-07-2012
3.00
Prepare upper rudder hinge placement
Details
       

 05-06-2012
2.50
Seal canopy flashing with sikaflex gray
Details
       

 05-06-2012
2.50
Clean up and re-arrange hangar
Details
       

 05-05-2012
6.00
Moved bench and tool table to hangar
Details
       

 05-03-2012
1.00
Putzing before theEAA meeting
Details
       

 05-02-2012
5.00
Rudder and right wing close to done
Details
       

 05-01-2012
3.00
Stabilizer and rudder
Details
       

 04-30-2012
0.50
Check both AI's with digital manometer
Details

 04-30-2012
3.00
Assembled 90428 and Shop Vac
Details
       

 04-29-2012
2.16
Set Horizontal Stabilizer
Details
       

 04-29-2012
2.16
Move rear spar attach plate, wing wiring
Details
       

 04-29-2012
2.16
Hung tail feathers
Details
       

 04-28-2012
3.00
Set horizontal stabilizer, test run engine
Details
       

 04-27-2012
4.00
Tram wing tips and set horizontal stabilizer
Details
       

 04-26-2012
5.00
Still fitting wings
Details
       

 04-25-2012
1.00
Fitting wings 5 of 5
Details
       

 04-25-2012
1.00
Fitting wings 4 of 5
Details
       

 04-25-2012
1.00
Fitting wings 3 of 5
       

 04-25-2012
1.00
Fitting wings 2 of 5
Details
       

 04-25-2012
1.00
Fitting wings 1 of 5
Details
       

 04-24-2012
2.00
Setting up the angle for wings
Details
       

 04-24-2012
1.00
Almost ready to slide wing in
Details
       

 04-23-2012
1.00
Rudder attach and Numbers
Details
       

 04-23-2012
3.00
First work session at hangar
Details
       

 04-23-2012
0.50
Adding the tail numbers
Details
       

 04-22-2012
2.00
Moving stuff
Details
       

 04-21-2012
1.00
Moving day, fuselage to airport 3 of 3
       

 04-21-2012
1.00
Moving day, fuselage to airport 2 of 3
       

 04-21-2012
1.00
Moving day, fuselage to airport 1 of 3
Details
       

 04-20-2012
3.00
Rivet canopy flashing, grind welds on cowl
Details
       

 04-19-2012
1.20
Fitting Canopy Flashing 5 of 5
Details
       

 04-19-2012
1.20
Fitting Canopy Flashing 4 of 5
Details
       

 04-19-2012
1.20
Fitting Canopy Flashing 3 of 5
Details
       

 04-19-2012
1.20
Fitting Canopy Flashing 2 of 5
Details
       

 04-19-2012
1.20
Fitting Canopy Flashing 1 of 5
Details
       

 04-18-2012
2.00
Fit and cleco inner flashing for the canopy
Details
       

 04-16-2012
1.50
Pilot drill L-Angles for canopy sides
Details
     

 04-16-2012
1.50
Creating the side attachments for the canopy
Details
       

 04-15-2012
0.50
Unload canopy and cover it
Details
       

 04-15-2012
2.00
Marked and trimmed sides of canopy
Details
       

 04-15-2012
2.50
Canopy latch mechanicals'
Details
       

 04-15-2012
0.50
Cable routing for canopy latch
       

 04-14-2012
2.00
Prep canopy latch cable through front hoop
Details
     

 04-14-2012
2.00
Fresh air ducts
       

 04-13-2012
2.00
Fresh air ducts
Details
       

 04-12-2012
3.00
Canopy Flashing
Details
       

 04-11-2012
2.50
Canopy frame flashing
Details
       

 04-10-2012
2.00
Canopy frame work
Details
       

 04-09-2012
3.00
Canopy Flashing
Details
       

 04-08-2012
4.00
Final dress to close up cowling
Details
       

 04-07-2012
2.00
Moving begins
Details
       

 04-07-2012
2.00
Caulking gaps on baffle
Details
       

 04-06-2012
4.00
Odds and ends
Details
     

 04-04-2012
1.00
Cooling baffle on left front
Details
       

 04-02-2012
1.50
Pilot drilling canopy
Details
       

 04-02-2012
0.50
Open holes to 5/16" in canopy
Details
       

 04-02-2012
1.00
Fastening canopy to the hoops
Details
       

 04-01-2012
4.00
Fit and glue the front and rear seals
Details
       

 03-31-2012
5.00
Making rear hoop template
Details
       

 03-31-2012
2.00
Fitting rear tube to the template
Details
       

 03-31-2012
1.00
Fitting front hoop length for the canopy
Details
       

 03-30-2012
3.00
Canopy fitting phase 2, 2 of 2
Details
       

 03-30-2012
3.00
Canopy fitting phase 2, 1 of 2
Details
       

 03-29-2012
2.00
Canopy fitting phase 1
Details
       

 03-29-2012
2.00
Canopy fitting phase 1
Details
       

 03-27-2012
1.00
Trial fit canopy
Details
       

 03-27-2012
2.00
Canopy frame
Details
       

 03-26-2012
2.50
Canopy frame
Details
       

 03-25-2012
2.00
Fit canopy rails
Details
       

 03-25-2012
2.00
First canopy fiting
Details
       

 03-24-2012
3.00
Front Center Baffel
Details
       

 03-23-2012
2.00
Front Center Baffel
Details
       

 03-22-2012
1.00
Front center Baffel
Details
       

 03-22-2012
1.00
Front Center Baffel
Details
       

 03-19-2012
1.00
Front Center Baffel
Details
       

 03-18-2012
4.00
Left front Baffel
Details
       

 03-14-2012
1.00
Engine torsional test and static run
Details

 03-13-2012
3.00
Remake right front baffle
Details
       

 03-12-2012
2.50
Cooling baffel seals
Details
       

 03-06-2012
2.00
Fitting & Wiring Flap Motor
Details
       

 03-05-2012
3.00
Bundled some wires and made flap mtr bushings
Details
     

 03-04-2012
3.00
Wire the trim tab on the elevator
Details
       

 03-02-2012
2.00
Clean up wire mess
Details
       

 02-24-2012
2.00
Finally got the Radio wired
Details

 02-22-2012
2.00
Wired right PTT button
     

 02-21-2012
2.00
Made plugs to hold PTT buttons
       

 02-18-2012
1.00
Wired Comm plug to radio
     

 02-17-2012
1.00
Labled wires
     

 02-16-2012
1.00
Bleed brakes
Details

 02-12-2012
1.00
Solder MIC jacks
Details
       

 02-11-2012
3.00
Made up the antenna cables
Details
       

 02-08-2012
2.50
Wired mp3 hookup and headset jacks
       

 02-07-2012
1.00
Deciding where to poke holes for headsets
       

 02-06-2012
2.00
Measure coax and wire flap motor switches
Details
       

 02-04-2012
2.00
Transponder and Comm Antennas
Details
       

 02-03-2012
1.50
Mounted Remote Compass and fired up Dynon D6
Details
       

 02-01-2012
3.00
Finished bracket for Remote Compass
Details
       

 01-31-2012
1.00
Ran string through the cables runs to locate brack
Details
       

 01-31-2012
3.00
Design bracket for Remote Compass
Details
       

 01-26-2012
2.00
Planning location for Remote Compass
Details
       

 01-25-2012
2.00
Check Dynon D6 Wiring Harness
Details
       

 01-24-2012
4.00
Mount ELT and rear spinner bulkhead
Details
       

 01-23-2012
1.00
Instrument lights
Details
       

 01-22-2012
2.00
Mount Antenna for ELT
Details
       

 01-20-2012
1.00
Assemble and glue lights for Westach gages
       

 01-18-2012
8.00
Front Right Baffle
Details
       

 01-17-2012
8.00
Front Right Baffle
Details
       

 01-13-2012
1.00
Changed out EGT sensors with new ones

 01-12-2012
1.50
Parking brake handle
Details
     

 01-11-2012
1.50
Bleed Brakes
Details

 01-10-2012
3.00
General clean up
Details
       

 01-07-2012
1.00
Engine idle test
Details

 01-04-2012
1.00
Starter Switch
Details
       

 01-03-2012
3.00
Carb re-assemble and mount
Details
       

 12-28-2011
2.00
Carb Idle investigation
Details
     

 12-14-2011
2.00
Check and verify Distributors
Details

 12-13-2011
4.00
Hookin up electrical stuff
Details
       

 12-12-2011
6.00
Tech counselor visit
Details
       

 12-10-2011
1.00
Brake fluid fill
       

 12-09-2011
1.50
Critical Wiring source
Details
       

 12-08-2011
6.00
Lots of learning today
Details
       

 12-07-2011
1.00
Routing tach and alternator wires 2 of 2
       

 12-07-2011
1.00
Routing tach and alternator wires 1 of 2
       

 12-07-2011
1.00
Labeling Light wires
       

 12-05-2011
2.00
Finish Nav/Pos/Land/Taxi/Strobe circuts
Details
       

 12-04-2011
3.00
Make up loom for the Nav/Pos/Land/Taxi lights
Details
       

 12-03-2011
2.00
Unpacking and building wire spool rack
Details
     

 11-30-2011
1.50
Protect wires and cabin heat air deflector
Details
       

 11-26-2011
2.00
Made and installed wire run trough
Details
       

 11-25-2011
2.00
Reset main gear
Details
       

 11-25-2011
1.50
Brake line routing
Details
       

 11-24-2011
2.00
Power to main buss
Details
       

 11-24-2011
2.00
Hide the brake line 3 of 3
Details
       

 11-23-2011
0.75
Hide the brake line 2 of 3
Details
       

 11-23-2011
0.75
Hide the brake line 1 of 3
Details
       

 11-21-2011
2.00
Added starter button and attached fuse block.
Details
     

 11-19-2011
3.00
Alternator Bracket trim
Details
       

 11-16-2011
2.00
Route ignition and temp probe wires through FW
Details
       

 11-15-2011
2.00
Route oil pressure and temp lines through firewall
       

 11-14-2011
2.00
Safety wired the cables
       

 11-14-2011
3.00
Made a ClampTite tool
Details
     

 11-13-2011
2.00
Putzing
Details
       

 11-13-2011
3.00
Main power line to firewall from battery
Details
       

 11-13-2011
1.50
Cabin heat cable
Details
       

 11-12-2011
2.50
Carb heat cable placement
Details
       

 11-11-2011
2.50
Mixture and Carb heat cables
Details
       

 11-09-2011
3.00
Route brake lines from parking brake to caliper
Details
       

 11-08-2011
2.00
Mount parking brake, route lines
Details
       

 11-07-2011
3.00
Parking brake mechanicals
Details
       

 11-06-2011
1.00
Steering rod boots
Details
       

 11-06-2011
2.00
Making things airworthy
Details
       

 11-06-2011
3.00
Brake cylinders
Details
       

 11-05-2011
1.50
Plates for the steering rod boots
Details
       

 11-04-2011
3.00
Throttle ends and Steering rod boots
Details
       

 11-02-2011
3.00
Throttle cables and steel lock nuts
Details
       

 11-01-2011
3.00
Throttle Cables
Details
       

 10-31-2011
2.00
Remove test shroud and start front baffel
Details
       

 10-30-2011
1.00
Flottorp Test 2
Details
     

 10-29-2011
1.00
First test Flottorp 1
Details

 10-28-2011
4.00
Replace cylinder head
Details
       

 10-26-2011
1.00
Right head
Details
       

 10-26-2011
1.50
Get ready for next run
Details
       

 10-25-2011
2.00
Marked Dip Stick & added Mixture cable
Details

 10-23-2011
1.00
Cleaning things up on the engine
Details
       

 10-22-2011
4.00
First engine run on FuselageFirst run in driveway
Details
       

 10-18-2011
3.00
Critical electrical source
Details
     

 10-17-2011
3.00
ReDo Parking Brake
Details
       

 10-16-2011
3.00
Mounted parking brake valves
Details
       

 10-14-2011
3.00
Set upthe Warp Drive prop
Details
       

 10-09-2011
2.00
Tack Pickup mounting
Details
       

 10-07-2011
3.00
Air/Oil Separator plumbing
Details
       

 10-05-2011
1.00
12V pass through on firewall
Details
     

 10-04-2011
3.00
Alternator Bracket
Details
       

 10-01-2011
2.00
Heat muff modification and plug wire spacer
Details
       

 10-01-2011
1.00
Engine Dress, Oil Cooler lines
Details
       

 09-30-2011
2.00
Engine Dress, Oil System
Details
       

 09-29-2011
2.00
Engine Dress, Oil System
Details
       

 09-27-2011
2.00
Engine Dress, Ignition system
Details
       

 09-24-2011
2.00
Engine Dress, Ignition system
Details
       

 09-23-2011
2.00
Made brace for plug wire loom, dist ends
Details
       

 09-22-2011
1.50
Make brackets to hold plug wires
Details
       

 09-20-2011
2.00
Patch air leak in left rear heat shield
Details
       

 09-20-2011
1.50
Engine dress
Details
       

 09-18-2011
1.00
Upper engine baffel
Details
       

 09-18-2011
2.00
Make wire loom and through hole in baffel
       

 09-17-2011
3.00
Baffel oil cooler
Details
       

 09-16-2011
2.50
Baffel and Oil Cooler work
Details
       

 09-15-2011
2.00
Baffel work
Details
       

 09-14-2011
1.50
Baffel work
Details
       

 09-14-2011
1.50
Baffel work
Details
       

 09-13-2011
2.00
Rear Baffel work
Details
       

 09-12-2011
3.00
Planning Baffle Placement
Details
       

 09-11-2011
4.00
Fifth bearing oil supply line
Details
       

 09-10-2011
1.00
Trim leading edge of the air scoop
       

 09-10-2011
3.00
Ignition system
Details
       

 09-09-2011
0.50
Inside heat muff 4 of 4
Details
       

 09-09-2011
0.50
Inside heat muff 3 of 4
Details
       

 09-09-2011
0.50
Inside heat muff 2 of 4
Details
       

 09-09-2011
0.50
Inside heat muff 1 of 4
Details
       

 09-09-2011
1.00
Fabricate repair for heat shield, left rear
Details
       

 09-08-2011
2.00
Carb heat box
Details
       

 09-07-2011
2.00
Make heat muff from galvanized steel
Details
       

 09-06-2011
2.50
Heat muff mock up
Details
       

 09-03-2011
6.00
Air Scoop
Details
       

 09-02-2011
3.00
Air Scoop
Details
       

 09-01-2011
2.00
Air scoop work
Details
       

 08-31-2011
4.00
Carb heat valve for the air scoop
Details
       

 08-30-2011
2.00
Air Scoop for Carb
Details
       

 08-28-2011
1.50
Rivet intake flange for carb inlet
Details
       

 08-27-2011
1.50
Tune up line on cowl top skins
Details
       

 08-27-2011
2.00
Fabricate air inlet for carb.
Details
       

 08-26-2011
2.00
Nose bowl is held by the cowl panels now
Details
     

 08-25-2011
1.50
Lower Side Cowl Panels
Details
       

 08-25-2011
2.50
Lower Cowl Panels
Details
       

 08-24-2011
2.50
Layout and trim rear lower cowl panels
Details
       

 08-24-2011
1.50
Layout and trim front lower cowl panels
Details
       

 08-23-2011
2.50
Make lower cowl panels
Details
       

 08-22-2011
3.00
Tuning up the cowl transistions
Details
       

 08-21-2011
5.00
Added nut plates for the top side cowl skins
Details
       

 08-20-2011
5.00
Side work fueslage and cowl
Details
       

 08-19-2011
2.50
Side upper panels cowl
Details
       

 08-18-2011
1.50
Bubble up Nose Bowl to clear starter
Details
       

 08-18-2011
3.00
Attach hinges to top and bottom cowl panels
       

 08-17-2011
2.00
Parts and cowl hinge work
Details
       

 08-16-2011
1.00
Trim fuselage sides by firewall
       

 08-15-2011
2.00
Trim and fit upper door templates
Details
       

 08-14-2011
4.00
Bracket fab and skin (door) templates
Details
       

 08-13-2011
4.00
Nut plates and dimples for Cowl top and bottom
Details
       

 08-12-2011
3.00
Joggle nose bowl and tune up and structure cowl
Details
       

 08-10-2011
3.00
Prep for putting joggle in the nose bowl
Details
       

 08-09-2011
3.00
Upper center cowl
Details
       

 08-09-2011
3.00
Lower cowl / air intake
Details
       

 08-08-2011
1.00
Align Nose Bowl with Fuselage
Details
       

 08-07-2011
2.00
Trim rear edge of Nose Bowl & make Alt Brkt
Details
       

 08-06-2011
4.00
Cowl and Nose Bowl
Details
       

 08-05-2011
2.00
Finish welding nose bowl
Details
       

 07-14-2011
2.00
Patching and welding nose bowl
Details
       

 07-10-2011
3.50
Tune up front face of lower nose bowl
Details
       

 07-10-2011
1.50
Tack welding and cutting center hole in Nose Bowl
       

 07-08-2011
3.00
Fitting lower nose bowl
Details
       

 07-08-2011
2.00
Fitting lower nose bowl
Details
       

 07-07-2011
5.00
Tack Welding Upper Nose Bowl
Details
       

 07-06-2011
7.00
Upper Nose Bowl
Details
       

 07-05-2011
3.00
Upper Nose Bowl
Details
       

 07-05-2011
2.00
Lower Nose Bowl
Details
       

 07-04-2011
4.00
Lower Nose Bowl
Details
       

 07-02-2011
3.00
Lower Nose Bowl
Details
       

 07-01-2011
3.00
Finished the Battery Box
Details
       

 06-24-2011
1.00
Nosebowl Lower Panel restart
Details
       

 06-24-2011
4.00
Battery box
Details
       

 06-23-2011
4.00
Tune up the wheels of the HF English Wheel
Details
       

 06-20-2011
0.60
Template lower nosebowl 4 of 4
Details
       

 06-20-2011
0.60
Template lower nosebowl 3 of 4
Details
       

 06-20-2011
0.60
Template lower nosebowl 2 of 4
Details
       

 06-20-2011
0.60
Template lower nosebowl 1 of 4
Details
       

 06-19-2011
2.00
Prop crush plate
Details
       

 06-18-2011
1.00
Lower nosebowl templates
Details
       

 06-17-2011
2.00
Templates for the top side of the nosebowl
Details
       

 06-16-2011
2.00
Nosebowl template and fuel line
Details
       

 06-13-2011
2.00
Make a template of nosebowl
Details
       

 06-09-2011
1.00
Destroyed the material by over working it
Details
       

 06-07-2011
1.00
Soften bends in lower nosebowl
Details
       

 06-03-2011
0.10
Waiting on a friend
Details
       

 06-01-2011
2.00
Focused metal movement to tighten it up to form
Details
       

 05-31-2011
2.00
Little tune up and lots of rest today
Details
       

 05-30-2011
3.50
Almost destroyed the bottom nose bowl
Details
       

 05-29-2011
3.50
Shaping the air inlets
Details
       

 05-28-2011
4.00
Shaping the air inlets
Details
       

 05-21-2011
0.50
Smooth out main center shape and tuck in one side
Details
       

 05-20-2011
0.63
Nosebowl Shot Bag 4 of 4
Details
       

 05-20-2011
0.63
Nosebowl Shot Bag 3 of 4
Details
       

 05-20-2011
0.63
Nosebowl Shot Bag 2 of 4
Details
       

 05-20-2011
0.63
Nosebowl Shot Bag 1 of 4
Details
       

 05-19-2011
1.50
Afternoon nose bowl work
Details
       

 05-19-2011
2.00
4am morning, can't sleep, so get to work...
Details
       

 05-17-2011
0.63
Nose bowl bottom skin 4 of 4
Details
       

 05-17-2011
0.63
Nose bowl bottom skin 3 of 4
Details
       

 05-17-2011
0.63
Nose bowl bottom skin 2 of 4
Details
       

 05-17-2011
0.63
Nose bowl bottom skin 1 of 4
Details
       

 05-16-2011
2.00
Move english wheel from basement to Garangar
Details
       

 05-15-2011
0.30
Nosebowl Air inlet remake 7 of 7
Details
       

 05-15-2011
1.40
Nosebowl Air inlet remake 6 of 7
Details
       

 05-15-2011
0.30
Nosebowl Air inlet remake 5 of 7
Details
       

 05-15-2011
0.50
Nosebowl Air inlet remake 4 of 7
Details
       

 05-15-2011
0.10
Nosebowl Air inlet remake 3 of 7
Details
       

 05-15-2011
0.10
Nosebowl Air inlet remake 2 of 7
Details
       

 05-15-2011
0.30
Nosebowl Air inlet remake 1 of 7
Details
       

 05-14-2011
0.80
Nosebowl 5 of 5
Details
       

 05-14-2011
0.80
Nosebowl 4 of 5
Details
       

 05-14-2011
0.80
Nosebowl 3 of 5
Details
       

 05-14-2011
0.80
Nosebowl 2 of 5
Details
       

 05-14-2011
0.80
Nosebowl 1 of 5
Details
       

 05-14-2011
1.00
Begin nose bowl fabrication
Details
       

 05-12-2011
3.00
Welding the exhaust
Details
       

 05-12-2011
1.00
Heat muff for carb and cabin heat
Details
       

 05-10-2011
1.60
Turn left exhaust towards the rear
Details
       

 05-08-2011
1.25
Fabricate exhaust right and left side 2 of 2
Details
       

 05-08-2011
1.25
Fabricate exhaust right and left side 1 of 2
Details
       

 05-07-2011
0.88
Fabricate right exhaust pipe & heat muff 4 of 4
Details
       

 05-07-2011
0.88
Fabricate right exhaust pipe & heat muff 3 of 4
Details
       

 05-07-2011
0.88
Fabricate right exhaust pipe & heat muff 2 of 4
Details
       

 05-07-2011
0.88
Fabricate right exhaust pipe & heat muff 1 of 4
Details
       

 05-04-2011
1.50
Replace my distributor with WW E/P unit
Details
       

 05-03-2011
2.50
Re-riveted nut plates, Fuel system pressure test
Details
       

 05-02-2011
1.00
Fuel system plumbing 2 of 2
Details
     

 05-02-2011
2.00
Fuel system plumbing 1 of 2
Details
       

 05-01-2011
3.00
Top Skin Fitting
Details
       

 04-30-2011
3.50
Nut plates for removable top skin
Details
       

 04-28-2011
1.00
Drilling holes for nut plate rivets
Details
     

 04-27-2011
1.00
Make tool for nut plate hole spacing
Details
       

 04-26-2011
2.00
Inventory, tool making, dimpling
Details
       

 04-25-2011
3.00
Fuel system and IP brace
Details
       

 04-22-2011
2.00
Rivet step farings
       

 04-22-2011
3.00
Fitting the side panels behind canopy hinge
Details
       

 04-21-2011
1.00
Test fit top skin
Details
       

 04-20-2011
2.00
Structure planning
Details
       

 04-11-2011
2.00
Step farings (verticle)
Details
       

 04-09-2011
2.00
Step faring bottom
Details
       

 04-08-2011
4.00
Test fit IP with all the stuff in it
Details
       

 04-06-2011
2.00
Make up fuel line and connect pumps to carb
Details
       

 04-04-2011
1.00
Carb parts arrived
Details
       

 04-03-2011
2.00
Step faring
Details
       

 04-03-2011
2.00
Make step tube pilot to connect the step
Details
       

 04-02-2011
2.00
Flap controls
Details
       

 04-02-2011
1.50
Electrical planing
Details
       

 04-01-2011
1.50
Brake pedal riviting and pedal placement
Details
       

 03-31-2011
8.00
Fuel delivery system
Details
       

 03-29-2011
3.50
Brakes and steering link windows
Details
       

 03-28-2011
2.00
Triming seat foam and sending it out for upolstery
Details
       

 03-27-2011
3.00
Seat foam gluing
Details
       

 03-27-2011
3.50
Brake pedals
Details
       

 03-26-2011
3.00
Gluing the seat foam
Details
       

 03-26-2011
3.00
Engine mount, brake pedal hinges
Details
       

 03-24-2011
2.00
Brake pedals, steering rods, & seat cushions
Details
       

 03-23-2011
2.00
Test fit rudder pedals and make two brake pedals
Details
       

 03-22-2011
1.50
Reset main gear with 3/16" red neoprene
Details
       

 03-20-2011
2.50
Rearrange the garangar
Details
       

 03-19-2011
7.00
On its gear finally
Details
       

 03-17-2011
2.00
Landing gear
Details
       

 03-16-2011
3.50
Attaching the steel parts.
Details
       

 03-12-2011
1.50
IP Reinforcement angles
Details
       

 03-11-2011
1.50
IP Cutouts for trim controls
       

 03-09-2011
2.50
More IP work
Details
       

 03-07-2011
2.00
Custom fitting guages
Details
       

 03-06-2011
7.00
Poking Large holes in the IP
Details
       

 03-05-2011
2.00
Top skin firewall to IP
Details
       

 03-05-2011
2.00
remake the Panel Side Angles
Details
       

 03-05-2011
1.00
Paste print to IP
Details
       

 03-05-2011
1.00
Center punch and pilot drill IP face
Details
       

 03-03-2011
1.00
Cut paper IP layout and Top skin
Details
       

 03-02-2011
2.00
Print full size layout of IP
Details
     

 03-01-2011
1.30
Cutting seat foam
Details
       

 02-28-2011
1.00
Cutting seat foam
Details
       

 02-27-2011
2.00
Seat buck
Details
       

 02-26-2011
1.50
Seat buck for foam fitting
Details
       

 02-26-2011
2.00
Drill holes in the fork and doubler
Details
       

 02-25-2011
3.00
Nose wheel fork and mount 3 tires
Details
       

 02-24-2011
1.50
Nose wheel fork
Details
       

 02-23-2011
0.75
Starter support bracket 2 of 2
Details
       

 02-23-2011
0.75
Starter support bracket 1 of 2
Details
       

 02-22-2011
2.00
Starter bracket and dip stick
Details
       

 02-21-2011
2.00
Forward center console verticle panels
Details
       

 02-20-2011
3.00
Center console screw mounting
Details
       

 02-19-2011
4.00
Reverse some rivets and test bend nose gear
Details
       

 02-19-2011
3.00
Nose gear lower bearing
Details
       

 02-18-2011
4.50
Little bit of fab and a lot of welding
Details
       

 02-17-2011
2.20
Cross drilling Nose Gear down tube
Details
       

 02-16-2011
1.50
Nose gear Bottom plate
Details
       

 02-15-2011
1.00
Nose gear, cut and fit pipe
Details
       

 02-15-2011
0.50
Incoming Shipments and invetory control
Details
       

 02-14-2011
2.00
Incoming shipments
Details
       

 02-12-2011
5.00
Alternator bracket redesign for Kubota
Details
       

 02-11-2011
6.00
Alternator bracket fabrication
Details
       

 02-10-2011
1.00
Finally got a Lowrance update from LEI Extras
Details
       

 02-10-2011
4.00
Collect steel parts for media blast and paint
Details
       

 02-09-2011
7.00
Center console
Details
       

 02-08-2011
2.00
Cut and bend 6-K-2 parts for the Center Console
       

 02-07-2011
4.00
IP and firewall fuel pass through fabrication
Details
       

 02-06-2011
2.00
Add a few rivets and plan instrument panel
Details
       

 02-05-2011
3.50
Riviting top skins and seat
       

 02-05-2011
3.00
Longeron Doubler
Details
       

 02-04-2011
1.50
Shaping metal around front hoop
Details
       

 02-03-2011
3.00
Rear forward top skin
Details
       

 02-02-2011
5.00
Forward rear skin
Details
       

 02-01-2011
8.00
Layout and drill upper rear forward skin
Details
       

 01-31-2011
3.00
Positioned forward rear skin
Details
       

 01-30-2011
3.00
Trim and fit fuselage hoops
       

 01-29-2011
3.00
Canopy hoops
Details
       

 01-28-2011
2.00
Bending tube
Details
       

 01-28-2011
2.00
Bending tube
Details
       

 01-27-2011
4.00
Picking up material
Details
       

 01-27-2011
2.50
Bend tube for fuselage
Details
       

 01-26-2011
2.00
Flap torque arm install 3 of 3
Details
       

 01-26-2011
2.00
Flap torque arm install 2 of
Details
       

 01-26-2011
1.00
Flap torque arm install 1 of
Details
       

 01-25-2011
2.00
Seats and arm rest
Details
       

 01-25-2011
1.50
Cutting holes
       

 01-25-2011
1.40
Arm rest & Flap Torque Tube
Details
       

 01-24-2011
2.75
Center console / arm rest
Details
       

 01-23-2011
1.50
Seat and arm rest work
Details
       

 01-22-2011
1.00
Position front control stick bearing
Details
       

 01-21-2011
2.00
Seat back Chanel & forward torque tube bearing
Details
       

 01-19-2011
3.50
Seat back, center support & doubler
Details
       

 01-19-2011
2.00
Seat back riveted in place
Details
       

 01-19-2011
3.00
Flanging hole back into shape
Details
       

 01-18-2011
4.00
Seat back support and flap motor mount
Details
       

 01-18-2011
3.00
Finish left front seat panel, start seat back supp
Details
       

 01-17-2011
1.75
Right front seat panel rivetd in place
Details
       

 01-16-2011
1.50
Adding .040 L angles to front seat panel
Details
       

 01-13-2011
1.50
Front seat panel / angles
Details
       

 01-12-2011
1.50
Front Seat Panel
Details
       

 01-11-2011
2.00
Clean up and rivet bottom of fuselage
Details
       

 01-10-2011
1.50
Layout trim and rivet last section of side skin
       

 01-10-2011
1.00
Install Z-Angles Left and Right sides
       

 01-09-2011
1.00
Rivet gussets right side start seats
Details
       

 01-08-2011
1.00
Caulk, rivet front side skins and firewall 3 of 3
       

 01-08-2011
2.00
Caulk, rivet front side skins and firewall 2 of 3
Details
       

 01-08-2011
2.00
Caulk, rivet front side skins and firewall 1 of 3
Details
       

 01-07-2011
1.50
Fresh air vents
Details
       

 01-04-2011
2.00
Fresh air vents
Details
       

 01-03-2011
0.50
Finish up forward side skin rivet lines 3 of 3
Details
       

 01-03-2011
1.00
Finish up forward side skin rivet lines 2 of 3
Details
       

 01-03-2011
1.00
Finish up forward side skin rivet lines 1 of 3
Details
       

 01-01-2011
1.00
L-Angles front side skins 2 of 2
Details
       

 01-01-2011
1.00
L-Angles front side skins 1 of 2
Details
       

 12-31-2010
4.00
Fitting forward side skins
Details
       

 12-30-2010
2.00
Begin joining front floor and side skins
Details
       

 12-30-2010
5.00
Add 6ZU3-2 doubler and rivets to spar verticles
       

 12-29-2010
3.00
Doubler upper center spar uprights left side
Details
       

 12-28-2010
5.00
Doubler upper center spar uprights right side
Details
       

 12-26-2010
5.00
Set center spar rear wing attachment uprights
Details
       

 12-25-2010
2.00
Reset wing jigs and mark for transfer punch
Details
       

 12-25-2010
1.00
Front outer Seat Belt Attach points
     

 12-24-2010
3.00
Rivet baggage floor in place
Details
       

 12-24-2010
2.00
Made 10 degree rivet button for getting in tight p

 12-23-2010
2.00
Rivet parts together
Details
       

 12-23-2010
2.00
Establish rivetline on outer skins
Details
       

 12-23-2010
3.00
Baggage floor
Details
       

 12-22-2010
2.00
Rivet splice upper rear longerons
Details
       

 12-22-2010
3.00
Reset fuselage
Details
     

 12-20-2010
2.00
Main cabin floor and baggage floor
Details
       

 12-20-2010
2.00
Baggage floor
Details
       

 12-19-2010
3.00
Main cabin floor
Details
       

 12-11-2010
5.00
Fuselage Center Spar and Baggage Floor
Details
       

 12-10-2010
1.00
Rear baggage floor
Details
       

 12-07-2010
1.00
Enlarge pilot holes to 5/32 and 1/8 side skins
       

 12-05-2010
3.00
Main gear upright supports
Details
       

 12-04-2010
2.50
Main Landing Gear Attachment
Details
       

 12-04-2010
2.50
Main Landing Gear Attachment
Details
       

 12-01-2010
1.00
Main Landing gear
Details
       

 11-30-2010
2.00
Main Landing Gear Attachment
Details
       

 11-29-2010
2.00
Main Landing Gear Attachment
Details
       

 11-27-2010
1.00
Making the rear baggage floor
Details
       

 11-27-2010
4.00
Baggage tray
Details
       

 11-26-2010
2.00
Main gear attachment stud tool
Details
     

 11-25-2010
2.00
Adjust side skins and deburr some update parts

 11-23-2010
3.00
Cut holes in side skins
Details
       

 11-22-2010
2.00
Get 13 De-Sta-Co 424 clamps
Details
       

 11-22-2010
1.00
Adjust bend near center spar on floor
Details
       

 11-21-2010
2.00
Trimmed and hung side skins
Details
       

 11-20-2010
2.50
Upper Seat & Baggage Floor Support
Details
       

 11-20-2010
1.50
Set instrument panel and hang side skins
Details
       

 11-19-2010
3.00
More fuselage work
Details
       

 11-19-2010
2.50
Fuselage work
Details
       

 11-18-2010
3.00
Fit bottom skin doubler 6ZU2-9
Details
       

 11-17-2010
2.00
Setting rear wing attach points
Details
       

 11-15-2010
6.50
Recheck and reset everything
Details
       

 11-13-2010
2.50
Remove rear frame assembly to relocate it
Details
       

 11-05-2010
2.00
Take engine off mount and tidy up
Details
       

 11-04-2010
3.50
Wing Jigs
Details
       

 11-03-2010
3.50
Move rear fuselage back and start front build up
Details
       

 11-02-2010
4.00
Setting up for fuselage marriage
Details
       

 11-02-2010
1.00
Set rear fuselage
Details
       

 11-02-2010
1.00
Rear fuslage prep work
Details
       

 11-02-2010
1.00
Rear fuselage prep work
Details
       

 11-01-2010
1.00
Putzing around
Details

 10-30-2010
1.10
Rough trim rear top skin
Details
       

 10-29-2010
0.50
Drill and cleco rear top skin 3 of 3
Details
       

 10-29-2010
0.50
Drill and cleco rear top skin 2 of 3
Details
       

 10-29-2010
1.00
Drill and cleco rear top skin 1 of 3
Details
       

 10-28-2010
1.20
Setting top rear skin on fuselage
Details
       

 10-28-2010
1.80
Rear top fuselage skin
Details
       

 10-28-2010
0.50
Clamping rear top skin in place
Details
       

 10-26-2010
2.00
Setup bulkheads on rear fuselage
Details
       

 10-25-2010
3.00
Prepping rear fuselage for assembly
Details
       

 10-24-2010
4.00
Prime mating surfaces on rear fuselage
Details
       

 10-08-2010
1.00
Connect aileron trim tab to motor
Details
     

 10-07-2010
2.00
Cutout rear spar clearance in rear side skin
Details
       

 10-06-2010
2.00
Assembled rear sides of fuselage
Details
       

 10-05-2010
1.00
Clean off bench and prep for fuselage assembly
Details
     

 09-27-2010
0.50
Fitting exhaust manifolds
Details
       

 09-27-2010
0.50
Alternator and Regulator/Rectifier arrived
Details
       

 09-26-2010
2.00
Rework exhaust manifolds
Details
       

 09-26-2010
2.00
Make tools and rework exhaust manifolds
Details
       

 09-25-2010
5.00
Make fixture for exhaust manifold
Details
       

 09-22-2010
1.50
Purge weld exhaust manifold
Details
       

 09-21-2010
2.00
Tack exhaust manifold tube to stubs
Details
       

 09-20-2010
1.25
Shape exhaust manifold end
Details
       

 09-20-2010
1.25
Rough cut holes
Details
       

 09-18-2010
1.00
Fabricate exhaust
Details
       

 09-18-2010
1.00
Fabricate exhaust
Details
       

 09-18-2010
1.00
Check inside of intake
Details

 09-17-2010
5.00
Intake weld clean up
Details
       

 09-10-2010
1.00
Weld intake system
Details
       

 09-10-2010
1.50
Adjust / Fit intake after welding
Details
       

 09-08-2010
1.00
Tack weld intake on the engine
Details
       

 09-04-2010
2.25
Intake Fabrication
Details
       

 09-04-2010
1.25
Intake Fabrication
Details
       

 09-04-2010
1.00
Intake Fabrication
Details
       

 09-03-2010
2.00
Intake Fabrication
Details
       

 09-03-2010
2.50
Intake Fabrication
Details
       

 09-03-2010
1.00
Intake Fabrication
Details
       

 08-31-2010
2.00
Intake fabrication
Details
       

 08-30-2010
2.50
Begin fab of intake system
Details
       

 08-28-2010
3.00
Riveting firewall
Details
       

 08-28-2010
0.50
Finished riveting and torqued center spar
Details
     

 08-27-2010
1.00
Set rivets with squeezer in center spar
Details
       

 08-27-2010
2.00
Firewall riveting
Details
       

 08-27-2010
2.00
Firewall Riveting
Details
       

 08-25-2010
1.00
Buck rivets in top center spar
Details
       

 08-23-2010
2.00
Back drill center spar
Details
   &n