Powered By Kitlog Pro v2.0
Ron Lendon's Aircraft Mfg.
Zodiac CH 601 XL
Fuselage
9-25-2009
< Previous Log Entry
Next Log Entry >
Date:
9-25-2009
Number of Hours:
2.00
Manual Reference:
Main Gear
Brief Description:
Bolt holes for axel 2 of 3
Placed a strong clamp and drill one hole and place a bolt through and tightened. Drilled next hole diagonal and bolted it also.
Drilled the next two holes after removing the clamp. Used lots of Tap Magic and cleared chips often, about 5 pecks or more to get through.
Flipped guide to outside, bolted two holes diagonal then reamed other two holes. Bolted the reamed holes and removed others and reamed them also.
Strong clamp
Bolted to drill next two
High speed hand drill
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CZAW CH601XL Home
Light Sport Recumbent Bike Home
Zodiac CH 601 XL Home
Category
# Logs
# Hours
All
1605
3634
Avionics
19
36
Electrical
22
49
Empennage
91
225
Engine
181
358
Facilities
57
177
Flight Testing
12
17
Fuselage
533
1137
Maintenance
8
9
Miscellaneous
35
-74
None
6
196
Nose Gear
7
10
Planning
21
47
Shop Supplies
6
22
Tools
85
185
Wings
457
1054
ZU601XLB
65
186
Copyright © 2001-2024 Matronics. All Rights Reserved.