Powered By Kitlog Pro v2.0
Eddie's Zodiac XL Project
Zodiac 601 XL
Front Fuselage
Work Logs Found:
46
Category Work Time:
102 Hours
Date
Hours
Work Log Summary
Details
12-15-2006
1.00
Right side flashing nutplates
Details
12-14-2006
1.50
SIde flashing nut plates
Details
12-04-2006
0.20
Nose gear bungee
Details
11-23-2006
1.50
Etch Priming parts
Details
11-21-2006
1.00
Right NACA duct installed
Details
11-19-2006
1.00
Installed left NACA duct
10-14-2006
4.00
Repair of front flashing angle
Details
10-12-2006
8.00
Canopy rails
Details
10-03-2006
0.50
Nose gear stop plate
Details
08-24-2006
2.00
Seat bottoms and seat belt brackets
Details
08-24-2006
3.00
Flap motor bracket and torque tube
Details
08-17-2006
2.00
Control Stick torque tube
Details
08-15-2006
2.00
Upper Fuse Longeron Doubler
Details
08-06-2006
2.00
Left and right seat belt attachment brackets
Details
08-06-2006
2.00
Bottom seat stiffener and flap motor support
Details
08-05-2006
4.00
Rear spar supports and seat supports
Details
08-05-2006
3.00
Front seat pannels and spar access covers
Details
08-04-2006
2.00
Nose gear and front seat pannel
Details
08-03-2006
1.50
Front seat supports
08-02-2006
4.00
Nose gear
Details
08-01-2006
2.00
Trim side skins, rivet right side of fuse
Details
07-30-2006
0.00
Putting it back together
Details
07-30-2006
7.00
Disassemble front fuse
Details
07-29-2006
4.00
Disassemble left side
Details
07-28-2006
0.50
Bottom front L angles
Details
07-25-2006
2.50
Back drilled front side skins
Details
07-22-2006
3.00
Forward fuse horizontal supports
Details
07-22-2006
2.00
Center spar supports
Details
07-21-2006
5.00
Landing gear brackets
Details
07-20-2006
2.00
Leveling fuse
Details
07-19-2006
2.00
Moving fuse off the bench
Details
07-17-2006
4.00
Finished left and right front fuse skins
Details
07-16-2006
3.00
Front left side skin
Details
06-29-2006
2.00
Installed firewall and level fuse
Details
06-29-2006
2.00
Engine mounts and longerons attached
Details
06-29-2006
1.00
Engine mounts
06-29-2006
1.00
Adding supports to the firewall
Details
06-27-2006
1.50
Made left side wing jig
Details
06-26-2006
2.00
Installed center wing spar
Details
06-26-2006
0.50
Front wheel bottom bearing support
Details
06-24-2006
2.00
Joined the Front and Rear fuselage
Details
06-23-2006
1.50
Marked and drilled the pedals and brakes
Details
06-22-2006
1.50
Setting up the toe brakes
Details
06-21-2006
1.00
Rudder pedals
Details
06-21-2006
1.00
Front fuse buttom stiffeners
Details
06-20-2006
1.50
Started on front fuselage
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Zodiac 601 XL Home
Category
# Logs
# Hours
All
541
2696
Ailerons
8
38
Avionics
22
110
Baggage Tray
7
18
Brakes
2
14
Canopy
20
141
Center Fuselage
18
116
Centre spar
1
37
Cowling
24
109
Empennage
44
231
Engine
13
114
Fairing
13
87
Final Assembly
1
39
Firewall
13
66
Flap assembly
5
30
Flight testing
4
25
Front Fuselage
46
115
Fuselage
29
176
FWF
5
16
Instrument panel
1
50
Left Wing
33
76
Miscellaneous
43
142
Mounting Horizontal
3
4
Painting
56
219
Prop
1
7
Rear turtle deck
8
38
Shop Supplies
1
2
Test flying
4
10
Undercarriage
3
6
Undercarridge
3
6
Upgrade
2
52
Upholstery
2
6
Weight and Balance
1
1
Wheels and brakes
14
41
Wings
91
554
Copyright © 2001-2025 Matronics. All Rights Reserved.