After the Spar box was complete, I started crimping the two vertical L angles that support the forward skin. Again because the skins are pre-drilled its only a matter of getting the bend correct and back drilling. I followed this with the two horizontal L angles on the left and right side. I am going to have to get some help finishing the bottom floor section off because I can't reach inside to back drill and push the skins in at the same time. Perhaps Monday or Tuesday I'll get Clive to come over for 1 hour to help get this done.
Vertical L angle crimped and back drilled to the side skins
Right view, horizontal L angles installed in forward fuse
Left view, horizontal L angles installed in forward fuse