KitLog pro

Powered By Kitlog Pro v2.0

Bob Leffler's RV-10
' style=
Date:  12-18-2008
Number of Hours:  1.00
Manual Reference:  18-5
Brief Description:  Riveted tank attach bracket on both fuel tanks

18-5, Step 8, Riveted fuel tank attach bracket on both left and right fuel tanks. Used the left over sealant to cover the shop heads of the rivets on the j-channel in the left fuel tank. Brad assisted me today with the bucking bar.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.