KitLog pro

Powered By Kitlog Pro v2.0

Bob Leffler's RV-10
' style=
Date:  3-9-2008
Number of Hours:  3.00
Manual Reference:  13-3
Brief Description:  Preparing the spar

13-3, Steps 1-3

I countersinked the nutplate attachment holes on the spar and per the instructions ran a #40 drill through all the holes on the spar flange that were already matched drilled.

The next step is to rivet the nutplates, but I am holding off for awhile. I ordered an alodine pen from Steins that I want to touch up the spar where the anodizing was removed.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.