KitLog pro

Powered By Kitlog Pro v2.0

Bob Leffler's RV-10
' style=
Date:  2-10-2007
Number of Hours:  8.00
Manual Reference:  6-3
Brief Description:  Match Drilling skin and ribs, dimpling

Completed steps 3 through 11 on page 6-3. Was assisting by Brad and Jan with the match drilling and dimpling of the VS skin.
' style=

Cleco the VS sking to the frame

Cleco the VS sking to the frame

' style=

Brad is dimpling the VS skin

Brad is dimpling the VS skin

' style=

Jan is assisting both Brad and I dimple the skin

Jan is assisting both Brad and I dimple the skin

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.