KitLog pro

Powered By Kitlog Pro v2.0

Chris's RV-14A Site
Work Logs Found: 38
Category Work Time: 157 Hours
 Date
Hours
Work Log Summary

Details

 09-17-2017
5.00
Rudder fairing
Details
     

 03-17-2017
2.00
fiberglass work
Details
       

 12-01-2015
3.00
Working on horizontal stabilizer tips
Details
       

 11-27-2015
1.00
Drill control horns for pushrod
Details
     

 11-25-2015
3.00
Match drilling the control horns for the center be
Details
       

 11-24-2015
6.00
Connect elevators to stabilizer
Details
       

 11-23-2015
4.00
Preparing rudder for hanging
Details

 11-21-2015
1.00
Trim servo connector wiring
Details
       

 11-17-2015
4.00
Add rudder tip
Details
     

 11-16-2015
3.00
Work on elevator finishing
Details
     

 10-30-2015
4.00
Pro Seal (Flame Master) foam ribs
Details
     

 10-29-2015
3.00
Assembly of right elevator
Details
     

 10-25-2015
6.00
Elevator ribs and rear spar riveting
Details
       

 10-24-2015
4.00
Assembling the fwd and rear elevator spars
Details
     

 10-20-2015
5.00
Priming elevator parts for assembly
Details
     

 10-19-2015
4.00
Prep for primer
Details
     

 10-16-2015
2.00
Dimpling and cuntersinking elevators
Details
     

 10-15-2015
5.00
Prepare elevator parts for priming
Details
     

 10-14-2015
6.00
Beginning to work on the elevators
Details
       

 10-10-2015
5.00
Completed horizontal stabiizer
Details
       

 10-07-2015
3.00
Riveting stabilizer skins
Details
       

 10-06-2015
5.00
Assemble spars then attach to stabilizer ribs
       

 10-05-2015
5.00
Assemble front and rear spars for horizontal stab
Details
     

 10-04-2015
2.00
Prime all parts for horizontal stabilizer
Details
     

 10-03-2015
5.00
Horizontal stabilizer spars
Details
     

 10-02-2015
3.00
Horizontal stabilizer
Details
     

 10-01-2015
5.00
Rudder trailing edge
Details
       

 09-30-2015
6.00
Rudder assembly continues
Details
       

 09-29-2015
4.00
Rudder assembly
Details
     

 09-28-2015
6.00
Continued working on vertical stab and rudder asem
Details
       

 09-27-2015
5.00
Tail assembly continues
Details
     

 09-26-2015
3.00
Starting to rivet parts
Details
       

 09-18-2015
8.00
Prime vertical stabilizer parts and some rudder pa
Details
       

 09-17-2015
6.00
Prepare rudder parts for primer
     

 09-16-2015
6.00
Deburring and dimpling vertical stabilizer
     

 09-15-2015
4.00
vertical stabilizer
Details
     

 09-14-2015
3.00
Vertical stabilizer contruction
     

 09-13-2015
2.00
Empenage inventory
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.