Powered By Kitlog Pro v2.0
Chris's RV-14A Site
RV-14A
Empennage
10-29-2015
< Previous Log Entry
Next Log Entry >
Date:
10-29-2015
Number of Hours:
3.00
Manual Reference:
Brief Description:
Assembly of right elevator
Assembled right elevator skins and front spar and getting it ready for gluing the foam ribs. Lots of pull rivets for the elevator ribs and to attach the ribs to the front spar.
attaching elevator skins together
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-14A Home
Category
# Logs
# Hours
All
517
2694
Avionics
59
320
Avionics/Electrical
59
320
Empennage
38
157
Engine
24
111
Final assembly
22
97
Finish Kit
34
170
Firewall Forward
11
49
Fuselage
112
667
Miscellaneous
4
8
Painting
38
218
Prop
1
2
Rear Fuselage
14
67
Shop Supplies
1
4
Wings
100
504
Copyright © 2001-2024 Matronics. All Rights Reserved.