KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
Work Logs Found: 31
Category Work Time: 43 Hours
 Date
Hours
Work Log Summary

Details

 06-26-2018
0.50
New tail number location
Details
     

 06-13-2018
0.50
Passenger Headrest is a muffler?
Details
     

 05-12-2018
0.00
New DATA plate and a kick ass compressor
Details
       

 05-09-2018
5.00
The big MOVE!
Details
       

 05-08-2018
0.00
All the little things 2
Details
       

 05-08-2018
5.00
All the little things
Details
       

 05-03-2018
0.00
The big move begins
Details
     

 01-21-2018
1.00
She flipped!
Details
       

 01-15-2018
1.00
Roll over jigs assembled
Details
     

 01-13-2018
1.00
Getting ready for flip #2
Details
       

 10-29-2015
1.50
Heaters installed and ready for flight testing
Details
     

 10-29-2015
3.00
Heater wire routing continues
Details
       

 10-28-2015
2.00
Cabin Heat wires get run
Details
       

 10-27-2015
1.00
Cabin Heat wiring begins
Details
     

 10-25-2015
0.50
Heater testing begins
Details
       

 10-16-2015
0.00
The coolest HOT update so far
Details
     

 10-14-2015
1.00
New Canopy seal and avionics cover install
Details
     

 10-06-2015
0.50
The Map Box is complete
Details
       

 10-04-2015
1.50
Box filler and sanding and final fit
Details
     

 10-03-2015
0.00
Box Door fit and install 2
Details
       

 10-03-2015
2.50
Box Door fit and install
Details
       

 10-02-2015
3.00
The Box continues
Details
     

 09-30-2015
2.00
Time to build the box
Details
       

 09-29-2015
1.00
The glove box begins
Details
     

 01-29-2015
2.00
The FAA couldn't stump me!
Details
     

 12-06-2014
1.50
Legal Docs
Details
       

 12-04-2014
0.00
N316NM is airworthy 2
Details
       

 12-04-2014
2.00
N316NM is airworthy
Details
       

 05-17-2014
2.00
FLIPPIN the BIRD!
Details
       

 05-12-2014
1.00
spar support pallets
Details
     

 05-10-2014
1.00
props for Flipping the bird
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.