Building Integrity
Long Ez
Miscellaneous
Work Logs Found:
31
Category Work Time:
43 Hours
Date
Hours
Work Log Summary
Details
06-26-2018
0.50
New tail number location
Details
06-13-2018
0.50
Passenger Headrest is a muffler?
Details
05-12-2018
0.00
New DATA plate and a kick ass compressor
Details
05-09-2018
5.00
The big MOVE!
Details
05-08-2018
0.00
All the little things 2
Details
05-08-2018
5.00
All the little things
Details
05-03-2018
0.00
The big move begins
Details
01-21-2018
1.00
She flipped!
Details
01-15-2018
1.00
Roll over jigs assembled
Details
01-13-2018
1.00
Getting ready for flip #2
Details
10-29-2015
1.50
Heaters installed and ready for flight testing
Details
10-29-2015
3.00
Heater wire routing continues
Details
10-28-2015
2.00
Cabin Heat wires get run
Details
10-27-2015
1.00
Cabin Heat wiring begins
Details
10-25-2015
0.50
Heater testing begins
Details
10-16-2015
0.00
The coolest HOT update so far
Details
10-14-2015
1.00
New Canopy seal and avionics cover install
Details
10-06-2015
0.50
The Map Box is complete
Details
10-04-2015
1.50
Box filler and sanding and final fit
Details
10-03-2015
0.00
Box Door fit and install 2
Details
10-03-2015
2.50
Box Door fit and install
Details
10-02-2015
3.00
The Box continues
Details
09-30-2015
2.00
Time to build the box
Details
09-29-2015
1.00
The glove box begins
Details
01-29-2015
2.00
The FAA couldn't stump me!
Details
12-06-2014
1.50
Legal Docs
Details
12-04-2014
0.00
N316NM is airworthy 2
Details
12-04-2014
2.00
N316NM is airworthy
Details
05-17-2014
2.00
FLIPPIN the BIRD!
Details
05-12-2014
1.00
spar support pallets
Details
05-10-2014
1.00
props for Flipping the bird
Details
SITE NAVIGATION
Contact Builder
Long Ez Home
Category
# Logs
# Hours
All
2163
5429
Airframe Tweaking
4
6
Avionics
89
262
Canard
44
65
Canopy
94
226
Control System
95
279
Cowling
129
363
Electrical System
36
102
Elevators
5
15
Engine
421
934
Finishing
561
1584
Firewall
32
92
FLIGHT TESTING
41
58
Fuel system
24
48
Fuse Exterior
11
16
Fuselage
126
246
Instrument Panel
4
15
Landing Brake
14
21
Main Landing Gear
64
162
Miscellaneous
31
43
Nose and Nose gear
111
236
Plans
2
43
Prop
26
32
Scheduled Maintenanc
2
3
Seat Belts
2
3
Shop Supplies
18
57
Spar
19
41
Strakes
73
228
The Beginning
1
The Shop
18
57
Throttle
3
8
Weight and Balance
6
10
Winglets and Rudders
16
44
Wings
41
130
Copyright © 2001-2024 Matronics. All Rights Reserved.