Powered By Kitlog Pro v2.0
TODD'S WEB SITE
RV-10
Empennage Attach
Work Logs Found:
13
Category Work Time:
24 Hours
Date
Hours
Work Log Summary
Details
09-15-2008
1.00
Rudder adjust & elevator pushrod install
Details
09-14-2008
4.00
Attached HS, Elevators, VS, and rudder
Details
09-12-2008
2.00
Match drilling the elevator horns
Details
09-11-2008
2.00
HS mounted to work table
Details
09-10-2008
1.00
Elevator push rod assembly
Details
09-09-2008
2.00
Primed the elevator push rod and rod ends
Details
09-07-2008
1.00
Push rod priming prep
Details
09-06-2008
2.00
Drilling the elevator push rods
Details
09-05-2008
2.00
Elevator push rod fabrication
Details
09-03-2008
2.00
Assembled trim tab servo components
Details
09-02-2008
1.50
Drilled and CSK'd servo spacer
Details
08-30-2008
0.50
Drilled servo link and bell brank
Details
08-29-2008
3.00
Fabricated trim cable and bellcrank brackets
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
481
732
Avionics
9
9
Cowling
16
16
Electrical
1
1
Elevators
46
83
Empennage
4
5
Empennage Attach
13
24
Engine
19
19
Fuselage
131
131
Horiztontal Stab
38
82
Inventory
2
4
Miscellaneous
2
2
Prop
5
5
Rudder
14
24
Tailcone
63
140
Vertical Stab
14
35
Wings
104
152
Copyright © 2001-2025 Matronics. All Rights Reserved.