KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  3-14-2011
Number of Hours:  1.00
Manual Reference:  SNX-E01
Brief Description:  Backup Battery Install

Drilled the backup battery box for the piano hinge halves that will hold it to the fuselage.

Riveted the hinge halves to the box. Positioned the box in the fuselage, drilled, and riveted the associated other halves of the hinge pins.

Bent the piano wire in an L-shape to hold the halves together and installed.

Made up a harness; crimped end terminals on. Rats I just realized I forgot to wire it into the switch that switches the backup battery in and out of the circuit.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.