KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
Work Logs Found: 723
Category Work Time: 1390 Hours
 Date
Hours
Work Log Summary

Details

 11-17-2012
0.00
Flight Test Mid-Point
Details

 06-25-2012
0.20
First Flight
Details
       

 06-14-2012
0.00
Status Update
Details

 06-03-2012
2.30
Final Control Surfaces Rigging
Details

 05-31-2012
1.80
Finessed the control interference; compass card; c
Details
       

 05-24-2012
1.50
Rigged Control Surfaces; Mod'd seat pan
Details
     

 05-14-2012
2.30
Control Surfaces
Details

 05-07-2012
1.50
Install Wings. Kinda.
Details
     

 05-05-2012
3.20
Polishing
Details

 05-02-2012
0.00
Finished Move
Details
     

 04-30-2012
0.00
Moving Day!
Details
       

 04-28-2012
1.50
Seat Pan Install / Upholstery Install / Fire Extin
Details
       

 04-26-2012
2.30
Left Applique / Compound Aileron Tips & Horiz Tail
Details
       

 04-04-2012
1.50
Install Right Side Applique / Rivet Wingtips
Details
       

 04-02-2012
2.30
Prep R Fuselage for Wrap
Details
       

 03-25-2012
1.00
Wingtip Install
Details
       

 03-24-2012
3.00
More Wing Polishing
Details
       

 03-19-2012
2.00
Rivet Aft Lower Skin
Details

 03-13-2012
1.80
Swinging the Compass
Details
       

 02-29-2012
1.80
Gear Fairings / Fuel Placards / Spar Tunnel Rivets
Details

 02-28-2012
1.50
Wheel Pants / Leg Fairing Install
Details
       

 02-26-2012
1.50
Buffing Tail Tips / Cowl Re-Fit / Cowl Southco's
Details
       

 02-23-2012
2.00
Temp Floor / Cowl Work
Details
       

 02-20-2012
1.50
Initial Polish Right Aileron / Tail Paint
Details
     

 02-15-2012
1.30
Polish Underside of Left Horiz Stab
Details
       

 02-14-2012
1.50
Polished Upper Surface Left Horizontal Stab
Details

 02-10-2012
0.50
waxing & sanding
Details
       

 02-09-2012
3.00
Buffing, Painting, Buffing, Repairing, Repainting
Details
       

 02-08-2012
1.00
Sanding
Details

 02-07-2012
1.00
Buffing & Sanding
Details
     

 02-06-2012
1.50
Sanding, Painting, Brakes
Details
     

 02-04-2012
2.00
Compounding Fiberglass Parts
Details

 02-03-2012
1.00
Painted right horizontal tail tip
Details

 02-02-2012
1.80
Polished Right Horizontal Stab
Details
       

 02-01-2012
1.00
Cowl Paint, N-Numbers, Vertical Tip Paint
Details
       

 01-31-2012
2.00
More Painting
Details
       

 01-20-2012
2.00
Sanding / Rod End Bearings / More Sanding
Details

 01-16-2012
2.00
Placards / Canopy Cable / Painting Turtledeck Form
Details
       

 01-15-2012
1.00
Sanding / Splice Bolts
Details

 01-14-2012
2.50
Paintin' and a Polishin'
Details
       

 01-13-2012
1.20
Painting
Details
       

 01-11-2012
3.00
Wheelpant Paint / Tail Gear Bolt / Builder Plate /
Details
       

 01-10-2012
1.80
Correct Rudder Cable Routing
Details
       

 01-07-2012
2.00
Painting Wingtips / Polishing Left Flap
Details
     

 01-04-2012
1.00
Sand/Prime Right Wingtip / Sand color-coat wheelpa
Details

 01-01-2012
1.30
Rudder Cable / Wingtip
Details
     

 12-31-2011
2.90
Cowl / Wingtip Prime; Lower Skin Issues
Details
       

 12-30-2011
4.00
More Putty & Sanding
Details

 12-28-2011
2.60
Sanding work / finished polishing lower aft skin
Details

 12-26-2011
1.00
Flight Manual Prep
Details

 12-20-2011
1.60
Wingtips / Placards / Comm Antenna
Details

 12-18-2011
1.40
Polish Lower Aft Skin
Details
     

 12-17-2011
0.70
Mixed Day Painting
Details
       

 12-16-2011
2.30
Final Color Coat Wingtips / Sand & Prime Wheelpant
Details
       

 12-13-2011
1.50
Wingtip Paint / Wheelpant Seams
Details

 12-12-2011
1.50
Final HW / New Putty
Details

 12-10-2011
2.80
Paint / Putty / Engine Tidy / Cowl Hinge Pins
Details
       

 12-08-2011
4.50
Updrilled Wingtips / Wheelpant Reinforced / Wing D
Details
       

 12-07-2011
1.70
Install Windshield / Paint Wingtips / Secure Wires
Details
       

 12-05-2011
2.00
Finish Glareshield Cover / Install Windshield
Details
       

 12-04-2011
0.80
Initial Glareshield Cover Fit
Details
       

 12-03-2011
4.20
WS Bow / Battery / Rivet Panel
Details
       

 11-30-2011
3.30
Paint Wingtips / 2nd Engine Start / Bungee / Paint
Details
       

 11-29-2011
1.50
Painted Wingtips / Cleanup / Misc
Details

 11-28-2011
1.80
Finish Wing Wiring / Trim Doubler
Details
       

 11-25-2011
4.00
Wingtip Wiring
Details
       

 11-24-2011
1.30
Wiring the wings
Details

 11-22-2011
2.00
Panel Finished
Details

 11-14-2011
3.00
Continued Behind-Panel Cleanup
Details

 11-11-2011
3.70
Panel Tidy-Up / Fuselage Wiring
Details
       

 10-27-2011
1.60
Tech Counselor Visit / Panel Work
Details

 10-25-2011
2.30
Panel Tidying
Details

 10-23-2011
1.40
Panel Cleanup
Details

 10-21-2011
1.50
First Engine Start!
Details
       

 10-19-2011
1.20
Fuel Tank Calibration
Details

 10-14-2011
1.50
Crank Engine / Seat Belts
Details

 10-13-2011
1.00
Enigma Calibration
Details

 10-11-2011
1.30
Trial Fit of Panel / Comm Check
Details
       

 10-04-2011
1.10
Prep for 2nd Power-On
Details

 10-03-2011
2.90
Coax / Elevator Rod / Bushings
Details
       

 10-01-2011
2.50
Coax Run / Torque Prop
Details

 09-29-2011
2.70
Install Control Frame / Mount Propellor
Details
       

 09-27-2011
2.50
Elevator Control Linkage / Trim Lever-Cable
Details
       

 09-26-2011
3.70
Spar Tunnel Riveting / Control Rod prep
Details

 09-23-2011
2.00
Spar Tunnel Riveting
Details
       

 09-21-2011
2.00
Brake Cable Routing / Seat Belts
Details
       

 09-19-2011
3.50
More riveting; brake cable; seat belts
Details
     

 09-17-2011
3.00
Frustrating, Wasted Day
Details
     

 09-15-2011
2.70
Aft Spart Tunnel; Flap Control Rod; Brake Cable
Details
       

 09-12-2011
0.80
Rivet Swap / Misc Cleanup
Details
       

 09-10-2011
6.00
Re-Rigging the Wings
Details
       

 09-08-2011
1.60
First Polish Attempt
Details
       

 08-28-2011
0.00
Part II - Re-drill Wing Attach Blocks
Details
       

 08-28-2011
2.30
Part I - Re-drill Wing Attach Blocks
Details
       

 08-26-2011
1.80
Wing Doubler Trim / Gear Bolt / Exhaust Hangar
Details

 08-25-2011
4.30
Drill / Tap Mount for Wheel Pants
Details
       

 08-23-2011
1.80
Finish (?) Gear Leg Fairings
Details
       

 08-21-2011
1.50
Hinge Work - Main Gear Leg Fairings
Details

 08-20-2011
2.00
Cut / drill wheelpants; trim leg fairings & hinges
Details
       

 08-19-2011
1.50
Light Pods / Wheel Pants
Details
       

 08-17-2011
3.00
Trial fit strobe / nav / position light pods
Details
       

 08-15-2011
0.60
Install Aft Exhaust Support
Details
       

 08-14-2011
3.20
Baffle tweak, Exhaust shield, exh springs
Details
       

 08-13-2011
2.30
Finished Baffles
Details
       

 08-12-2011
4.20
Install Baffle Seals
Details
       

 08-09-2011
2.30
Baffle Seal Retention Strips
Details

 08-07-2011
1.30
Baffle Retention Strips
Details

 08-06-2011
2.20
More Baffle Work
Details
     

 08-05-2011
2.50
Rivet Baffles / Trim Baffles for Cowl
Details
       

 08-04-2011
2.30
Baffling Drill / Cleco
Details
       

 07-20-2011
1.80
Engine Baffle Work
Details

 07-18-2011
3.20
Engine Baffles
Details
       

 07-16-2011
2.20
Misc Measuring
Details

 07-14-2011
1.80
Wiring PTT / Freq Swtiches
Details
       

 07-13-2011
2.80
Wing Attach Block, Wiring, Air Filter
Details
       

 07-08-2011
1.40
Complete Refit of Aft Wing Attach Angles
Details

 07-07-2011
1.70
Finish-up of aft wing attach angles
Details
       

 06-28-2011
1.80
Attach Angle Re-Fit
Details

 06-19-2011
3.20
Finish Cowl
Details

 06-17-2011
1.30
Re-Set Air Cleaner / Cowl Clearance
Details

 06-16-2011
0.80
Air Filter Mods for Cowl
Details
       

 06-15-2011
1.10
Cowl / Air Filter Trim
Details
       

 06-13-2011
1.00
Adjusting Intake Manifold
Details
       

 06-12-2011
2.50
Cowl Finish-Up
Details
       

 06-11-2011
3.50
Aft Spar Carrythrough Riveting & Cowl Fasteners
Details
       

 06-08-2011
1.10
Re-Make Wing Block
Details

 06-04-2011
7.30
Wing Rigging
Details
       

 06-04-2011
1.80
Marking wing doubler
Details
       

 06-02-2011
1.00
Prep for Rigging
Details

 06-01-2011
0.30
Cleaning Wings fo Rigging
Details

 05-31-2011
1.20
Pre-Wing Rigging
Details
       

 05-30-2011
2.50
Cowl Details
Details

 05-25-2011
0.70
Cowl Markup for Fuel Filler / Windshield Trimming
Details
       

 05-22-2011
1.50
Riveting Cowl Hinges / Dimple & Rivet Fuel Door
Details
       

 05-21-2011
2.30
Updrilling / Countersinking Cowl Hinge Rivet holes
Details

 05-19-2011
0.30
Cowl positioning
Details

 05-18-2011
1.30
Cooling Openings & Fuel Filler Door
Details
       

 05-15-2011
3.10
Final Cowl Fitting
Details
       

 05-13-2011
2.00
Cowl Centerline Hinge Drilling
Details
       

 05-11-2011
1.00
Cowl Halves Alignment / Taping for Drilling
Details
       

 05-07-2011
2.50
Cowl Trim / cut fuel filler & oil cooler access
Details
       

 05-05-2011
1.00
Final (?) cowl trim
Details
       

 05-04-2011
0.80
More cowl trimming
Details

 04-28-2011
0.70
Planning / Re-Aligning
Details
     

 04-27-2011
1.60
Finish Cowl Centerline Trimming
Details

 04-26-2011
0.90
More Cowl Trim
Details

 04-22-2011
1.80
More Filing on the Cowl
Details
     

 04-11-2011
1.00
Fitting Left Cowl
Details
       

 04-10-2011
1.30
Drill Hinge Half Right Cowl / Drill Hinge Left Cow
Details

 04-09-2011
2.90
Right Side Cowl Centerline Trimming
Details
       

 04-07-2011
0.80
Cleco'ing Side Hinge on Right Cowl
Details
     

 04-04-2011
0.70
Right Side Cowling test
Details

 04-03-2011
1.40
Left Side Cowl Trimming
Details

 03-28-2011
1.00
Left Side Cowl Initial Fitting
Details

 03-27-2011
3.50
Cowling Trim, Hinge Fab, Xpndr BNC
Details
     

 03-23-2011
1.20
Cowl Fitting, Day 2
Details
       

 03-22-2011
3.00
Cowl Trimming
Details

 03-19-2011
3.30
Panel Cleanup
Details
       

 03-18-2011
0.00
Plans Update Day
Details

 03-16-2011
1.60
Backup Batt Wiring / Cowl Trim & Initial Fit
Details
       

 03-14-2011
1.00
Backup Battery Install
Details

 03-12-2011
4.00
IT'S ALIIIIIVE....
Details
       

 03-10-2011
1.30
More Wiring
Details

 03-09-2011
0.50
More Panel Wiring
Details

 03-03-2011
1.00
Continue Wiring Panel to Fuselage
Details

 03-02-2011
0.90
Start Panel-to-Airframe Wiring
Details
     

 02-27-2011
3.10
Finish FWF Wiring / Install Oil Breather Tube / Re
Details
       

 02-26-2011
4.20
Oil Breather Tube / Routing EGT/CHT
Details
       

 02-24-2011
1.30
Engine FWF Wiring
Details

 02-22-2011
0.60
Install Exhaust Flange Gaskets
Details

 02-21-2011
0.70
Engine wiring / crankcase vent
Details

 02-20-2011
1.50
Exhaust Pipe Trimming
Details
       

 02-19-2011
2.50
EGT Finish / Lower Plugs / Fuel Sensor
Details
     

 02-17-2011
1.40
EGT & R/F Baffle
Details
       

 02-16-2011
1.00
Running Upper Plug Wires
Details
       

 02-14-2011
1.00
Sensor wiring
Details

 02-13-2011
2.00
Harness Tidy Up
Details
       

 02-09-2011
1.00
Upper Mag Wiring / Battery Cable Fab
Details
       

 02-07-2011
1.40
More FWF Wiring
Details

 02-05-2011
2.50
Finished Panel Wiring (Standalone)
Details
       

 02-04-2011
2.50
Panel Wiring
Details
       

 01-30-2011
2.00
More Engine Wiring
Details

 01-29-2011
3.50
Engine Wiring
Details
       

 01-27-2011
1.50
Wire Electronic Ignition Coils
Details
     

 01-26-2011
0.80
Electrical Work FWF
Details

 01-25-2011
1.30
Oil Cooler Installation Complete
Details
       

 01-23-2011
4.00
Oil cooler baffling
Details
       

 01-21-2011
2.50
Ground wires, oil cooler baffle, battery wires
Details
       

 01-20-2011
0.60
Fuel System & Carb Wrap-up
Details
       

 01-20-2011
0.60
Finish Firesleev-ing Fuel & Oil Lines
Details
       

 01-19-2011
0.70
Cut oil lines / cut firesleeve / dip firesleeve
Details

 01-17-2011
0.70
Firesleeve Dip & Oil Line Fittings
Details
       

 01-16-2011
1.20
Mixture Cable & Fuel Line
Details
     

 01-15-2011
1.50
misc engine
Details

 01-13-2011
1.00
Exhaust Trial / Trimming Case Boss
Details
       

 01-12-2011
1.00
Oil Cooler Baffle
Details

 01-10-2011
1.20
Timing Check & Throttle Cable Checkout
Details
       

 01-09-2011
1.00
Intake & Carb fitting
Details
       

 01-09-2011
2.20
Completion of Aft Fence Baffle
Details
       

 01-07-2011
2.40
Aft Fence Baffle Trimming
Details
       

 01-04-2011
1.00
Fence Baffles & Exhaust Header
Details
     

 01-03-2011
1.00
Initial Checkout of Fence Baffles
Details
     

 01-01-2011
3.50
Intake Work / Carb Drilling
Details
       

 12-31-2010
2.50
Hanging the Engine
Details
       

 12-30-2010
2.50
Engine detail finish
Details
     

 12-27-2010
1.00
Install Secondary Ignition Trigger & Alt Stator
Details
     

 12-26-2010
2.90
Torque Gland Nut / SuperTin / Mags
Details
       

 12-19-2010
1.50
More Panel Work
Details
     

 12-18-2010
2.00
Panel Population
Details
     

 12-14-2010
0.90
Backup Battery Restraint
Details
       

 12-12-2010
2.70
Engine Work / Panel Work / H-Phone Jacks
Details
       

 12-09-2010
0.70
prop bushings / oil pump
Details
       

 12-08-2010
1.10
Oil Pump Checkout / Prop Bushings
Details
     

 12-05-2010
2.00
Labeled Panel
Details
       

 12-04-2010
3.20
Pushrods
Details
     

 12-01-2010
1.20
Pushrod Length Calculation
Details

 11-23-2010
0.60
Set up right rocker assy
Details

 11-22-2010
0.70
Rocker Arm Alignment
Details
     

 11-21-2010
3.00
Install Left Head / Cover Plates / Oil Sump
Details
       

 11-20-2010
6.10
Mate Case / Install Cylinders / Install R Head
Details
       

 11-17-2010
0.60
Engine Mate Prep
Details
     

 11-14-2010
2.30
Crank / Cam Install / Set End-Play
Details
     

 11-13-2010
1.10
Failed Attempt at Panel Labelling
Details

 11-12-2010
2.00
Rods / Cam Bearings / Studs
Details
       

 11-10-2010
1.10
Connecting Rods / Flywheel
Details
       

 11-07-2010
1.00
General Prep Work
Details

 11-05-2010
0.50
Finished Engine Paint
Details

 11-04-2010
0.70
Painted Case, Torqued Assy's
Details

 11-03-2010
1.10
Engine Case Masking
Details
     

 11-02-2010
0.80
Masking-off Engine Case for Painting
Details

 10-31-2010
2.00
Case Prep / Crankshaft Finish
Details

 10-30-2010
1.50
Prop Hub Installation
Details
     

 10-29-2010
2.30
Crankshaft preparation
Details

 10-27-2010
1.50
Crankshaft Prep / Bend Ldg Gear Legs
Details
       

 10-23-2010
6.00
Wing Mod / Secure ELT Ant / Fab Gear Fairings
Details
       

 10-17-2010
3.50
Wing Tip / Panel Labels / AHRS Mount
Details
       

 10-16-2010
3.00
Misc & Install Wing Tip
Details
     

 10-13-2010
1.20
Finish Aileron Balance
Details

 10-11-2010
1.00
Finish Ailerons
Details
       

 10-03-2010
3.50
Engine Prep & Rework Battery Box
Details
     

 10-02-2010
3.80
Minor Wiring / Master Relay Install
Details
       

 09-29-2010
1.40
Windshield Work / Panel Prep
Details

 09-27-2010
1.10
Final Install of Canopy
Details
       

 09-26-2010
2.00
Canopy Transparency Deburr & Lock Plate Install
Details

 09-23-2010
1.00
Countersink canopy screw holes
Details
       

 09-22-2010
1.10
Tap Canopy Frame
Details

 09-20-2010
3.50
Completion of Canopy Fit
Details
     

 09-19-2010
2.00
Canopy Adjustments
Details

 09-18-2010
4.30
Drilling / Mounting of Canopy Transparency
Details
       

 09-17-2010
4.50
Finish Canopy Frame
Details
       

 09-15-2010
1.60
Riveting Aft Canopy Bow
Details

 09-13-2010
1.40
Fitting of Canopy Cross-Bow
Details
       

 09-12-2010
3.00
Canopy Frame, Xpndr Antenna, AHRS Mounting
Details
       

 09-11-2010
1.50
Installation of tail fairings
Details
       

 09-09-2010
1.50
Install Rudder Cable Fairings / Fab AHRS Mount
Details
       

 09-06-2010
1.50
Fabricate Rudder Cable Fairings
Details
     

 09-01-2010
1.20
Install Trim Tab Actuator Cable / Drill Sticks
Details
       

 08-31-2010
1.30
Install Comm Antenna & Install Trim Tab Cable Hous
Details

 08-29-2010
2.10
Antennas, Compass
Details
       

 08-28-2010
3.00
Antenna Installation / Mike & H/phone jack
Details

 08-26-2010
1.30
Install ELT Mount
Details
     

 08-25-2010
1.10
Fabricate ELT Shelf
Details
     

 08-24-2010
1.30
ELT Mount
Details
       

 08-23-2010
0.50
Panel Repaint
Details

 08-20-2010
3.50
Cutting the canopy
Details
       

 08-18-2010
2.00
Finish Fuselage Vents / Swap Brake Drums
Details
       

 08-17-2010
0.60
Up-drill / deburr vents
Details

 08-16-2010
1.20
Cut Fuselage Vent Holes
Details
     

 08-13-2010
1.50
Make Door Template / Locate vent frame
Details
       

 08-12-2010
1.70
Prep Van's RV-10 Vents
Details
       

 08-09-2010
1.50
Paint Panel, Add Locating Lug (Canopy), Final fitt
Details
     

 08-08-2010
1.50
RePaint Panel; Added Speed Nuts for ELT Remote
Details

 08-07-2010
3.00
Finished Panel Prep
Details
     

 08-06-2010
1.80
Cut Hole / Position Enigma EFIS
Details
     

 08-04-2010
2.10
Cut Panel for Comm / Xpnder
Details
     

 08-03-2010
1.20
Determining Panel Cutouts for MicroAir Radios
Details
       

 08-01-2010
0.60
Rework Canopy Latch Rail
Details

 07-22-2010
0.80
Initial Placement of Canopy Transparency
Details

 07-21-2010
0.80
Aft Canopy Bow Fitting
Details
     

 07-20-2010
0.70
Fit Rear Canopy Bow
Details

 07-19-2010
1.00
Canopy Bow Angle Drilling
Details

 07-18-2010
2.50
Right Side Canopy Side Hinge Rivet / Drill Bow Ang
Details
       

 07-14-2010
0.90
Canopy Hinge
Details
     

 07-09-2010
1.50
Fwd Canopy Bow Adjustment
Details
       

 07-07-2010
1.00
Canopy Handle Latch & End-Angles
Details
       

 07-01-2010
0.80
Canopy Latch Handle Assembly
Details
     

 06-29-2010
1.00
Parts Prep for Canopy
Details

 06-28-2010
1.80
Canopy Parts Fab
Details
     

 06-27-2010
0.80
Cut Down the Workbench
Details
       

 06-25-2010
5.10
She's Got Legs!
Details
       

 06-24-2010
0.00
Tech Counselor Visit
Details

 06-23-2010
1.70
Brake Cable Guides
Details
       

 06-22-2010
1.30
Wheel Work
Details
       

 06-21-2010
0.80
Trim Brake Shoe Cams
Details
       

 06-20-2010
3.70
Rig Main Gear Axles
Details
       

 06-17-2010
0.80
Finished Panel Design
Details
     

 06-16-2010
1.10
More Panel Markup
Details

 06-14-2010
1.30
Panel Layout
Details

 06-13-2010
4.00
Adding Nutplates / Paint Glareshield / Mod Instrum
Details
       

 06-12-2010
5.30
Final Fitting of Windscreen
Details
       

 06-10-2010
0.50
Trimming Front Edge of Windscreen
Details

 06-09-2010
1.20
Drilling Lexan / Dimpling Holes / Marking Fwd Edge
Details
       

 06-07-2010
0.80
More Windscreen Trimming
Details
       

 06-06-2010
0.90
Windshield Trim
Details

 06-03-2010
0.70
Final sizing of windshield bow / drilling bow
Details
       

 05-26-2010
0.80
Initial Windscreen Fitting
Details
     

 05-25-2010
1.00
Motor Mount / Windshield
Details

 05-24-2010
1.10
Install Tailwheel / Motor Mount Lower Bolts
Details
     

 05-23-2010
3.00
W/Shield Bow, Motor Mount, Tailwheel, Tank Stops
Details

 05-21-2010
2.20
Upper Firewall Install / Fuel Tank Vent Install
Details
       

 05-20-2010
1.20
Fwd Fuel Tank Strap Install / Vent Hole in Upper F
Details
       

 05-15-2010
2.50
Install Fuel Tank
Details
     

 05-14-2010
4.00
Glareshield / Fuel Tank Final Adjustments
Details

 05-13-2010
0.80
Adjust Rudder Pedal
Details
     

 05-06-2010
0.80
Add Felt to Tank & Tank Straps
Details

 05-05-2010
0.30
Re-Flared Fuel Line
Details

 05-04-2010
1.00
Trial Fit Gas Tank / Felt Lining
Details

 05-02-2010
2.70
Gas Tank Prep for Installation / Tank Straps
Details
       

 05-01-2010
4.00
Gascolator Support / Firewall Prep
Details
       

 04-29-2010
2.00
Gascolator Reinforcement, Part II
Details
     

 04-28-2010
1.10
Firewall / Gascolator Stiffening
Details
       

 04-25-2010
4.30
Finish Tail / Rig Rudder Cables
Details
       

 04-24-2010
3.70
Install Elevator Rod / Install Rudder Cables
Details
       

 04-23-2010
0.80
File some more / Rivet Lower Rudder Hinge
Details

 04-22-2010
0.80
Drill Lower Rudder Hinge / File Control Horn
Details

 04-21-2010
0.70
Finish Vert Stab Hardware
Details

 04-19-2010
1.30
Re-Mount Tail Wheel Mount
Details
       

 04-18-2010
2.40
Tail HW / File Stop Plate / Work Elevator Bushing
Details
       

 04-16-2010
0.80
Rudder Installation, cont'd
Details

 04-14-2010
0.70
Rudder Installation Work
Details

 04-11-2010
4.10
Misc Tail Work
Details
       

 04-08-2010
1.10
Fitting Tail Fairings
Details
     

 04-07-2010
1.00
Initial Fab Tail Fairings
Details
     

 04-03-2010
2.00
Permanent Install of Vertical Stab
Details
       

 03-28-2010
2.80
Final Tail Trimming
Details
       

 03-27-2010
2.30
Vert Stab Trimming
Details

 03-23-2010
1.00
Drill Vertical Stab Mount
Details

 03-21-2010
2.30
Tail / Rudder Stops / RDAC Mount
Details
       

 03-20-2010
1.80
Vertical Tail Fitting, Part II
Details
       

 03-17-2010
1.00
Vertical Stab Initial Fitting
Details
       

 03-14-2010
1.00
Mount Horiz Stab
Details
     

 03-08-2010
1.00
Horiz Stab Prep for Rigging
Details
       

 03-02-2010
1.00
Evaluating Fuel Tank Fit
Details

 02-21-2010
3.50
Initial Tail Fitting
Details
       

 02-17-2010
0.90
clean up / prep
Details
     

 02-13-2010
3.00
glareshield / fuel tank / fuel line
Details
       

 02-12-2010
1.80
Rivet Battery Box / Deburr Glareshield
Details

 02-06-2010
2.80
Firewall Work
Details
       

 02-03-2010
1.50
Wiring / Gascolator / Tank
Details

 01-31-2010
2.30
Fuel Line / Air-Oil Separator
Details
       

 01-26-2010
0.80
Misc Items
Details

 01-25-2010
1.40
Fuel Line Placement / Brake Cables / Gascolator /
Details
       

 01-22-2010
1.00
Ground Buss / Thread Cleanup
Details

 01-20-2010
1.00
Finished Battery Box
Details
     

 01-17-2010
2.00
Battery Box, continued
Details
     

 01-16-2010
2.00
Battery Box Bend & Install
Details
       

 01-14-2010
1.30
Battery Box Layout / Cutting
Details
     

 01-10-2010
3.50
Wiring / Brake Cables / Battery Box
Details

 01-09-2010
3.00
Wiring / Throttle Quadrant
Details
     

 01-08-2010
1.00
Mount second coil
Details

 01-06-2010
1.10
Fix Gascolator / Add nutplates for 1 coil
Details

 01-05-2010
1.10
Mount Ignition Coils
Details
     

 01-04-2010
1.30
Drill Mount for Gascolator / Mount Volt Regulator
Details
       

 01-02-2010
2.60
Gascolator
Details
     

 01-01-2010
3.20
Wiring Analysis & Design
Details

 12-30-2009
1.30
Gas Tank Cleanup
Details
       

 12-29-2009
1.00
Prep for wiring
Details

 12-22-2009
1.50
Brake Block / Control Idler / Panel CrossTie
Details

 12-20-2009
2.30
Finished SNX-C05 - Controls Assy
Details
     

 12-15-2009
1.10
Control Stick Assy / Rudder & Tail checkout
Details

 12-13-2009
3.20
Finish Rudder Pedals & Flap Handle
Details
       

 12-12-2009
2.80
Rudder Pedals
Details
       

 12-11-2009
1.70
Finish Brake Handle
Details
       

 12-08-2009
1.40
Rudder Pedal Phenolic Blocks
Details
       

 12-06-2009
3.40
Flap Tube Fitting / Brake Lever Assy
Details
       

 12-05-2009
0.80
Brake CableRestraint / Brake Cable Bracket
Details

 12-03-2009
3.50
Finished SNX-F06 / Glareshield
Details
       

 12-02-2009
4.00
Glarehield / firewall attach angles
Details
       

 12-01-2009
2.20
Panel Location / Pilot Drill / Glareshield Pilot D
Details
       

 11-28-2009
4.40
Panel / Cross Member / Glareshield
Details

 11-23-2009
1.00
Cutting Glareshield Angle / Bend Panel Mounts
Details
     

 11-22-2009
2.00
Cutting Glareshield / Detail parts
Details
       

 11-21-2009
6.50
Finished SNX-F08
Details
       

 11-19-2009
1.10
Seat Back Hinge Placement
Details
     

 11-15-2009
1.00
Flip Fuse / Install Seat
Details
       

 11-12-2009
2.00
Add Piano Hinge to Seat Sling Panel
Details
     

 11-09-2009
0.80
Seat Pan Hinge Locating
Details

 11-08-2009
2.40
Seat Pan Fabrication / Bending
Details
       

 11-07-2009
2.50
Seat Pan Markup / Rough Cuts
Details
     

 11-05-2009
0.70
Spar Carry Thru / Misc
Details

 11-04-2009
0.80
Finished UpDrilling c/sinking mount
Details

 11-03-2009
1.00
Up-drill / c-sink mount hardware
Details
       

 11-01-2009
2.40
Rear Spar Carry-Thru
Details
       

 10-31-2009
4.50
Drilling Titanium Gear Legs / Tailwheel Subassembl
Details
       

 10-30-2009
1.50
Tailwheel Caster Pivot Point
Details
     

 10-27-2009
1.00
Tailwheel Mount
Details

 10-26-2009
1.50
Motor Mount Drilling / Spar Carry Thru Hole
Details
       

 10-21-2009
0.80
Drill Motor Mount
Details

 10-19-2009
1.20
Motor Mount Shims
Details
       

 10-14-2009
0.70
Engine Mount Trimming
Details

 10-11-2009
3.00
Rear Spar Channel Details
Details
     

 10-10-2009
1.50
Motor Mount Tribulations
Details
       

 10-07-2009
0.70
Fabricate SNX-F08-12 Trim Cable Angle
Details

 10-05-2009
0.60
Cut Hinge Sections for Seat
Details

 10-03-2009
4.90
Finish Aft Lower Cabin Details
Details
       

 10-02-2009
5.80
Finalizing Location of Aft Lower Cabin Sub Assys
Details
     

 09-30-2009
1.00
Aft Cabin Center Supports
Details
       

 09-29-2009
0.80
Aft Cabin Details
Details
     

 09-28-2009
1.60
Seat Belt Attach Assy Installation
Details
       

 09-26-2009
3.50
Aft Lower Cabin Details
Details
       

 09-24-2009
0.50
Drill Angle Hinge / Finish SNX-F10
Details

 09-23-2009
1.20
SubAssembly Construction
Details
     

 09-22-2009
0.70
Assemble Elevator Idler Assy
Details
     

 09-20-2009
2.70
Detail parts for aft portion of fwd fuse
Details
     

 09-19-2009
1.60
Fwd Fuse Detail Parts
Details
     

 09-18-2009
0.80
More under seat parts fab
Details

 09-17-2009
1.50
Lowered Seat Parts Detail
Details
       

 09-16-2009
1.00
Engine Arrival / Inventory
Details
       

 09-14-2009
1.00
Initial Parts Collection / Cutting Stock
Details

 09-12-2009
7.00
Finished SNX-F11 / Fwd Part of Fwd Fuse
Details
       

 09-10-2009
1.00
Finish Deburr / Reassembly
Details

 09-09-2009
1.10
Deburr Lwr Fwd Fuse Skin, Right Fwd Fuse Panel
Details

 09-08-2009
4.10
Major Assy Up-Drill / Deburr
Details

 09-01-2009
0.80
Misc Corrections / Deburr / Countersink
Details

 08-31-2009
1.30
Up-Drill Fuselage Splice Plates
Details

 08-29-2009
4.30
General UpDrill / Deburr Fwd Fuselage
Details

 08-26-2009
1.00
Updrill & Deburr
Details

 08-25-2009
1.00
Up-Drill Firewall / Install Gussets
Details

 08-24-2009
0.90
Locate / Pilot Drill Floor Stiffener & Gusset
Details
       

 08-22-2009
4.00
Continued Fwd Fuse Subassemblies
Details
       

 08-21-2009
2.50
Lower Firewall Install
Details
       

 08-16-2009
3.50
Drill Splice Plates / Fit Tunnel Zee
Details
       

 08-15-2009
2.20
Fwd Fuse Misc Details
Details

 08-13-2009
0.00
Misc Study of Fwd Fuse Mate
Details

 08-12-2009
1.00
Located / Pilot Drilled Lower Fwd Skin
Details
     

 08-10-2009
2.00
Initial Fuselage Mate
Details
       

 08-09-2009
3.80
Completed SNX-F16 / Tunnel Zee
Details
       

 08-08-2009
2.50
Tunnel Zee / Clip Fabrication
Details
       

 08-07-2009
0.50
Align Aft Tunnel Zee
Details
     

 08-05-2009
2.00
Aft Tunnel Zee Details
Details

 08-04-2009
1.30
Aft Tunnel Zee
Details

 08-03-2009
0.80
Finished SNX-F17
Details

 08-02-2009
2.40
Detail Parts for Fwd Fuse Assy
Details
       

 07-20-2009
1.20
Rivet Fuel Filler to Upper Firewall
Details
       

 07-19-2009
3.60
Continued Work on Upper Firewall SubAssy
Details
       

 07-18-2009
2.30
Locate Upper Firewall Southco Retainers, Updrill H
Details
     

 07-17-2009
1.10
PIlot Drill W/S Strap to Upper Firewall Former
Details
       

 07-15-2009
0.60
Form strap to firewall former
Details

 07-13-2009
0.80
Adjust Flutes on Upper Formed Firewall
Details
     

 07-12-2009
2.30
Upper Firewall Detail Parts
Details
     

 07-11-2009
1.20
Completed SNX-F12
Details

 07-10-2009
1.00
Rivet Left Fwd Fuselage
Details
     

 07-09-2009
1.30
Complete Debur Left Fwd Fuse
Details

 07-08-2009
1.30
Deburring Left Fwd Fuselage
Details

 07-07-2009
1.50
Up-Drilled Left Fwd Fuselage
Details

 07-06-2009
0.50
Add Left Fwd Fuse Doubler & Firewall Attach Angles
Details

 06-26-2009
6.00
Riveted Right Side, Located Left Side
Details
       

 06-25-2009
0.80
Build-Up Right Fwd Fuse Skin for Riveting
Details

 06-24-2009
0.70
Completed Prep for Riveting Right Fwd Fuse Skin
Details

 06-23-2009
1.00
Deburr Right Fwd Fuse Skin
Details

 06-22-2009
1.00
Finished Locating Parts - Right Fwd Fuse
Details
     

 06-21-2009
4.20
Continued Continuation of Right Fwd Fuse Parts Bui
Details
       

 06-20-2009
1.20
Continued addition of R fwd fuse parts
Details
       

 06-19-2009
1.30
Parts Placement - Right Fwd Fuselage
Details
       

 06-18-2009
1.30
Start of Right Fwd Fuse BuildUp
Details
     

 06-15-2009
1.00
Add Longeron Doubler Plates
Details
       

 06-14-2009
2.80
Latch Plate Fabrication and Install
Details
     

 06-13-2009
4.00
Finish Up SNX-F14
Details
       

 06-12-2009
1.80
Fwd Fuse Parts
Details
       

 06-11-2009
1.20
Complete SNX-F15
Details
     

 06-10-2009
0.80
Flap Blocks
Details

 06-08-2009
1.50
First Fwd Fuse Parts
Details
     

 06-07-2009
2.50
Wrap-Up of Aft Fuse / Turtledeck
Details
       

 06-05-2009
1.20
Riveting Turtledeck
Details
       

 06-04-2009
1.70
Riveted Internals
Details

 06-03-2009
1.20
Started Riveting
Details

 06-02-2009
1.70
Riveting Prep
Details
     

 05-31-2009
2.00
TurtleDeck Deburr & Reassembly
Details

 05-30-2009
4.00
Disassembly & Deburr TurtleDeck
Details
     

 05-29-2009
6.20
TurtleDeck Initial Fitting Completed
Details
       

 05-23-2009
5.30
TurtleDeck Skin Installation
Details
       

 05-21-2009
0.90
TurtleDeck Detail & SubAssy
Details
       

 05-20-2009
1.90
TurtleDeck Detail Parts
Details
       

 05-18-2009
0.80
Finished SNX-F21
Details

 05-17-2009
5.70
Final Deburr for SNX-F21
Details
       

 05-15-2009
4.30
Rivet Shear Web / Seat Belt Attach / Upper X-Ties
Details
       

 05-13-2009
1.10
Updrill / Deburr parts of lower skin
Details

 05-11-2009
3.00
Aft part of Aft Fuse Riveting
Details
       

 05-09-2009
4.30
Tailwheel Mount / Shear Web Details
Details
       

 05-08-2009
1.70
Tailwheel Mount Structures
Details
     

 05-06-2009
1.50
Upper / Lower Tail Spar Mount Angles
Details
       

 05-04-2009
1.50
Tailwheel Mount Drilling
Details
       

 05-02-2009
2.40
Aft Fuse Detail Subassembly
Details
       

 05-01-2009
3.70
Aft Fuse Cross Ties
Details
       

 04-29-2009
1.10
Align / Pilot Drill Lower Crosstie
Details

 04-28-2009
1.00
Aft Fuse Alignment / Initial Pilot Drill
Details
       

 04-27-2009
1.30
Pilot Drill Lower Skin
Details
       

 04-26-2009
3.00
Fuselage Alignment
Details
       

 04-25-2009
1.50
Fit / Drill new Lower Splice Plates
Details

 04-22-2009
1.50
Rework Lower Fuselage Splice Plates
Details
     

 04-19-2009
4.20
Finalized Detail Parts / Start Fuse Alignment
Details
       

 04-18-2009
2.20
Cross Tie Fabrication
Details
     

 04-17-2009
1.40
Complete Cross Tie Box
Details

 04-16-2009
1.40
CrossTie Box Details
Details

 04-15-2009
0.90
Rear Bulkhead Fab
Details
     

 04-12-2009
3.30
Misc Aft Fuse Part / SubAssy Fab
Details

 04-11-2009
2.10
Seat Belt Attach Webs
Details
     

 04-10-2009
1.50
Riveted Side Panels
Details
       

 04-09-2009
1.10
Debur Right Aft Fuse Side Panel sub assy
Details

 04-08-2009
1.50
Prep for Riveting Aft Fuse Sides
Details
       

 04-06-2009
1.00
Adjustment of Splice Plates
Details

 04-05-2009
4.60
Fitting Splice Plates
Details
       

 04-04-2009
3.80
More Sub Assy Work on Aft Fuse Panels
Details
       

 04-03-2009
3.00
Right Aft Fuse Subassembly Pilot Drill
Details
       

 04-02-2009
2.00
Aft Fuse Right Side
Details
     

 03-31-2009
1.20
Bend Aft Fuse Skins
Details

 03-30-2009
1.30
Aft Fuse Skin / Longeron Details
Details
     

 03-28-2009
0.00
Wing Cradle
Details
       

 03-27-2009
1.40
Completed SNX-F27 Detail Parts
Details
     

 03-26-2009
1.40
Fairlead Block Rework & SNX-F27-01R
Details
       

 03-25-2009
1.30
More Vert Channel Details
Details

 03-24-2009
1.00
Continue Vert Channel Detail Parts
Details
     

 03-23-2009
0.90
Vertical Channel Fab
Details

 03-22-2009
1.30
Cont'd Vertical Channel Work
Details

 03-21-2009
1.80
Fairlead Blocks & Vertical Channel
Details
       

 03-20-2009
2.80
Aft Fuse Detail Parts Prep
Details
     

 03-18-2009
1.00
Setup for Aft Fuselage
Details

 03-15-2009
3.00
Completed Right Aileron
Details
       

 03-14-2009
3.00
Right Aileron Prep for Riveting
Details
       

 03-13-2009
1.40
Right Aileron Skin Drill / Counterweight Deburr
Details
     

 03-12-2009
1.50
Right Aileron Rivet Markup & Counterweight
Details
       

 03-11-2009
0.00
Tech Counselor Visit #2
Details

 03-08-2009
1.70
Right Aileron Counterweight Assy
Details
     

 03-07-2009
4.50
Finish Flap / Start Right Aileron Detail Parts
Details
       

 03-06-2009
3.30
Right Flap Drill / Deburr / Prep for Rivet
Details
     

 03-05-2009
1.20
Pilot Drill Right Flap for Ribs
Details
     

 03-04-2009
1.60
Cut Right Flap
Details
     

 03-03-2009
1.20
Right Flap Detail Work
Details
       

 03-01-2009
1.40
Landing Light Lens Install
Details
       

 02-28-2009
4.70
Almost Complete - Left Aileron
Details
       

 02-24-2009
1.00
Left Aileron Tip Rib
Details
       

 02-23-2009
1.70
Mark / Drill Left Aileron
Details
       

 02-18-2009
1.50
Left Aileron Markup / Hinge Drill
Details

 02-16-2009
1.30
Aileron Skin Cutting / Smoothing
Details

 02-15-2009
3.60
Completed Left Aileron Subassemblies
Details
       

 02-14-2009
3.00
Left Aileron SubAssemblies
Details
       

 02-14-2009
0.00
Cover for Plans
Details
       

 02-12-2009
0.30
Scrounged Up Aileron Parts
Details
     

 02-11-2009
1.00
Rivet Left Flap / Mark Left Aileron
Details
       

 02-09-2009
1.40
Left Flap Deburr / Prep for Riveting
Details

 02-07-2009
4.70
Prepare Left Flap
Details
       

 02-02-2009
1.00
Prep Left Flap
Details
     

 02-01-2009
0.90
Left Flap Details
Details
     

 01-31-2009
2.40
FINISHED Left Wing Box
Details
       

 01-29-2009
1.50
Install Light Kit Lens Brackets
Details
       

 01-28-2009
1.20
Light Kit Hole in Wing
Details
       

 01-25-2009
4.10
Landing Light Bracket / Reposition LE Skin
Details
       

 01-24-2009
3.90
Left Leading Edge Skin Prep for Riveting
Details
       

 01-22-2009
1.20
Left Wing LE Rib Prep for Riveting
Details

 01-21-2009
1.60
Riveted Left Wing Lower Aft Skin
Details
       

 01-19-2009
2.20
Aileron Control Rod Install / Deburr Aft Skin
Details
       

 01-18-2009
1.20
Left Wing Deburr for Lower Aft Skin
Details

 01-17-2009
2.20
Prep work for Left Lower Aft Skin
Details
       

 01-15-2009
0.80
Left Upper Aft Skin Riveted
Details
     

 01-14-2009
1.00
Completed Deburr of Left Upper Aft Skin
Details
     

 01-12-2009
2.10
Upper Aft Skin Debur & Re-Rivet #5 Rib
Details

 01-11-2009
1.00
Deburr Upper Aft Wing Skin (Left)
Details
     

 01-10-2009
3.80
Remainder of Left Wing Box Prep details
Details
       

 01-09-2009
1.20
Misc Left Wing Deburr Prep
Details
     

 01-08-2009
1.30
Left Wing Hinges & Spar Up-drill
Details
       

 01-07-2009
1.30
Bottom side of Left Wing Leading Edge Cleco
Details
       

 01-06-2009
2.40
Left Wing LE Skin Fitment
Details
       

 01-04-2009
2.40
Lower Aft Skin Fitting
Details

 01-02-2009
4.40
Fitting Left Lower Aft Skin
Details
       

 01-01-2009
4.90
Left Wing Aft Upper Skin Fitting
Details
       

 12-30-2008
4.10
Left Wing Skeleton Completed
Details
       

 12-29-2008
2.80
Progress toward left spar / rib assembly
Details
     

 12-28-2008
0.00
Wing Support Jig
Details
       

 12-27-2008
2.20
Left Wing Misc Deburr
Details

 12-26-2008
1.20
Left Root Rib Rivet & Up-Drilling Ribs
Details
       

 12-25-2008
0.60
Deburr Left Root Rib
Details

 12-24-2008
3.30
Left Wing Root Rib Placement
Details
       

 12-20-2008
4.50
Left Wing Rib Attachment
Details
     

 12-19-2008
0.50
Completed SNX-W21 (Left Aileron Bellcrank)
Details
     

 12-18-2008
1.40
Left Ailieron Bellcrank / Rib #9 Ready to Rivet
Details
       

 12-17-2008
1.10
Left Rib #9 Bellcrank subassembly
Details
     

 12-16-2008
1.00
Left Aileron Bellcrank Details
Details

 12-14-2008
3.30
Left Root Rib Details / Left Fwd Rib Rework
Details
       

 12-11-2008
0.50
Deburred Reworked Fwd Ribs 1 & 4
Details

 12-10-2008
0.70
Left Wing Rib 1 & 4 Rework
Details
     

 12-09-2008
1.00
Left Wing Fwd Rib Rework
Details
     

 12-07-2008
2.00
Completed Right Wing Box (mostly)
Details
       

 12-06-2008
3.80
Right Wing Leading Edge Rivet
Details
       

 12-01-2008
0.20
Right Root Rib Correction
Details
       

 11-30-2008
3.30
Right Wing Lower Aft Skin Riveted
Details
       

 11-29-2008
4.60
Prep Right Wing Lower Aft Skin for Riveting
Details
       

 11-17-2008
2.30
Riveting Right Wing Upper Aft Skin
Details
       

 11-16-2008
2.60
More Deburring Right Wing
Details

 11-14-2008
2.70
Right Wing Skin Deburr
Details
     

 11-10-2008
1.10
Right Wing Aileron Hinge Initial Fit
Details
       

 11-09-2008
2.80
Right LE Skin Dimple / Deburr / Aft Spar Drill
Details

 11-08-2008
0.80
Leading Edge Dimple Prep
Details
       

 11-07-2008
1.10
Dimpled Rib Cleanup
Details

 11-06-2008
1.50
Misc Right Wing Closure Prep
Details
       

 11-04-2008
1.30
Position / Drill / Cleco Right Wing Flap Hinge
Details
     

 11-03-2008
1.20
Misc Right Wing Prep Detail
Details
       

 11-02-2008
3.30
Pitot / Static Fitting
Details
       

 10-31-2008
2.90
Updrilling and Dimpling Right LE Skin / Ribs
Details
       

 10-29-2008
1.40
Right Wing Doubler / Updrilling
Details

 10-28-2008
1.30
Right Wing Detail Prep Work
Details

 10-27-2008
1.10
Up-Drill Right Wing Skins
Details

 10-23-2008
1.00
Right Leading Edge Pilot Drilling
Details
       

 10-22-2008
1.30
Right Leading Edge Skin
Details

 10-19-2008
3.20
Right Wing Leading Edge Trial Fit
Details
       

 10-18-2008
2.20
Right Wing Lower Aft Skin Fitting
Details
     

 10-17-2008
3.90
Right Wing Bottom Aft Skin Fitting
Details
       

 10-15-2008
1.40
Drill / Cleco Right Upper Aft Skin
Details
       

 10-13-2008
2.30
Right Wing Upper Aft Skin Fitment
Details
     

 10-11-2008
4.10
Right Wing Skeleton Completed
Details
       

 10-09-2008
1.00
SNX-W21-09 Clip Details
Details

 10-07-2008
1.00
Misc Aileron Bellcrank Details
Details
       

 10-04-2008
4.20
Right Wing Lower Aft Skin Fitting
Details
     

 10-01-2008
1.70
Rib 9 Aileron Bellcrank (Right Wing)
Details
       

 09-30-2008
1.60
Aileron Bellcrank Assemblies
Details
     

 09-29-2008
1.60
Completed Riveting R Wing Ribs
Details
     

 09-25-2008
1.20
Right Wing Rib Riveting
Details
     

 09-24-2008
1.20
Rib Debur (Right)
Details

 09-23-2008
1.10
Debur Ribs (Right Wing)
Details

 09-22-2008
0.80
Debur / Prep for R Wing Assy
Details

 09-21-2008
2.50
Root Rib Riveting & Deburr
Details
     

 09-20-2008
7.70
Root Rib & Aileron Bellcrank Parts
Details
       

 09-19-2008
1.40
Up-Drilled Wing Ribs
Details

 09-17-2008
1.10
Wing Box Assembly
Details
       

 09-15-2008
1.10
Position Center Spacers
Details
     

 09-14-2008
2.40
Rib Attach Detail Parts
Details
       

 09-14-2008
1.50
Complete SNX-W15 Page
Details
       

 09-14-2008
1.50
Added Pitot/Static Tubing Supports
Details
     

 09-11-2008
1.00
Completed Aft Ribs
Details
     

 09-10-2008
1.90
Aft Rib Prep / Cleanup
Details
     

 09-07-2008
4.20
Aft Rib Detail Work
Details

 09-06-2008
5.00
Completed Forward Ribs
Details
       

 09-05-2008
1.10
Forward Rib Drilling
Details
     

 09-03-2008
1.00
Forward Rib Trimming
Details
       

 09-02-2008
0.80
Rib Trimming Prep
Details

 09-01-2008
2.70
Rib Gusset
Details
       

 08-28-2008
0.80
Completed Left Rear Spar
Details
       

 08-27-2008
1.20
Left Rear Spar Attachment Plate
Details

 08-26-2008
1.60
Left Rear Spar Subassemblies
Details

 08-24-2008
2.20
Completed R Rear Spar
Details
       

 08-23-2008
4.70
Rear Spar Assemblies
Details
       

 08-22-2008
2.80
Rear Spar Detail Parts
Details
       

 08-22-2008
0.90
Completed Main Spars
Details
       

 08-20-2008
1.10
Rework on Wing Attach Blocks
Details

 08-18-2008
1.50
Wing Attach Block Evaluation
Details

 08-17-2008
2.90
Main Spar Mating
Details
       

 08-16-2008
2.30
Spar Parts, Rear Spar Material
Details
       

 08-14-2008
1.40
W11-11 & W11-10 Vertical Stiffener / Tie Down
Details
       

 08-10-2008
3.00
Root Rib Attach Angles
Details

 08-08-2008
2.80
Wing Attach Angles, Cont'd
Details

 08-06-2008
1.20
Left Spar Root Wing Attach Assy
Details
     

 08-05-2008
1.30
Root Wing Attach Assembly
Details
       

 08-03-2008
3.80
Attach Angle Details
Details
       

 07-24-2008
1.20
Completed Horizontal Stabilizer
Details
     

 07-23-2008
0.80
Fitting Right Horiz Stab Fiberglass Tip
Details
       

 07-21-2008
1.30
Installed Right Tip Rib - Elevator
Details

 07-20-2008
2.80
Pin Hinge / Mount Left Fiberglass Tip
Details
       

 07-18-2008
1.20
Riveted Elevator Control Horn
Details
       

 07-17-2008
1.90
Drilling / Cleco'ing Elevator Control Horn
Details
       

 07-14-2008
0.00
EAA Tech Counselor Visit
Details

 07-12-2008
3.10
Elevator to Stabilizer Mate
Details
       

 07-11-2008
4.10
Right Elevator Assembly
Details
       

 07-10-2008
0.60
Riveted Left Elevator Skin
Details

 07-07-2008
0.80
Trim Tab Mount to Elevator
Details
       

 06-30-2008
1.70
Left Elevator Prep for Riveting
Details

 06-29-2008
4.50
Left Elevator Trial Fit
Details
       

 06-28-2008
2.30
Riveted Horizontal Stabilizer
Details
       

 06-27-2008
3.50
Deburr Horizontal Stabilizer
Details

 06-25-2008
1.10
Planning Assembly
Details

 06-22-2008
1.90
Horizontal Stab Rivet Prep
Details
       

 06-21-2008
2.80
Horiz Stab Prep for Riveting
Details
       

 06-19-2008
0.80
Horiz Stab Right Skin
Details
       

 06-18-2008
0.90
Horiz Stab Left Side Skinning
Details
       

 06-17-2008
1.20
Horiz Stab Skinning
Details
       

 06-14-2008
3.30
Horizontal Stabilizor Frame Riveted
Details

 06-13-2008
5.20
Horiz Stab Frame Prep for Riveting
Details
       

 06-11-2008
1.10
Horizontal Stab Frame
Details

 06-08-2008
4.50
Horiz Stab Framework
Details
       

 06-07-2008
3.80
Horiz Stab Front / Rear Spars Riveted
Details
       

 06-05-2008
4.00
Horiz Stab Front Spar Assembly
Details
       

 06-02-2008
1.10
Horiz Stab Front Spar Channel
Details

 06-01-2008
1.70
Horiz Stab Aft Main Spar
Details
       

 05-31-2008
2.30
More Horiz Stab Detail Parts
Details
       

 05-30-2008
3.20
Completed Elevator Horn
Details
       

 05-27-2008
1.10
Elevator Horn Work
Details

 05-26-2008
4.00
Horiz Stab Detail Parts
Details
       

 05-24-2008
6.00
Elevator & Horizontal Stab Detail Parts
Details
       

 05-22-2008
1.10
Horiz Stab Misc
Details

 05-20-2008
1.00
Vertical Stabilizer Tip
Details

 05-18-2008
3.80
Horiz Stab Detail Parts
Details
       

 05-16-2008
4.10
Vertical Stab Metal Completed
Details
       

 05-15-2008
2.70
Vertical Stab Assembly
Details

 05-14-2008
1.00
Vertical Stab Frame Riveted
Details

 05-11-2008
2.70
Vertical Stab Skin
Details
       

 05-10-2008
2.00
Vertical Stab Frame
Details
       

 05-10-2008
2.80
Bolt Work
Details

 05-06-2008
2.20
Bolt Work
Details

 05-04-2008
5.30
Vertical Stab Sub Assemblies
Details
       

 05-02-2008
4.50
Vertical Stab Spars
Details

 04-30-2008
0.80
Vertical Stab Parts
Details

 04-28-2008
1.10
Vertical Stab Parts
Details

 04-26-2008
5.80
Rudder Complete
Details
       

 04-25-2008
1.20
Rudder Skin
Details

 04-24-2008
0.50
Rudder Control Horn Completed
Details
       

 04-22-2008
0.50
Rudder Control Horn Assembly
Details
       

 04-21-2008
0.80
Rudder First Assembly
Details

 04-20-2008
2.50
Rudder First Parts!!!
Details
       

 04-18-2008
0.00
Workbench
Details

 04-09-2008
0.00
Wicks Kit Arrival
Details

 04-06-2008
0.00
Damage Claim
Details

 04-04-2008
0.00
Garage Organization
Details

 04-02-2008
0.00
Inventory Complete
Details

 04-01-2008
0.00
Kit Arrival, Part II
Details
       

 04-01-2008
0.00
Kit Arrival
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.