KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  1-20-2011
Number of Hours:  0.60
Manual Reference:  aerovee
Brief Description:  Finish Firesleev-ing Fuel & Oil Lines

Good progress tonight.

The dipped ends of the firesleeve from last night were all nice and cured, so it was time to assemble the fuel & oil lines.

Slid firesleeve onto the target braided lines, then assembled the coupling to the remaining end. Re-positioned the firesleeve into position, then used the appropriate clamp banding tool to add the clamp on each end. Trimmed the remaining ends of the clamps after trimming.

Still cannot install the oil cooler lines. The lower baffle is expected to arrive tomorrow, so once that's bent and the cooler hole is cut, the cooler can be installed and the lines run.
' style=

Materials ready for assembly

Materials ready for assembly

' style=

The firesleeve banding tool in action

The firesleeve banding tool in action

' style=

Finished Product (blue tape means right side)

Finished Product (blue tape means right side)

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.