Date
|
Hours
|
Work Log Summary
|
Details
|
02-16-2015
|
0.00
|
Surprise ending / last post
|
Details
|
|
|
01-10-2015
|
3.50
|
Added upholstery to baggage shelf
|
Details
|
|
|
11-02-2014
|
2.50
|
Enlarged air inlets
|
Details
|
|
|
11-01-2014
|
0.00
|
2 - Made dash mat to stop reflection on canopy
|
Details
|
|
|
11-01-2014
|
7.75
|
1 - Installed new nosegear bungee
|
Details
|
|
|
10-12-2014
|
0.00
|
4 - Post flight fix for high temps
|
Details
|
|
|
10-12-2014
|
0.00
|
3 - Post flight fix of heavy wing problem
|
Details
|
|
|
10-12-2014
|
0.00
|
2 - Post flight fix for comm radio problem
|
Details
|
|
|
10-12-2014
|
0.00
|
1 - First flight!
|
Details
|
|
|
09-21-2014
|
0.00
|
1 - Attempted first flight
|
Details
|
|
|
09-18-2014
|
3.00
|
Installed last access covers and checked audio
|
Details
|
|
|
09-16-2014
|
2.90
|
Fixed squawks and closed up access openings
|
Details
|
|
|
09-13-2014
|
0.00
|
More inspection photos
|
Details
|
|
|
09-13-2014
|
0.00
|
Airworthiness Inspection Complete - It's a plane!
|
Details
|
|
|
09-12-2014
|
4.90
|
Final prep for airworthiness inspection
|
Details
|
|
|
09-11-2014
|
2.00
|
Completed compression test
|
Details
|
|
|
09-01-2014
|
6.00
|
Misc. engine and wire routing tasks
|
Details
|
|
|
08-31-2014
|
4.25
|
Safety wired ailerons and measured deflection
|
Details
|
|
|
08-30-2014
|
0.00
|
Submitted paperwork for airworthiness inspection
|
Details
|
|
|
08-30-2014
|
4.25
|
Safety wiring and safety bulletin on rockers
|
Details
|
|
|
08-29-2014
|
7.50
|
Supplemental labels on panel
|
Details
|
|
|
08-28-2014
|
7.25
|
Pitot static and encoder certified
|
Details
|
|
|
08-10-2014
|
3.00
|
Final weight & balance and fuel flow test
|
Details
|
|
|
08-09-2014
|
5.50
|
Installed wing root fairings & finished extra latc
|
Details
|
|
|
08-03-2014
|
1.00
|
Secondary latch installed
|
Details
|
|
|
08-02-2014
|
8.50
|
Work on secondary latch and wheel pants
|
Details
|
|
|
07-28-2014
|
2.00
|
More nose bowl sanding
|
Details
|
|
|
07-20-2014
|
2.50
|
Split nose bowl inlets and set idle RPM
|
Details
|
|
|
07-18-2014
|
0.00
|
3 - Reconnected heated pitot
|
Details
|
|
|
07-18-2014
|
0.00
|
2 - Worked on sensors
|
Details
|
|
|
07-18-2014
|
5.50
|
1 - RPM fixed
|
Details
|
|
|
07-16-2014
|
1.75
|
Sanded nose bowl air inlets
|
Details
|
|
|
07-14-2014
|
2.25
|
Worked on RPM input
|
Details
|
|
|
07-13-2014
|
2.00
|
Engine wire routing and nosebowl epoxy
|
Details
|
|
|
07-12-2014
|
0.00
|
4 - Good start on air inlet rings
|
Details
|
|
|
07-12-2014
|
0.00
|
3 - Moved CHT probe from top to bottom
|
Details
|
|
|
07-12-2014
|
0.00
|
2 - Installed mount for iPad Air
|
Details
|
|
|
07-12-2014
|
8.00
|
1 - Installed new headphone jack panel
|
Details
|
|
|
06-29-2014
|
5.25
|
Changed oil, cleaned canopy and misc.
|
Details
|
|
|
06-28-2014
|
7.00
|
Confirmed engine temps and misc.
|
Details
|
|
|
06-27-2014
|
3.70
|
Ran engine at 2,200 RPM for 1 hour
|
Details
|
|
|
06-27-2014
|
2.50
|
Hooked up pitot / static tubing to Voyager and XTr
|
|
|
|
06-23-2014
|
7.00
|
Engine shroud and more adjustments
|
Details
|
|
|
06-22-2014
|
3.50
|
First engine start on airframe
|
Details
|
|
|
06-19-2014
|
4.10
|
Replaced carb and painted pitot
|
Details
|
|
|
06-17-2014
|
2.75
|
Riveted flaps and determined flap angles
|
Details
|
|
|
06-16-2014
|
2.50
|
1 - Set up tow bar capture points
|
Details
|
|
|
06-15-2014
|
0.25
|
2 - Confirmed wing MAC at station 1,790 mm
|
Details
|
|
|
06-15-2014
|
5.50
|
1 - Installed flap position sensor
|
Details
|
|
|
06-14-2014
|
3.50
|
5 - Made and installed new landing light lens
|
Details
|
|
|
06-14-2014
|
0.75
|
4 - Installed halon fire extinguisher
|
Details
|
|
|
06-14-2014
|
0.30
|
3 - Wire routing for fuel sender wires
|
|
|
|
06-14-2014
|
0.90
|
2 - Added "Experimental" decal
|
|
|
|
06-14-2014
|
0.90
|
1 - Confirmed Weight & Balance arms from 1,790mm
|
Details
|
|
|
06-08-2014
|
2.00
|
Confirmed W&B arms & riveted fuselage bottom
|
Details
|
|
|
06-06-2014
|
0.00
|
Sent carburetor for repair
|
Details
|
|
|
06-05-2014
|
3.00
|
Removed carburetor
|
Details
|
|
|
06-04-2014
|
6.50
|
Attempted 1st engine start on airplane
|
Details
|
|
|
06-03-2014
|
3.75
|
Preliminary weight & balance
|
Details
|
|
|
06-02-2014
|
3.50
|
Punch list items
|
Details
|
|
|
06-01-2014
|
5.00
|
Wire routing
|
Details
|
|
|
05-31-2014
|
1.00
|
5 - Pictures before exposing the engine for access
|
Details
|
|
|
05-31-2014
|
1.00
|
4 - General cleaning and wire routing
|
Details
|
|
|
05-31-2014
|
0.75
|
3 - Riveted trailing edge of wing top skin
|
Details
|
|
|
05-31-2014
|
0.50
|
2 - Resealed rubber seals on canopy
|
Details
|
|
|
05-31-2014
|
2.75
|
1 - Elevator rigging complete
|
Details
|
|
|
05-30-2014
|
3.00
|
Worked on elevator rigging
|
Details
|
|
|
05-30-2014
|
1.75
|
Connected fuel lines inside cockpit
|
Details
|
|
|
05-28-2014
|
6.50
|
Installed flaps
|
Details
|
|
|
05-27-2014
|
1.50
|
3 - Added flap stops
|
|
|
|
05-27-2014
|
1.00
|
2 - Final adjustment of dual stick geometry
|
|
|
|
05-27-2014
|
1.25
|
1 - Added bottom stop for elevator
|
Details
|
|
|
05-26-2014
|
0.50
|
4 - Removed heated pitot
|
Details
|
|
|
05-26-2014
|
2.25
|
3 - Added aileron upper deflection stops
|
Details
|
|
|
05-26-2014
|
3.75
|
2 - Fit and installed elevator saddle
|
Details
|
|
|
05-26-2014
|
4.50
|
1 - Completed installation of Aileron Control Stop
|
Details
|
|
|
05-25-2014
|
5.75
|
Various jobs including aileron control stop
|
Details
|
|
|
05-23-2014
|
2.00
|
Started flap installation
|
Details
|
|
|
05-23-2014
|
5.00
|
Rigged and adjusted rudder
|
Details
|
|
|
05-23-2014
|
3.50
|
Adjusted aileron and dual stick geometry
|
Details
|
|
|
05-17-2014
|
9.50
|
Rigged ailerons and elevator
|
Details
|
|
|
05-03-2014
|
6.50
|
Drilled for rear spar bolts and added spar rivets
|
Details
|
|
|
04-27-2014
|
4.50
|
Mounted right wing
|
Details
|
|
|
04-26-2014
|
5.50
|
Mounted left wing
|
Details
|
|
|
04-20-2014
|
180.00
|
Back in business - Part 2
|
Details
|
|
|
04-20-2014
|
0.00
|
Back in business - Part 1
|
Details
|
|
|
04-30-2013
|
1.25
|
Spar measurements
|
Details
|
|
|
03-08-2013
|
1.50
|
2 - Testing center spar for fit
|
Details
|
|
|
03-08-2013
|
2.75
|
1 - Replaced solid rivets in center spar
|
Details
|
|
|
02-10-2013
|
1.00
|
Removed solid rivets in center spar
|
Details
|
|
|
02-09-2013
|
1.50
|
Removed bottom skin doubler
|
Details
|
|
|
01-19-2013
|
4.00
|
Center spar removed and checked
|
Details
|
|
|
01-14-2013
|
0.00
|
Update on conversation with factory
|
Details
|
|
|
01-13-2013
|
8.00
|
A long weekend of experimenting and learning
|
Details
|
|
|
01-07-2013
|
0.00
|
Consulted with Zenith on wing spar issues
|
Details
|
|
|
01-06-2013
|
0.00
|
2 - Pounds and pounds of rivet mandrels
|
Details
|
|
|
01-06-2013
|
0.00
|
1 - Restored garage for two cars
|
Details
|
|
|
01-05-2013
|
7.00
|
Trimmed wing roots and attempted wing install
|
Details
|
|
|
01-03-2013
|
0.00
|
4 - Hangar pictures
|
Details
|
|
|
01-03-2013
|
0.00
|
3 - Moved project to EAA Builder Center
|
Details
|
|
|
01-03-2013
|
2.25
|
2 - Miscellaneous last minute installations
|
Details
|
|
|
01-03-2013
|
1.50
|
1 - Pre-move organization
|
Details
|
|
|
01-01-2013
|
0.00
|
N819P Open House today
|
Details
|
|
|
12-31-2012
|
2.10
|
Left wing tip and landing light lens installed
|
Details
|
|
|
12-30-2012
|
3.50
|
3 - Right. landing light lens and wing tip
|
Details
|
|
|
12-30-2012
|
1.75
|
2 - Balanced ailerons
|
Details
|
|
|
12-30-2012
|
2.00
|
1 - Cleaned work table to setup for wings
|
Details
|
|
|
12-29-2012
|
3.25
|
1 - Attached nose wheel fairing
|
Details
|
|
|
12-28-2012
|
2.00
|
5 - Wired rudder strobe
|
Details
|
|
|
12-28-2012
|
2.00
|
4 - Cut and placed rudder strobe fairing
|
|
|
|
12-28-2012
|
0.75
|
3 - Secured upper rudder hinge and strobe wire
|
|
|
|
12-28-2012
|
1.00
|
2 - Removed and rerouted strobe wire
|
Details
|
|
|
12-28-2012
|
2.00
|
1 - Assembled nose wheel fairing
|
|
|
|
12-27-2012
|
2.25
|
2 - Fabricated and installed rudder fairing
|
|
|
|
12-27-2012
|
1.50
|
1 - Fabricated and installed rudder stops
|
|
|
|
12-23-2012
|
3.50
|
Adjusted and trimmed rudder
|
|
|
|
12-22-2012
|
4.50
|
Mounted rudder
|
Details
|
|
|
12-21-2012
|
1.50
|
3 - Installed left wheel fairing
|
Details
|
|
|
12-21-2012
|
3.25
|
2 - Installed right wing fairing
|
Details
|
|
|
12-21-2012
|
1.00
|
1 - Finished left attachment bracket install
|
Details
|
|
|
12-20-2012
|
4.75
|
Mounting brackets for main wheel fairings
|
Details
|
|
|
12-17-2012
|
1.25
|
Tested continuity to wing tips
|
Details
|
|
|
12-13-2012
|
2.50
|
Replaced canopy, center console/side panels
|
Details
|
|
|
12-12-2012
|
1.40
|
1 - Prepped and painted center console & panels
|
Details
|
|
|
12-11-2012
|
26.00
|
A day of flying and odd jobs
|
Details
|
|
|
12-10-2012
|
2.50
|
2 - Completed behind the panel wire routing
|
Details
|
|
|
12-10-2012
|
1.75
|
1 - More left side wire bundling
|
Details
|
|
|
12-09-2012
|
2.25
|
3 - Bundled wires behind panel
|
Details
|
|
|
12-09-2012
|
1.00
|
2 - Riveted tips on horizontal stabilizer
|
Details
|
|
|
12-09-2012
|
1.90
|
1 - Reattached rubber canopy seals
|
Details
|
|
|
12-08-2012
|
2.20
|
Soldered roll trim wire in wing & riveted aileron
|
Details
|
|
|
12-06-2012
|
1.50
|
Rewired roll trim servo and fixed pitch trim LED
|
Details
|
|
|
12-04-2012
|
0.75
|
2 - Temporarily replaced wire covers
|
Details
|
|
|
12-04-2012
|
0.75
|
1 - Reattached nose gear safety wire
|
Details
|
|
|
12-02-2012
|
1.75
|
3 - Reattached aileron trim wire
|
Details
|
|
|
12-02-2012
|
1.50
|
2 - Installed magnetic current sensor
|
|
|
|
12-02-2012
|
2.50
|
1 - Completed wing root connectors
|
Details
|
|
|
12-01-2012
|
5.75
|
Wing connector wiring and misc.
|
Details
|
|
|
11-29-2012
|
2.00
|
2 - Wired GPS to ELT connection
|
Details
|
|
|
11-29-2012
|
2.20
|
1 - Connected OAT and finished cabin wire routing
|
|
|
|
11-28-2012
|
2.50
|
1 - Wired GPS to ELT at ELT end
|
Details
|
|
|
11-27-2012
|
3.50
|
2 - Wired roll trim, added 2nd OAT and misc.
|
Details
|
|
|
11-27-2012
|
2.40
|
1 - Soldered Dsub connections to flap LED
|
Details
|
|
|
11-26-2012
|
2.20
|
Wired flap position sensor & routed wires
|
Details
|
|
|
11-25-2012
|
2.25
|
Added panel LED for flap setting
|
Details
|
|
|
11-21-2012
|
0.00
|
Took a break and took to the air
|
Details
|
|
|
11-20-2012
|
3.00
|
Wire routing and ELT fix
|
Details
|
|
|
11-19-2012
|
1.50
|
2 - Attached rear strobe and tested ELT
|
Details
|
|
|
11-19-2012
|
1.50
|
1 - Installed SCAT hoses to cabin air vents
|
|
|
|
11-18-2012
|
7.75
|
Installed rear strobe and wired ELT
|
Details
|
|
|
11-17-2012
|
0.00
|
Sent in my request for registration to the FAA
|
Details
|
|
|
11-17-2012
|
2.00
|
2 - Installed cabin heat control cable
|
Details
|
|
|
11-17-2012
|
2.50
|
1 - Removed canopy and riveted top skin
|
Details
|
|
|
11-16-2012
|
0.00
|
Found EAA Builder Center for final assembly & test
|
Details
|
|
|
11-12-2012
|
0.75
|
2 - Connected RS232 #1 from V10 to Voyager
|
Details
|
|
|
11-12-2012
|
0.00
|
1 - It's official now -- I can build an aeroplane
|
Details
|
|
|
11-11-2012
|
5.00
|
Wired RDACs to Voyager and XTreme
|
Details
|
|
|
11-10-2012
|
1.00
|
3 - Connected PTT for pilot and copilot to grip
|
|
|
|
11-10-2012
|
2.00
|
2 - Installed auxiliary & headphone jacks
|
Details
|
|
|
11-10-2012
|
2.00
|
1 - Connect RDAC, IOEX, Fuel press, & flow to pwr
|
Details
|
|
|
11-06-2012
|
1.00
|
Connected RDAC to Voyager and XTreme
|
Details
|
|
|
11-05-2012
|
2.50
|
Installed GPS antennas
|
Details
|
|
|
11-04-2012
|
4.50
|
2 - Installed V10 Comm Radio
|
Details
|
|
|
11-04-2012
|
2.25
|
1 - Wired ignition/fuel switch and trim LED
|
Details
|
|
|
11-03-2012
|
5.75
|
Connected panel and control cables
|
Details
|
|
|
11-02-2012
|
5.25
|
Finished switch wiring and installed panel
|
Details
|
|
|
11-01-2012
|
3.50
|
Wired pitot and XTreme & made labels
|
Details
|
|
|
10-31-2012
|
1.50
|
2 - Wired power to all remaining switches
|
Details
|
|
|
10-31-2012
|
0.50
|
1 - Wired transponder
|
Details
|
|
|
10-30-2012
|
2.00
|
2 - Wired Voyager and EFIS warning light
|
Details
|
|
|
10-30-2012
|
1.25
|
1 - Wired OV warning light
|
Details
|
|
|
10-29-2012
|
1.25
|
Wired V-10 comm switch and GMA 240 Audio
|
Details
|
|
|
10-28-2012
|
7.50
|
Labeled cockpit wires and started switch wiring
|
Details
|
|
|
10-19-2012
|
3.75
|
Labeled instrument panel
|
Details
|
|
|
10-14-2012
|
0.50
|
2 - Rearranged panel switches
|
Details
|
|
|
10-14-2012
|
1.00
|
1 - Secured stick grip cables around center suppor
|
Details
|
|
|
10-08-2012
|
3.25
|
2 - Misc punch list items
|
Details
|
|
|
10-08-2012
|
2.00
|
1 - Misc. under cowling - replaced cowling
|
Details
|
|
|
10-07-2012
|
6.00
|
Completed & installed heat muff
|
Details
|
|
|
10-06-2012
|
2.75
|
Started fabricating SS heat muff
|
Details
|
|
|
10-01-2012
|
2.75
|
Moved carb heat muff and cabin heat valve
|
Details
|
|
|
09-29-2012
|
0.00
|
Passed Sport Pilot Practical Test
|
Details
|
|
|
08-25-2012
|
1.50
|
Wired flap motor and installed new capacitor
|
Details
|
|
|
08-18-2012
|
1.00
|
Fixed brake fitting leak
|
Details
|
|
|
08-17-2012
|
4.50
|
Tested and calibrated fuel flow
|
Details
|
|
|
08-12-2012
|
4.50
|
Made CAD of busses and labeled
|
Details
|
|
|
08-11-2012
|
8.50
|
Completed stick grip wiring harness
|
Details
|
|
|
08-07-2012
|
3.00
|
Completed stick grip wiring D sub connectors
|
Details
|
|
|
08-06-2012
|
2.25
|
Wired co-pilot side D-sub connector for stick grip
|
Details
|
|
|
08-05-2012
|
6.60
|
Started wiring stick grip connectors
|
Details
|
|
|
08-04-2012
|
2.50
|
3 - Wired elevator trim LED indicator
|
Details
|
|
|
08-04-2012
|
3.75
|
2 - Routed elevator trim cable
|
Details
|
|
|
08-04-2012
|
2.75
|
1 - Rewired fuel pumps
|
Details
|
|
|
08-03-2012
|
3.10
|
Wired fuel pumps
|
Details
|
|
|
08-02-2012
|
2.50
|
Wired igntion system
|
Details
|
|
|
08-01-2012
|
1.75
|
Completed OV protection/alternator wiring
|
Details
|
|
|
07-31-2012
|
3.50
|
Progress on alternator system wiring
|
Details
|
|
|
07-29-2012
|
5.00
|
More wiring
|
Details
|
|
|
07-28-2012
|
7.50
|
Wiring marathon
|
Details
|
|
|
07-24-2012
|
2.50
|
Routed dual stick grip cables
|
Details
|
|
|
07-23-2012
|
3.50
|
Wired starter relay
|
Details
|
|
|
07-22-2012
|
3.00
|
Installed SP-2 magnetometer
|
Details
|
|
|
07-19-2012
|
3.25
|
Shimmed SP-4 & re-routed CHT leads
|
Details
|
|
|
07-18-2012
|
2.10
|
Installed SP-4 and RDAC X ground buss
|
Details
|
|
|
07-17-2012
|
0.50
|
Fabricated insulated common FWF ground strip
|
Details
|
|
|
07-16-2012
|
0.50
|
1 - Connected oil pressure sender
|
Details
|
|
|
07-15-2012
|
1.00
|
2 - Connected oil temp and began oil pressure send
|
Details
|
|
|
07-15-2012
|
4.00
|
1 - Oil & filter changed and distributor set
|
Details
|
|
|
07-14-2012
|
4.50
|
Installed EGT probes and wired RDAC X
|
Details
|
|
|
06-25-2012
|
1.25
|
Installed CHT probes
|
Details
|
|
|
06-24-2012
|
2.50
|
Main wire to starter
|
Details
|
|
|
06-24-2012
|
0.40
|
Installed OAT sensor
|
Details
|
|
|
06-23-2012
|
4.25
|
2 - Began RDAC wiring
|
Details
|
|
|
06-23-2012
|
0.60
|
1 - Replaced left main brake line fittings
|
Details
|
|
|
06-22-2012
|
0.00
|
Resumed flight training for Sport Pilot license
|
Details
|
|
|
06-12-2012
|
0.75
|
Installed fuel pressure sender & fuel fittings
|
Details
|
|
|
06-10-2012
|
1.75
|
Re-pitched prop & installed firesleeve
|
Details
|
|
|
06-07-2012
|
0.80
|
Fuel line to carb and fuel filter installed
|
Details
|
|
|
06-06-2012
|
3.00
|
Re-routed 5th bearing oil line
|
Details
|
|
|
06-05-2012
|
3.25
|
Installed Floscan fuel meter
|
Details
|
|
|
06-04-2012
|
2.25
|
Installed fuel lines in cockpit and to carb
|
Details
|
|
|
06-02-2012
|
4.00
|
Finished brakes
|
Details
|
|
|
05-21-2012
|
0.00
|
2 - Installed brake lines (additional pictures)
|
Details
|
|
|
05-21-2012
|
2.75
|
1 - Installed brake lines
|
Details
|
|
|
05-20-2012
|
1.25
|
2 - Reinstalled passenger side right brake cylinde
|
Details
|
|
|
05-20-2012
|
1.00
|
1 -Reinstalled control cables into panel
|
Details
|
|
|
05-19-2012
|
2.50
|
Resumed wiring
|
Details
|
|
|
05-01-2012
|
0.00
|
Reinstalled Kitlog
|
Details
|
|
|
01-29-2012
|
2.50
|
Angled back of center console side panels
|
Details
|
|
|
01-28-2012
|
2.25
|
Nut plates in center console to secure side panels
|
Details
|
|
|
01-24-2012
|
1.50
|
Installed L angles for center console side panels
|
Details
|
|
|
01-23-2012
|
1.50
|
Fitted floor angle support for center console pane
|
Details
|
|
|
01-22-2012
|
2.75
|
Fabricated center console side panels
|
Details
|
|
|
01-21-2012
|
0.00
|
2 - Routing information
|
Details
|
|
|
01-21-2012
|
85.00
|
1 - Mounted antennas and routed coax
|
Details
|
|
|
12-03-2011
|
4.00
|
Mounted busses, OV protection and EFIS access.
|
Details
|
|
|
10-30-2011
|
4.75
|
Wired main power distribution and ground
|
Details
|
|
|
10-23-2011
|
3.00
|
Determined electrical connectors & ordered
|
Details
|
|
|
10-22-2011
|
0.75
|
2 - Connected to battery contactor
|
Details
|
|
|
10-22-2011
|
3.75
|
1 - Made cover for channel and routed battery wire
|
Details
|
|
|
10-20-2011
|
0.75
|
Installed ELT and soldered 1st lug
|
Details
|
|
|
10-17-2011
|
2.25
|
Installed battery and master solenoid relay
|
Details
|
|
|
10-16-2011
|
2.50
|
Fabricated battery box
|
Details
|
|
|
10-15-2011
|
2.50
|
Installed ELT and panel switches
|
Details
|
|
|
10-12-2011
|
4.50
|
Remade and installed right flap control bearing
|
Details
|
|
|
10-11-2011
|
1.50
|
Nosebowl fitting complete and misc.
|
Details
|
|
|
10-11-2011
|
1.25
|
1 - Enlarged air inlets
|
Details
|
|
|
10-10-2011
|
3.50
|
2 - Made seat back supports and torqued exhaust
|
Details
|
|
|
10-10-2011
|
3.25
|
1 - Installed seat belts
|
Details
|
|
|
10-08-2011
|
0.00
|
2 - Tip for finding the tip of the spinner
|
Details
|
|
|
10-08-2011
|
8.75
|
1 - Installed spinner
|
Details
|
|
|
10-07-2011
|
0.00
|
Seat cushions and center console cover arrived
|
Details
|
|
|
09-30-2011
|
1.25
|
2 - Marked spinner for cutouts
|
Details
|
|
|
09-30-2011
|
0.75
|
1 - Reinstalled intake manifold
|
Details
|
|
|
09-28-2011
|
3.00
|
Installed instruments in panel
|
Details
|
|
|
09-27-2011
|
3.75
|
Mounted and set adjustable prop
|
Details
|
|
|
09-26-2011
|
2.50
|
Primed and painted panel and tested stick wiring
|
Details
|
|
|
09-25-2011
|
2.50
|
Painted panel then stripped it
|
Details
|
|
|
09-24-2011
|
0.00
|
3 - Test fit panel instruments
|
Details
|
|
|
09-24-2011
|
4.00
|
2 - Painted panel, baffle seal and camloc work
|
Details
|
|
|
09-24-2011
|
2.25
|
1 - Transponder frame secured and panel primed
|
Details
|
|
|
09-23-2011
|
1.00
|
2 - Installed camloc in map box door
|
Details
|
|
|
09-23-2011
|
4.50
|
1 - Riveted panel and map box
|
Details
|
|
|
09-22-2011
|
2.50
|
Installed map box door
|
Details
|
|
|
09-21-2011
|
1.00
|
Cut out for Extreme EFIS
|
Details
|
|
|
09-19-2011
|
1.50
|
Installed trim indicator and ELT button
|
Details
|
|
|
09-19-2011
|
2.50
|
Drilled holes for panel switches and LEDs
|
Details
|
|
|
09-18-2011
|
3.75
|
Installed Voyager, vents and DC outlets
|
Details
|
|
|
09-18-2011
|
4.75
|
Installed audio panel
|
Details
|
|
|
09-17-2011
|
6.00
|
Installed transponder
|
Details
|
|
|
09-17-2011
|
2.00
|
Installed passenger side stick grip
|
Details
|
|
|
09-16-2011
|
4.00
|
Installed pilot side stick grip
|
Details
|
|
|
09-15-2011
|
2.75
|
Installed map box
|
Details
|
|
|
09-14-2011
|
2.00
|
Installed cabin heat valve
|
Details
|
|
|
09-14-2011
|
1.75
|
Installed air filter box
|
Details
|
|
|
09-14-2011
|
2.00
|
Carb heat passthrough & panel reinforcement
|
Details
|
|
|
09-13-2011
|
2.75
|
Worked on mounting system for air filter box
|
Details
|
|
|
09-12-2011
|
3.25
|
Installed heat exchange muff
|
Details
|
|
|
09-12-2011
|
2.50
|
Completed heat exchange muff
|
Details
|
|
|
09-11-2011
|
3.25
|
Fabricated heat exchange muff
|
Details
|
|
|
09-10-2011
|
5.00
|
Fabricated air filter housing
|
Details
|
|
|
09-09-2011
|
3.00
|
Installed rubber baffle seals
|
Details
|
|
|
09-08-2011
|
1.75
|
Mounted 2.5" duct flange to carb bottom
|
Details
|
|
|
09-07-2011
|
2.00
|
Laid out panel design
|
Details
|
|
|
09-06-2011
|
2.50
|
Fitted the rubber baffle seal
|
Details
|
|
|
09-05-2011
|
0.00
|
Picture of swivel bolt mechanism
|
Details
|
|
|
09-05-2011
|
5.00
|
Installed mixture control
|
Details
|
|
|
09-05-2011
|
3.00
|
Installed carb heat control and removed all cables
|
Details
|
|
|
09-04-2011
|
6.00
|
Made mixture control bracket and carb bottom plate
|
Details
|
|
|
09-03-2011
|
10.00
|
Planning panel and electronics
|
Details
|
|
|
09-03-2011
|
4.50
|
Installed throttle and linkage
|
Details
|
|
|
08-30-2011
|
2.75
|
Installed reverse throttle linkage
|
Details
|
|
|
08-27-2011
|
4.00
|
Installed engine stand-offs & alternator belt
|
Details
|
|
|
08-27-2011
|
1.50
|
Engine stand-offs fabricated
|
Details
|
|
|
08-22-2011
|
4.50
|
Finished cowling installation
|
Details
|
|
|
08-21-2011
|
2.50
|
Installed camloc fasteners on lower cowling
|
Details
|
|
|
08-21-2011
|
4.50
|
Clecoed engine cowling in place
|
Details
|
|
|
08-20-2011
|
3.75
|
Fitted lower cowling panels
|
Details
|
|
|
08-19-2011
|
1.75
|
Make right side cowling templates
|
Details
|
|
|
08-18-2011
|
3.00
|
Attached cowling lower panel
|
Details
|
|
|
08-17-2011
|
2.25
|
Aligned top and bottom cowling panels
|
Details
|
|
|
08-16-2011
|
4.75
|
Positioned nosebowl
|
Details
|
|
|
08-02-2011
|
1.75
|
Finished top access panels
|
Details
|
|
|
07-31-2011
|
4.75
|
Access panels nearly complete
|
Details
|
|
|
07-30-2011
|
3.00
|
Access panel work
|
Details
|
|
|
07-19-2011
|
2.25
|
Riveted topskin panel access frames
|
Details
|
|
|
07-17-2011
|
4.75
|
Fabricated all parts for panel access
|
Details
|
|
|
07-16-2011
|
5.00
|
Cut access holes in forward top skin
|
Details
|
|
|
05-30-2011
|
2.50
|
Made canopy hinge cover - left side and misc.
|
Details
|
|
|
05-29-2011
|
2.00
|
Made cover for canopy hinge gap - right side
|
Details
|
|
|
05-28-2011
|
0.50
|
Top front skin put on for measurements
|
Details
|
|
|
05-28-2011
|
1.75
|
Remade center console
|
Details
|
|
|
03-19-2011
|
3.00
|
Dual sticks and instrument panel back in
|
Details
|
|
|
03-14-2011
|
1.50
|
Redrilled and riveted upright doublers
|
Details
|
|
|
03-13-2011
|
2.50
|
Completed seat installation and gear mounting
|
Details
|
|
|
03-09-2011
|
1.00
|
Broke hand riveter and quit in frustration
|
Details
|
|
|
03-07-2011
|
1.75
|
Riveted center spar in place
|
Details
|
|
|
03-06-2011
|
1.25
|
Reassembly and riveting begun
|
|
|
|
03-06-2011
|
1.75
|
Prepped and primed parts
|
Details
|
|
|
03-06-2011
|
2.75
|
Center spar reinforcements/attachments fitted
|
Details
|
|
|
03-05-2011
|
2.50
|
Added L angles to seat pans
|
Details
|
|
|
03-02-2011
|
1.50
|
Removed seat panels and arm rests
|
Details
|
|
|
02-28-2011
|
1.50
|
Installed upright doublers
|
Details
|
|
|
02-27-2011
|
3.00
|
Added front uprights to center spar
|
Details
|
|
|
02-26-2011
|
5.50
|
Installed new center spar rear uprights
|
Details
|
|
|
01-30-2011
|
2.75
|
Removed main gear to enlarge brake line ports
|
Details
|
|
|
01-29-2011
|
1.75
|
Installed left side doubler
|
|
|
|
01-29-2011
|
3.50
|
Installed bottom doubler and placed center spar
|
Details
|
|
|
01-25-2011
|
1.75
|
Installed right side doubler
|
Details
|
|
|
01-24-2011
|
0.00
|
Checked with ZAC on bolt spacing issue
|
Details
|
|
|
01-18-2011
|
2.25
|
Center spar soid riveted - mods complete
|
Details
|
|
|
01-17-2011
|
1.25
|
Top doubler backdrilled
|
Details
|
|
|
01-16-2011
|
4.25
|
Assembled center spar
|
Details
|
|
|
01-15-2011
|
3.50
|
Drilled rivet holes up to 1/4" bolts
|
Details
|
|
|
01-15-2011
|
1.75
|
Deburred, primed and painted center spar parts
|
|
|
|
01-14-2011
|
0.75
|
Added shims to dual stick uprights
|
|
|
|
01-13-2011
|
1.75
|
Almost finished with center spar mods
|
Details
|
|
|
01-11-2011
|
1.75
|
Drilled through bolt holes for outer uprights
|
Details
|
|
|
01-10-2011
|
1.00
|
Replaced dual stick uprights on center spar
|
Details
|
|
|
01-09-2011
|
3.75
|
Center uprights placed on center spar
|
Details
|
|
|
01-08-2011
|
3.50
|
Center spar mods begun
|
Details
|
|
|
12-04-2010
|
2.50
|
Temporary installed prop
|
Details
|
|
|
12-02-2010
|
1.50
|
Installed ignition wire to distributor
|
Details
|
|
|
12-01-2010
|
1.50
|
Installed oil lines to cooler
|
Details
|
|
|
11-29-2010
|
1.75
|
Mounted oil cooler
|
Details
|
|
|
11-28-2010
|
3.25
|
Moved alternator forward and mounted vertical baff
|
Details
|
|
|
11-27-2010
|
3.75
|
Installed exhaust system and worked on baffles
|
Details
|
|
|
11-26-2010
|
3.00
|
Added support tail to starter
|
Details
|
|
|
10-10-2010
|
3.25
|
Installed oil cooler baffling
|
Details
|
|
|
10-09-2010
|
8.00
|
Alternator mounted and baffling nearly complete
|
Details
|
|
|
10-08-2010
|
2.75
|
Started baffling work and alternator
|
Details
|
|
|
10-04-2010
|
1.00
|
Remounted engine
|
Details
|
|
|
10-03-2010
|
32.00
|
Brought my Corvair engine to life
|
Details
|
|
|
09-29-2010
|
3.00
|
Removed engine and packed for Corvair College 18
|
Details
|
|
|
09-08-2010
|
1.25
|
Removed solid rivets from center spar
|
|
|
|
09-07-2010
|
2.00
|
Removed center spar and separated it
|
Details
|
|
|
09-06-2010
|
1.75
|
Started center spar modifications
|
Details
|
|
|
09-06-2010
|
6.25
|
Right wing mods completed!
|
Details
|
|
|
09-04-2010
|
7.25
|
Reassembled right wing
|
Details
|
|
|
08-26-2010
|
2.50
|
Riveted aileron bellcrank support & placed L angle
|
Details
|
|
|
08-25-2010
|
2.50
|
Airleron bellcrank supports fitted and drilled
|
Details
|
|
|
08-24-2010
|
2.25
|
Riveted rear channel mods
|
Details
|
|
|
08-23-2010
|
3.00
|
Rear Channel mods drilled in place
|
Details
|
|
|
08-22-2010
|
1.75
|
Drilled aileron rod hole doubler
|
Details
|
|
|
08-12-2010
|
1.00
|
Enlarged rivets to A6 and replaced fuel tank fill
|
Details
|
|
|
08-11-2010
|
2.75
|
Replaced fuel tank and riveted nose skin
|
Details
|
|
|
08-08-2010
|
0.00
|
Fuel tank ready to install
|
Details
|
|
|
08-02-2010
|
1.75
|
Riveted nose skin to bottom of ribs
|
|
|
|
08-01-2010
|
6.00
|
Remade Front Upper Spar Doubler
|
Details
|
|
|
08-01-2010
|
6.00
|
Remade Front Upper Spar Doubler
|
Details
|
|
|
08-01-2010
|
4.50
|
Completed nose rib modifications
|
Details
|
|
|
07-25-2010
|
5.00
|
Nose ribs mounted
|
Details
|
|
|
07-24-2010
|
1.50
|
Remade nose rib angles
|
Details
|
|
|
07-21-2010
|
0.75
|
Started rib 2 mods
|
Details
|
|
|
07-04-2010
|
3.25
|
Mounted root doubler and rib #1
|
Details
|
|
|
07-03-2010
|
1.25
|
Remade root doubler
|
Details
|
|
|
06-28-2010
|
1.75
|
Botched the root doubler
|
Details
|
|
|
06-27-2010
|
2.75
|
Drilled root doubler
|
Details
|
|
|
06-26-2010
|
3.25
|
Bolted on new extrusion
|
Details
|
|
|
06-24-2010
|
1.50
|
Backdrilled extrusion
|
Details
|
|
|
06-23-2010
|
2.25
|
Solid rivets removed and extrusion in place
|
Details
|
|
|
06-22-2010
|
2.00
|
Started solid rivet removal in right wing
|
Details
|
|
|
06-21-2010
|
1.75
|
Right wing top skin removed
|
Details
|
|
|
06-20-2010
|
2.25
|
Started right wing modifications
|
Details
|
|
|
06-20-2010
|
1.75
|
Completed right aileron mods
|
Details
|
|
|
06-07-2010
|
1.75
|
More work on right aileron mod
|
Details
|
|
|
05-23-2010
|
3.25
|
Started right aileron mods
|
Details
|
|
|
05-22-2010
|
3.50
|
Finished and stored left wing
|
Details
|
|
|
05-21-2010
|
4.50
|
Installed left aileron
|
Details
|
|
|
05-20-2010
|
1.50
|
Installed balance arm in left aileron
|
Details
|
|
|
05-19-2010
|
2.25
|
Placed aileron ribs and balance arm
|
Details
|
|
|
05-18-2010
|
1.25
|
Started mod on left aileron
|
Details
|
|
|
05-06-2010
|
2.00
|
Left nav/position/strobe installlation complete
|
Details
|
|
|
05-04-2010
|
2.50
|
Misc. work on left wing
|
|
|
|
04-19-2010
|
2.50
|
Installed left nav/position/strobe
|
Details
|
|
|
03-25-2010
|
1.75
|
Started riveting topside nose skin
|
Details
|
|
|
03-24-2010
|
2.25
|
Riveted nose skin & replaced fuel tank
|
Details
|
|
|
03-21-2010
|
2.75
|
Riveted left wing top skin
|
Details
|
|
|
03-15-2010
|
2.25
|
L angles on top skin
|
Details
|
|
|
03-13-2010
|
4.50
|
Primed and riveted spar/bellcrank mods
|
Details
|
|
|
03-12-2010
|
1.75
|
L angles added to bottom skin
|
Details
|
|
|
02-28-2010
|
3.00
|
Completed aileron bellcarnk supports
|
Details
|
|
|
02-27-2010
|
4.25
|
Completed rear spar modifications
|
Details
|
|
|
02-25-2010
|
0.00
|
Assembled service cart for tools
|
Details
|
|
|
02-24-2010
|
1.00
|
Torqued wing mod bolts and repositioned wing
|
|
|
|
02-22-2010
|
6.00
|
Completed and bolted wing mods
|
Details
|
|
|
02-20-2010
|
4.00
|
Final drilling of wing root doubler/extrusion mods
|
Details
|
|
|
02-19-2010
|
2.00
|
Installed angles on rib 2
|
Details
|
|
|
02-18-2010
|
2.25
|
Located and drilled nose rib 1 angles
|
Details
|
|
|
02-17-2010
|
1.25
|
More challenges with nose rib 1
|
Details
|
|
|
02-16-2010
|
0.75
|
Located position for nose rib 1
|
Details
|
|
|
02-15-2010
|
1.50
|
Drilled top of new extrusion angle
|
Details
|
|
|
02-07-2010
|
6.00
|
Installed left wing root doubler
|
Details
|
|
|
02-04-2010
|
2.00
|
Backdrilled left wing extrusion angle
|
Details
|
|
|
01-23-2010
|
2.00
|
Drilled bolt holes where necessary
|
Details
|
|
|
01-18-2010
|
4.50
|
Removed spar rivets
|
Details
|
|
|
01-17-2010
|
3.50
|
Removed top skin left wing
|
Details
|
|
|
01-16-2010
|
2.00
|
Started wing mods on left wing
|
Details
|
|
|
01-16-2010
|
1.50
|
Cleaned off worktable for wing mods
|
Details
|
|
|
01-12-2010
|
1.50
|
Intake manifold installed
|
Details
|
|
|
01-12-2010
|
1.00
|
Engine mounted
|
Details
|
|
|
01-08-2010
|
1.00
|
Installed battery connector in firewall
|
Details
|
|
|
01-07-2010
|
1.50
|
Fabricated & installed coil wires
|
Details
|
|
|
01-06-2010
|
3.00
|
Installed breather outlet tube & condensers
|
Details
|
|
|
01-04-2010
|
35.00
|
Installed ignition coils
|
Details
|
|
|
01-03-2010
|
1.00
|
Made PVC chocks
|
Details
|
|
|
01-03-2010
|
0.75
|
Added hoses to oil breather
|
Details
|
|
|
01-02-2010
|
2.00
|
Installed oil separator and coil switcher
|
Details
|
|
|
12-30-2009
|
2.50
|
Made and installed panel stiffener angles
|
Details
|
|
|
12-29-2009
|
1.25
|
Installed firewall pass through
|
Details
|
|
|
11-29-2009
|
0.00
|
Moved Kitlog Pro to Macbook
|
Details
|
|
|
11-01-2009
|
1.50
|
Brake cylinder musical chairs
|
Details
|
|
|
10-31-2009
|
6.00
|
Added rigid fuel lines
|
Details
|
|
|
10-25-2009
|
6.00
|
Installed gascolator and fuel pumps
|
Details
|
|
|
10-24-2009
|
3.00
|
Started instrument placement
|
Details
|
|
|
10-21-2009
|
1.50
|
Installed rear housing and gold oil system
|
Details
|
|
|
10-10-2009
|
2.00
|
Engine Rear Housing Installed and Removed
|
Details
|
|
|
10-05-2009
|
1.75
|
More polishing on left rear fuselage
|
Details
|
|
|
10-04-2009
|
2.50
|
10 passes done on left rear fuselage
|
Details
|
|
|
10-03-2009
|
11.50
|
Pilot side front fuselage polished
|
Details
|
|
|
09-26-2009
|
6.75
|
Passenger side polishing complete
|
Details
|
|
|
09-24-2009
|
4.00
|
Finished right side middle of side skin
|
Details
|
|
|
09-23-2009
|
2.00
|
More polishing
|
Details
|
|
|
09-20-2009
|
4.50
|
Completed polishing rear top skin
|
Details
|
|
|
09-19-2009
|
4.50
|
Polished right front half of rear top skin
|
Details
|
|
|
09-19-2009
|
1.50
|
Installed horizontal stabilizer
|
Details
|
|
|
09-16-2009
|
1.75
|
Finished polishing back left side area of tail
|
Details
|
|
|
09-15-2009
|
2.75
|
Polished back right qtr of rear top skin
|
Details
|
|
|
09-13-2009
|
2.50
|
Polished back left qtr of rear top skin
|
Details
|
|
|
09-12-2009
|
2.50
|
Started polishing rear top skin
|
Details
|
|
|
09-11-2009
|
2.50
|
Started fuselage polishing
|
Details
|
|
|
09-07-2009
|
7.50
|
Riveted rear top skin and canopy flashing
|
Details
|
|
|
09-06-2009
|
5.50
|
Installed Horizontal Stabilizer
|
Details
|
|
|
09-05-2009
|
6.75
|
Canopy completed!
|
Details
|
|
|
09-03-2009
|
5.00
|
Misc. rear canopy flashing work
|
Details
|
|
|
08-30-2009
|
4.00
|
Completed front canopy & flashing riveting
|
Details
|
|
|
08-29-2009
|
5.75
|
Made canopy flashing and prepped for final rivetin
|
|
|
|
08-27-2009
|
1.25
|
Added more canopy weatherstripping
|
Details
|
|
|
08-15-2009
|
4.50
|
More canopy work
|
Details
|
|
|
08-09-2009
|
0.00
|
Rearranged shop
|
Details
|
|
|
08-08-2009
|
2.00
|
Canopy bottoms trimmed
|
Details
|
|
|
08-08-2009
|
1.25
|
Attached front seal to canopy
|
Details
|
|
|
08-04-2009
|
1.25
|
Front canopy drilled and clecoed
|
Details
|
|
|
08-03-2009
|
2.25
|
Final forward canopy installation begun
|
Details
|
|
|
08-02-2009
|
5.75
|
Canopy side covers complete
|
Details
|
|
|
08-01-2009
|
6.00
|
Canopy frame right side cover
|
Details
|
|
|
07-30-2009
|
1.75
|
Started on canopy side covers
|
Details
|
|
|
07-21-2009
|
2.50
|
More canopy trimming
|
Details
|
|
|
07-20-2009
|
2.00
|
Initial front canopy trimming
|
Details
|
|
|
07-19-2009
|
3.75
|
Installed forward matching rear canopy frame
|
Details
|
|
|
07-18-2009
|
10.50
|
Cut canopy and installed back half
|
Details
|
|
|
07-16-2009
|
1.75
|
Set canopy on 650 for the first time
|
Details
|
|
|
07-15-2009
|
0.00
|
Research on instrument flying
|
Details
|
|
|
07-14-2009
|
0.00
|
The canopy is here
|
Details
|
|
|
06-26-2009
|
1.50
|
Remade rear canopy gussets
|
Details
|
|
|
06-26-2009
|
1.25
|
Fabricated front canopy brackets
|
Details
|
|
|
06-20-2009
|
1.75
|
Made and installed rear canopy gussets
|
Details
|
|
|
06-20-2009
|
5.50
|
Installed panel side angles and bottom brackets
|
Details
|
|
|
06-19-2009
|
1.50
|
Tweaked and painted roll bar
|
Details
|
|
|
06-16-2009
|
2.75
|
Completed bottom brackets for gas shocks
|
Details
|
|
|
06-12-2009
|
11.25
|
Made and installed roll bar
|
Details
|
|
|
06-11-2009
|
2.00
|
Finished bending canopy frame tubes
|
Details
|
|
|
06-10-2009
|
3.25
|
Started bending canopy frame tubes
|
Details
|
|
|
06-09-2009
|
2.25
|
Made forms for canopy frame tubes
|
Details
|
|
|
06-07-2009
|
2.25
|
Reassembled canopy latch system
|
Details
|
|
|
06-05-2009
|
3.25
|
Canopy latch system complete
|
Details
|
|
|
06-04-2009
|
2.75
|
Cut slots and installed right canopy latch
|
Details
|
|
|
06-03-2009
|
0.00
|
Pictures of canopy lock tube installation
|
Details
|
|
|
06-03-2009
|
20.00
|
Canopy frame and latch tube system in place
|
Details
|
|
|
05-23-2009
|
1.75
|
Prepped for latch installation
|
Details
|
|
|
05-23-2009
|
4.00
|
Made parts related to canopy lock tube
|
Details
|
|
|
05-22-2009
|
0.00
|
Error on 650 canopy latch drawing
|
Details
|
|
|
05-22-2009
|
3.75
|
Completed canopy latches
|
Details
|
|
|
05-21-2009
|
2.50
|
Started canopy parts
|
Details
|
|
|
05-21-2009
|
0.00
|
Great online resource for builders
|
Details
|
|
|
05-10-2009
|
1.75
|
Installed flap motor and linkage - fuselage comple
|
Details
|
|
|
05-09-2009
|
3.50
|
Installed dual controls
|
Details
|
|
|
05-09-2009
|
4.00
|
Added steering rods and fixed rudder fairleads
|
Details
|
|
|
05-08-2009
|
3.50
|
My plane on gear!
|
Details
|
|
|
05-08-2009
|
2.50
|
Main gear attached
|
Details
|
|
|
05-07-2009
|
5.25
|
Main gear pre-fitted on right side
|
Details
|
|
|
05-04-2009
|
1.50
|
Installed nosewheel
|
Details
|
|
|
05-02-2009
|
1.50
|
Painted main gear and support
|
Details
|
|
|
05-02-2009
|
3.50
|
Airplane riveted!
|
Details
|
|
|
05-01-2009
|
5.00
|
Finished left side & pilot's seat
|
Details
|
|
|
04-30-2009
|
2.00
|
Right side riveted
|
Details
|
|
|
04-30-2009
|
6.50
|
Fuselage joined
|
Details
|
|
|
04-28-2009
|
3.50
|
Misc. jobs on fuselage reassembly
|
Details
|
|
|
04-25-2009
|
3.00
|
Reinstalled forward side skins
|
Details
|
|
|
04-25-2009
|
11.00
|
Installed brake cylinders & nose gear
|
Details
|
|
|
04-23-2009
|
3.75
|
Riveted cabin floor & installed rudder pedals
|
Details
|
|
|
04-17-2009
|
4.00
|
Installed engine mount
|
Details
|
|
|
04-14-2009
|
0.00
|
NTSB report on 601XL sent to FAA
|
Details
|
|
|
04-14-2009
|
3.00
|
Drilled and painted new lower engine mount fitting
|
Details
|
|
|
04-02-2009
|
2.50
|
Worked on seat area
|
Details
|
|
|
03-31-2009
|
4.00
|
More painting of cockpit parts
|
Details
|
|
|
03-29-2009
|
4.50
|
Joined front and rear fuselage w/ firewall
|
Details
|
|
|
03-28-2009
|
5.00
|
Painted and riveted firewall
|
Details
|
|
|
03-26-2009
|
4.50
|
Riveted rear fuselage
|
Details
|
|
|
03-24-2009
|
2.00
|
More fuselage reassembly
|
Details
|
|
|
03-23-2009
|
1.75
|
General fuselage work
|
Details
|
|
|
02-28-2009
|
5.00
|
Primed and painted welded parts
|
Details
|
|
|
02-28-2009
|
0.00
|
Learning oxyacetylene welding
|
Details
|
|
|
02-16-2009
|
3.00
|
Fuselage disassembly - Part Three (and final)
|
Details
|
|
|
02-15-2009
|
4.00
|
Fuselage disassembly - Part Two
|
Details
|
|
|
02-14-2009
|
8.50
|
Fuselage disassembly - Part One
|
Details
|
|
|
02-13-2009
|
3.00
|
Misc. fuselage prep
|
Details
|
|
|
02-11-2009
|
4.25
|
Made and installed step fairings
|
Details
|
|
|
02-10-2009
|
1.75
|
More installation of panel top skin
|
Details
|
|
|
02-10-2009
|
2.25
|
Finished installing panel top skin
|
Details
|
|
|
02-09-2009
|
4.25
|
Fabricated & installed panel top skin
|
Details
|
|
|
02-09-2009
|
1.50
|
Drilled panel side angles and started top skin
|
Details
|
|
|
02-08-2009
|
3.00
|
Made and temporarily placed panel side angles
|
Details
|
|
|
02-08-2009
|
0.75
|
Installed fairleads on rear frame channel
|
|
|
|
02-08-2009
|
2.00
|
Fabricated fairleads
|
Details
|
|
|
02-07-2009
|
4.50
|
Installed Dual Stick Controls
|
Details
|
|
|
02-07-2009
|
3.25
|
Fabricated and installed center console
|
Details
|
|
|
02-07-2009
|
3.75
|
Added diagonal L angles to rear side skins
|
Details
|
|
|
02-06-2009
|
1.00
|
Installed steps
|
Details
|
|
|
02-05-2009
|
4.00
|
Misc installations
|
Details
|
|
|
02-04-2009
|
5.25
|
More drilling and flap braces
|
Details
|
|
|
02-03-2009
|
4.25
|
Drilled miscellaneous holes to size
|
Details
|
|
|
02-03-2009
|
1.00
|
Drilled AN3 bolt holes in upper engine mount
|
Details
|
|
|
02-02-2009
|
3.75
|
Remade right front side skin
|
Details
|
|
|
02-01-2009
|
5.25
|
Made & installed firewall stiffener doubler
|
Details
|
|
|
01-31-2009
|
7.50
|
Miscellaneous fuselage wrap up items
|
Details
|
|
|
01-31-2009
|
0.00
|
1291.75 total hours (1.55 day/10.84 week)
|
Details
|
|
|
01-30-2009
|
5.50
|
Remade left front skin & installed vent
|
Details
|
|
|
01-30-2009
|
1.75
|
Joined front and back fuselage - left side
|
Details
|
|
|
01-29-2009
|
2.75
|
Joined front and back fuselage - right side
|
Details
|
|
|
01-28-2009
|
2.25
|
Drilled longeron splices
|
Details
|
|
|
01-27-2009
|
6.00
|
Remade and installed top skin
|
Details
|
|
|
01-27-2009
|
0.00
|
Part 2: Technique for matching bulkhead holes
|
Details
|
|
|
01-27-2009
|
0.00
|
Part 1: Technique for matching bulkhead holes
|
Details
|
|
|
01-27-2009
|
0.00
|
NOTE ON TOP SKIN DIMENSIONS
|
Details
|
|
|
01-25-2009
|
5.50
|
Started top skin installation
|
Details
|
|
|
01-23-2009
|
1.00
|
Installed linear actuator motor and rod
|
Details
|
|
|
01-23-2009
|
4.50
|
Installed flap assembly
|
Details
|
|
|
01-22-2009
|
2.25
|
Installed flap mount gusset
|
Details
|
|
|
01-22-2009
|
1.00
|
Fabricated and mounted flap mount gusset
|
Details
|
|
|
01-21-2009
|
2.25
|
Installed pilot side seat bottom
|
Details
|
|
|
01-20-2009
|
4.00
|
Installed passenger seat bottom
|
Details
|
|
|
01-18-2009
|
0.00
|
Corvair College 13 and my new engine
|
Details
|
|
|
01-12-2009
|
5.75
|
Completed arm rest area with seat belt attachment
|
Details
|
|
|
01-10-2009
|
0.50
|
Made template for arm rest sides
|
Details
|
|
|
01-10-2009
|
4.75
|
Made and placed arm rest sides & cover
|
Details
|
|
|
01-10-2009
|
1.50
|
Discovered error in plans for arm rest side
|
Details
|
|
|
01-10-2009
|
1.75
|
Added seat belt attachments
|
Details
|
|
|
01-09-2009
|
1.00
|
Left upper fuselage longeron doubler installed
|
Details
|
|
|
01-09-2009
|
1.75
|
Inventoried dual stick parts & studied plans
|
Details
|
|
|
01-09-2009
|
2.00
|
Installed torque tube and supports
|
Details
|
|
|
01-08-2009
|
1.00
|
Spliced front and rear upper longerons
|
Details
|
|
|
01-08-2009
|
3.25
|
Installed upper fuselage longeron doublers
|
Details
|
|
|
01-07-2009
|
4.00
|
Added center seat back channel & Ls
|
Details
|
|
|
01-06-2009
|
4.75
|
Finished baggage floor installation
|
Details
|
|
|
01-05-2009
|
3.25
|
Added baggage floor bracing and corners
|
Details
|
|
|
01-04-2009
|
3.25
|
Set bulkheads and prepped for baggage floor Ls
|
Details
|
|
|
01-04-2009
|
0.00
|
Great go-anywhere lighting solution
|
Details
|
|
|
01-04-2009
|
1.25
|
Drilled baggage floor L angles to side skins
|
Details
|
|
|
01-04-2009
|
3.50
|
Cut and fit baggage floor
|
Details
|
|
|
01-03-2009
|
4.75
|
Added L angles for baggage shelf
|
Details
|
|
|
01-01-2009
|
2.50
|
Upright channels & attach plates mounted
|
Details
|
|
|
01-01-2009
|
4.25
|
Made and added seat back side angles
|
Details
|
|
|
12-31-2008
|
3.50
|
Made new rear channel
|
Details
|
|
|
12-31-2008
|
1.50
|
Made new attach plates
|
Details
|
|
|
12-31-2008
|
0.00
|
Confirmation of modifications with ZAC
|
Details
|
|
|
12-31-2008
|
0.00
|
1190.75 total hours (1.48 day/10.38 week)
|
Details
|
|
|
12-17-2008
|
2.00
|
Reason to replace left front skin on fuselage
|
Details
|
|
|
12-17-2008
|
0.00
|
Approval from ZAC for changes
|
Details
|
|
|
12-16-2008
|
0.00
|
Reason for remaking wing attachment upright
|
Details
|
|
|
12-16-2008
|
0.00
|
Reason for remaking upright channels
|
Details
|
|
|
12-16-2008
|
2.50
|
Reason for remaking the attach plates
|
Details
|
|
|
12-13-2008
|
3.00
|
Prepped and primed rudder parts
|
Details
|
|
|
12-13-2008
|
2.00
|
Finished new 650 rudder
|
Details
|
|
|
12-12-2008
|
0.00
|
Great support from Zenith
|
Details
|
|
|
12-12-2008
|
2.75
|
Completed drilling rudder
|
Details
|
|
|
12-09-2008
|
3.50
|
Assembled trailing edge side of rudder
|
Details
|
|
|
12-08-2008
|
2.75
|
Assembled rudder skeleton
|
Details
|
|
|
12-07-2008
|
1.25
|
Fabricated rudder rear ribs #3 and #4
|
Details
|
|
|
12-06-2008
|
1.25
|
Remade rudder rear ribs #1 and #2
|
Details
|
|
|
12-06-2008
|
2.75
|
Fabricated vertical tail spar and doublers
|
Details
|
|
|
12-06-2008
|
1.75
|
Fabricated upper fuselage longeron doublers
|
Details
|
|
|
12-05-2008
|
3.75
|
Fabricated vertical tail leading & trailing edge s
|
Details
|
|
|
12-04-2008
|
1.75
|
Fabricated rudder rear ribs #1 and #2
|
Details
|
|
|
12-03-2008
|
2.00
|
Fabricated nose rib for new rudder
|
Details
|
|
|
12-02-2008
|
1.50
|
Completed baggage back bulkhead
|
Details
|
|
|
12-01-2008
|
2.25
|
First 650 part started- the baggage back bulkhead
|
Details
|
|
|
11-30-2008
|
0.00
|
1149 total hours (1.49 day/10.42 week)
|
Details
|
|
|
11-24-2008
|
8.00
|
Polished top of left wing
|
Details
|
|
|
11-22-2008
|
4.50
|
Plans on the way / polished left wing bottom
|
Details
|
|
|
11-16-2008
|
0.00
|
Moved out of Hanger 34
|
Details
|
|
|
10-31-2008
|
0.00
|
1136.5 total hours (1.47 day/10.31 week)
|
Details
|
|
|
09-30-2008
|
0.00
|
1136.5 total hours (1.47 day/10.32 week)
|
Details
|
|
|
09-20-2008
|
0.75
|
Replaced left gusset 6B10-4
|
Details
|
|
|
09-17-2008
|
1.75
|
Added nutplates and spar access covers
|
Details
|
|
|
09-16-2008
|
1.75
|
Added L angles to front seat panels
|
Details
|
|
|
09-15-2008
|
2.25
|
Drilled Wing Attachment Uprights & installed front
|
Details
|
|
|
09-14-2008
|
5.25
|
Bottom engine mounts and top longeron rivet line
|
Details
|
|
|
09-11-2008
|
3.25
|
Finished left front side and gussets
|
Details
|
|
|
09-10-2008
|
4.00
|
Front right side work moving ahead
|
Details
|
|
|
09-07-2008
|
9.00
|
Major progress on forward fuselage
|
Details
|
|
|
09-06-2008
|
4.50
|
Installed Wing Attachment Uprights
|
Details
|
|
|
09-06-2008
|
4.50
|
Added gussets
|
Details
|
|
|
09-04-2008
|
4.00
|
Gear uprights installed
|
Details
|
|
|
09-01-2008
|
1.50
|
Left forward side skin cut
|
Details
|
|
|
09-01-2008
|
1.25
|
Added main gear attachments
|
Details
|
|
|
08-31-2008
|
5.00
|
Cut new side skins and mounted right side
|
Details
|
|
|
08-31-2008
|
0.00
|
1092.75 total hours (1.47 day/10.32 week)
|
Details
|
|
|
08-30-2008
|
0.00
|
Note on angle of incidence
|
Details
|
|
|
08-30-2008
|
2.00
|
Leveled fuselage
|
Details
|
|
|
08-29-2008
|
0.00
|
Notes on using a laser level for alignment
|
Details
|
|
|
08-29-2008
|
3.25
|
Installed new gear channel
|
Details
|
|
|
08-28-2008
|
1.00
|
Fuselage deconstruction
|
Details
|
|
|
08-26-2008
|
0.00
|
Update on 601XL to 650 upgrade
|
Details
|
|
|
08-22-2008
|
0.00
|
Reinstalled Kitlog Pro
|
Details
|
|
|
08-11-2008
|
1.50
|
Confirmed placement of rear frame channel & attach
|
Details
|
|
|
08-10-2008
|
1.25
|
Success with aft bulkhead
|
Details
|
|
|
08-10-2008
|
3.00
|
Completed middle bulkhead
|
Details
|
|
|
08-09-2008
|
3.00
|
Almost made my aft bulkhead
|
Details
|
|
|
08-06-2008
|
1.75
|
Busy month away from building...but back
|
Details
|
|
|
07-31-2008
|
0.00
|
1071 total hours (1.51 day/10.56 week)
|
Details
|
|
|
07-06-2008
|
3.50
|
Completed gear attachment and upright installation
|
Details
|
|
|
07-05-2008
|
3.75
|
Side skins cut for spar & gear openings
|
Details
|
|
|
07-05-2008
|
4.00
|
Added main gear attachments and upright
|
Details
|
|
|
07-03-2008
|
1.50
|
Mounted rear seat support & instr. panel gussets
|
Details
|
|
|
07-03-2008
|
8.00
|
Instrument panel and front side skins added
|
Details
|
|
|
07-02-2008
|
4.50
|
Set rear frame channel and upper seat support
|
Details
|
|
|
07-01-2008
|
2.50
|
Remade rear frame channel
|
Details
|
|
|
06-30-2008
|
0.00
|
1043.25 total hours (1.54 day/10.76 week)
|
Details
|
|
|
06-27-2008
|
4.75
|
Attached front engine mounts and secured longerons
|
Details
|
|
|
06-27-2008
|
0.00
|
2nd Anniversary of my project
|
Details
|
|
|
06-26-2008
|
2.75
|
Added and leveled front top longerons
|
Details
|
|
|
06-25-2008
|
2.50
|
Fuselage off table and leveled
|
Details
|
|
|
06-24-2008
|
3.00
|
Joined front to rear fuse & set center spar
|
Details
|
|
|
06-23-2008
|
3.25
|
Completed wing jigs
|
Details
|
|
|
06-22-2008
|
3.00
|
Plywood templates and wing jig work
|
Details
|
|
|
06-21-2008
|
2.50
|
Rear fuselage skins bottom rivet line
|
Details
|
|
|
06-21-2008
|
0.00
|
Note on Project Status
|
Details
|
|
|
06-15-2008
|
1.00
|
Drilled rear fuselage holes to size
|
Details
|
|
|
05-31-2008
|
0.00
|
1020.5 total hours (1.57 day/11.01 week)
|
Details
|
|
|
04-30-2008
|
0.00
|
1020.5 total hours (1.65 day/11.56 week)
|
Details
|
|
|
04-26-2008
|
3.75
|
More wing jig parts
|
Details
|
|
|
04-25-2008
|
3.00
|
Painted beams and cut wing jig webs
|
Details
|
|
|
04-16-2008
|
1.50
|
Started wing jig part fabrication
|
Details
|
|
|
04-16-2008
|
0.75
|
Replaced rudder pedal bearing & flanged part
|
Details
|
|
|
04-05-2008
|
3.50
|
Added gear channel and rear seat panel
|
Details
|
|
|
04-01-2008
|
3.00
|
Mounted brake pedals
|
Details
|
|
|
03-31-2008
|
3.00
|
Mounted brake cylinders
|
Details
|
|
|
03-31-2008
|
0.00
|
1005 total hours (1.71 day/11.96 month)
|
Details
|
|
|
03-30-2008
|
2.00
|
Made brake cylinder supports
|
Details
|
|
|
03-30-2008
|
2.50
|
1,000 hour mark - installed lateral pedal bearings
|
Details
|
|
|
03-29-2008
|
0.00
|
Notes on moving rudder pedals forward
|
Details
|
|
|
03-29-2008
|
8.00
|
Fabricated new cabin floor & pedal bearing channel
|
Details
|
|
|
03-28-2008
|
1.50
|
Made cabin floor and began rivet layout
|
Details
|
|
|
03-28-2008
|
2.50
|
Finishing touches on firewall structure
|
Details
|
|
|
03-27-2008
|
0.50
|
Tweaked firewall flanges & checked level
|
Details
|
|
|
03-27-2008
|
3.25
|
Completed firewall structural supports
|
Details
|
|
|
03-25-2008
|
3.50
|
Formed firewall
|
Details
|
|
|
03-24-2008
|
1.25
|
Aligned firewall blank & form and drilled
|
|
|
|
03-23-2008
|
1.50
|
Work on firewall form block measurements
|
Details
|
|
|
03-22-2008
|
2.00
|
More mismatched parts & firewall test fit
|
Details
|
|
|
03-22-2008
|
2.75
|
Completed tail section
|
Details
|
|
|
03-21-2008
|
2.50
|
Secured HT attachments
|
Details
|
|
|
03-21-2008
|
4.25
|
Rudder cable fairing work
|
Details
|
|
|
03-20-2008
|
9.00
|
Reinforced tail area
|
Details
|
|
|
03-19-2008
|
3.50
|
Pre-drilled and attached rear side panels
|
Details
|
|
|
03-18-2008
|
1.25
|
Drilled right rear fuselage L angles
|
Details
|
|
|
03-18-2008
|
1.00
|
Began right rear side fuselage placement
|
Details
|
|
|
03-17-2008
|
2.00
|
Drilled L angles for right rear side
|
Details
|
|
|
03-16-2008
|
2.00
|
Fuselage Rear Side Skin discrepancy
|
Details
|
|
|
03-16-2008
|
1.00
|
Added two nutplates and deburred hinge area
|
Details
|
|
|
03-15-2008
|
0.00
|
Nutplate installation guide
|
Details
|
|
|
03-15-2008
|
5.75
|
Bottom access door installed
|
Details
|
|
|
03-11-2008
|
1.50
|
Test assembled rudder hinge
|
Details
|
|
|
03-10-2008
|
3.25
|
Made lower rudder hinge parts and began assembly
|
Details
|
|
|
02-29-2008
|
0.00
|
933.75 total hours (1.68 day/11.73 week)
|
Details
|
|
|
02-03-2008
|
5.50
|
Riveted fuselage bottom
|
Details
|
|
|
02-02-2008
|
6.00
|
Rear bottom fuselage assembled
|
Details
|
|
|
02-02-2008
|
1.75
|
Deburred and primed rear fuselage bottom
|
|
|
|
01-31-2008
|
0.00
|
920.5 hours (1.74 day/12.20 week)
|
Details
|
|
|
01-28-2008
|
4.00
|
Made upper and lower rear longerons
|
Details
|
|
|
01-27-2008
|
3.00
|
Placed supports on fuselage bottom
|
Details
|
|
|
01-27-2008
|
0.00
|
Moved horizontal stab to hangar
|
Details
|
|
|
01-26-2008
|
0.00
|
Moved wings to hangar
|
Details
|
|
|
01-26-2008
|
1.00
|
Attached front & rear H.T. frames
|
Details
|
|
|
01-25-2008
|
3.50
|
Finished polishing horizontal stabilizer/elevator
|
Details
|
|
|
01-21-2008
|
0.00
|
Visit to Ken Smith and his new 601XL
|
Details
|
|
|
01-21-2008
|
0.00
|
Picked up Grove gear, wheels and brakes
|
Details
|
|
|
01-20-2008
|
3.75
|
Polished bottom of horizontal stab/elevator
|
Details
|
|
|
01-19-2008
|
3.75
|
Polished rudder
|
Details
|
|
|
01-17-2008
|
2.75
|
Right flap polished
|
Details
|
|
|
01-16-2008
|
2.00
|
Finished polishing left flap bottom
|
Details
|
|
|
01-15-2008
|
2.25
|
Left flap topside polished
|
Details
|
|
|
01-14-2008
|
2.00
|
Leaning more about polishing
|
Details
|
|
|
01-12-2008
|
3.50
|
Started polishing
|
Details
|
|
|
01-05-2008
|
3.50
|
Made wing stand
|
Details
|
|
|
01-03-2008
|
1.75
|
Completed Horizontal Tail Frames and laid out skin
|
Details
|
|
|
01-02-2008
|
0.75
|
Tested Nuvite polishing
|
Details
|
|
|
01-02-2008
|
0.75
|
Sorted misc. fuselage parts
|
Details
|
|
|
01-01-2008
|
1.75
|
Left wing top skin riveted
|
Details
|
|
|
01-01-2008
|
3.75
|
Completed left wing riveting
|
Details
|
|
|
12-31-2007
|
8.25
|
Started riveting left wing
|
Details
|
|
|
12-31-2007
|
0.00
|
876.75 hours (1.76 day/12.35 week)
|
Details
|
|
|
12-22-2007
|
4.00
|
Riveted top skin
|
|
|
|
12-22-2007
|
4.00
|
Deburred, primed and reassembled right wing
|
Details
|
|
|
12-22-2007
|
3.75
|
Completed right wing
|
Details
|
|
|
12-20-2007
|
5.50
|
Finished wiring right wing & started deburring
|
Details
|
|
|
12-19-2007
|
0.00
|
Wings passed EAA tech inspection
|
Details
|
|
|
12-19-2007
|
1.25
|
Routed AOA differential pressure tubes
|
Details
|
|
|
12-19-2007
|
0.75
|
Routed aileron trim cable
|
Details
|
|
|
12-18-2007
|
2.00
|
Installed tank senders/fitting and tested tanks
|
Details
|
|
|
12-18-2007
|
1.25
|
Attached pitot LED wires and ground
|
Details
|
|
|
12-17-2007
|
4.25
|
Installed pitot nutplates and controller
|
Details
|
|
|
12-16-2007
|
4.25
|
Mounted conduit and ran wires
|
Details
|
|
|
12-15-2007
|
1.00
|
Installed left wing aileron bellcrank
|
Details
|
|
|
12-15-2007
|
3.50
|
Cut wire and made/mounted conduit brackets
|
Details
|
|
|
12-14-2007
|
2.25
|
Installed right wing aileron bellcrank and rod
|
Details
|
|
|
12-13-2007
|
1.50
|
Made first set of braided fuel lines
|
Details
|
|
|
12-13-2007
|
3.25
|
Installed AOA ports
|
Details
|
|
|
12-11-2007
|
1.50
|
Closed aileron trim tabs and prepped for AOA
|
Details
|
|
|
12-10-2007
|
0.25
|
Re-closed elevator trim tab system
|
Details
|
|
|
12-09-2007
|
4.00
|
Rewired aileron and elevator trim tabs
|
Details
|
|
|
12-08-2007
|
10.50
|
Finished aileron trim tab
|
Details
|
|
|
12-07-2007
|
0.00
|
Discovered the hand nibbler
|
Details
|
|
|
12-07-2007
|
3.75
|
Cut out for aileron trim tab and made horn angle
|
Details
|
|
|
12-04-2007
|
2.50
|
Made trim tab trailing edge skin and channel
|
Details
|
|
|
12-03-2007
|
2.25
|
Re-made left wing aileron access cover
|
Details
|
|
|
12-01-2007
|
3.75
|
Placed and pre-drilled flaps and ailerons
|
Details
|
|
|
12-01-2007
|
0.00
|
AOA port location determined
|
Details
|
|
|
11-30-2007
|
0.00
|
797.5 hours (1.71 day/11.98 week)
|
Details
|
|
|
11-25-2007
|
3.75
|
Right fuel tank in place
|
Details
|
|
|
11-25-2007
|
2.50
|
Added extra nose rib to right wing
|
Details
|
|
|
11-24-2007
|
4.50
|
Completed 1st access cover and opened right wing
|
Details
|
|
|
11-23-2007
|
1.00
|
Installed & tested right tank fuel sender
|
Details
|
|
|
11-23-2007
|
2.00
|
Installed & tested left tank fuel sender
|
Details
|
|
|
11-22-2007
|
6.50
|
Fit left wing fuel tank and prepped senders
|
Details
|
|
|
11-14-2007
|
0.00
|
Made arrangements for a hangar
|
Details
|
|
|
11-14-2007
|
1.25
|
Completed heated pitot access cover/mount install
|
Details
|
|
|
11-11-2007
|
5.25
|
Added nose rib and started fitting fuel tank
|
Details
|
|
|
11-04-2007
|
6.00
|
Installed right wing landing light & made pitot mo
|
Details
|
|
|
11-03-2007
|
4.75
|
Installed left wing fiberglass tip
|
Details
|
|
|
11-02-2007
|
0.00
|
Process for making landing light lens
|
Details
|
|
|
11-02-2007
|
4.50
|
Installed landing light in left wing
|
Details
|
|
|
10-31-2007
|
0.00
|
755.5 hours (1.73 day/ 12.13 week)
|
Details
|
|
|
10-30-2007
|
4.25
|
Made light support channel and cut hole
|
Details
|
|
|
10-29-2007
|
4.25
|
Made landing light lenses and riblets
|
Details
|
|
|
10-27-2007
|
1.50
|
Installed right wing fiberglass tip
|
Details
|
|
|
10-27-2007
|
0.00
|
Fuel tank update
|
Details
|
|
|
10-27-2007
|
5.00
|
Completed left leading edge placement & drilling
|
Details
|
|
|
10-26-2007
|
1.50
|
Determined top leading edge overlap and rivet line
|
Details
|
|
|
10-25-2007
|
0.50
|
Match drilled left wing top to front spar
|
Details
|
|
|
10-24-2007
|
5.00
|
Cut pitot access cover/hole & riveted left wing bo
|
Details
|
|
|
10-23-2007
|
2.50
|
Cut access holes in left wing bottom
|
|
|
|
10-21-2007
|
7.75
|
Drilled left wing leading edge
|
Details
|
|
|
10-20-2007
|
7.00
|
Made another leading edge skin, trimmed and primed
|
Details
|
|
|
10-17-2007
|
0.00
|
Fuel tanks arrive
|
Details
|
|
|
10-11-2007
|
4.25
|
Trimmed right wing tip
|
Details
|
|
|
10-10-2007
|
6.75
|
Placed and drilled leading edge skin top side
|
Details
|
|
|
10-09-2007
|
10.00
|
Riveted right wing bottom
|
Details
|
|
|
10-08-2007
|
7.75
|
Nearly ready to rivet right bottom skin
|
Details
|
|
|
10-07-2007
|
6.00
|
Attached nose ribs and trimmed nose skin bottom
|
Details
|
|
|
10-06-2007
|
9.00
|
Corrected alignment of left wing
|
Details
|
|
|
09-30-2007
|
0.00
|
672.5 hours (1.66/day 11.62/week)
|
Details
|
|
|
09-29-2007
|
5.25
|
Right wing bottom skin placed
|
Details
|
|
|
09-29-2007
|
4.75
|
Cut and placed right wing top skin
|
Details
|
|
|
09-24-2007
|
0.00
|
Proposed solution to wing skin mess-up
|
Details
|
|
|
09-23-2007
|
4.00
|
Drilled right wing top skin & discovered error
|
Details
|
|
|
09-22-2007
|
1.75
|
Cut remaining wing skins
|
Details
|
|
|
09-22-2007
|
3.00
|
Bent leading edge skins
|
Details
|
|
|
09-21-2007
|
2.50
|
Drilled left wing bottom skin
|
Details
|
|
|
09-20-2007
|
4.00
|
Cut and pre-drilled left wing bottom skin
|
Details
|
|
|
09-19-2007
|
1.50
|
Prepared left wing bottom for skin
|
Details
|
|
|
09-15-2007
|
11.00
|
Top skin attached
|
Details
|
|
|
09-14-2007
|
2.25
|
Right wing skeleton cleaned, primed and riveted
|
Details
|
|
|
09-14-2007
|
3.00
|
Right wing nose ribs attached
|
Details
|
|
|
09-14-2007
|
2.25
|
Attached rear channel and trimmed / cut hole
|
Details
|
|
|
09-13-2007
|
3.25
|
Right wing rear ribs attached
|
Details
|
|
|
09-11-2007
|
4.00
|
Left wing skeleton riveted
|
Details
|
|
|
09-10-2007
|
1.25
|
Drilled aileron hole and cut rear channel tip
|
Details
|
|
|
09-09-2007
|
2.75
|
Attached rear channel to rear ribs
|
Details
|
|
|
09-05-2007
|
0.00
|
Test fit rear channel to ribs
|
Details
|
|
|
09-05-2007
|
2.75
|
Attached nose ribs and drilled to size
|
Details
|
|
|
09-03-2007
|
1.50
|
Started placing nose ribs
|
Details
|
|
|
09-03-2007
|
6.00
|
Left wing rear ribs attached to main spar
|
Details
|
|
|
09-02-2007
|
7.00
|
Added L angles to rear ribs 1 to 4
|
Details
|
|
|
09-01-2007
|
1.50
|
Nose rib grommets drilled
|
|
|
|
09-01-2007
|
5.00
|
Installed Aileron Bellcrank Supports & Support Cha
|
Details
|
|
|
08-31-2007
|
0.00
|
Test assembly of entire wing spar structure
|
Details
|
|
|
08-31-2007
|
2.25
|
Cleaned and painted 60" 2x2 steel supports
|
Details
|
|
|
08-31-2007
|
0.00
|
592.25 hours (1.58/day 11.06/week)
|
Details
|
|
|
08-29-2007
|
2.75
|
Left wing dihedral set
|
Details
|
|
|
08-29-2007
|
0.00
|
Dihedral setting technique
|
Details
|
|
|
08-28-2007
|
5.00
|
Set dihedral on right wing spar
|
Details
|
|
|
08-26-2007
|
4.50
|
Test run on setting dihedral & drilling for bolts
|
Details
|
|
|
08-26-2007
|
3.50
|
Attached spar tips
|
Details
|
|
|
08-25-2007
|
2.00
|
Redo of rear channel splice
|
Details
|
|
|
08-25-2007
|
2.00
|
Rear channels complete
|
Details
|
|
|
08-24-2007
|
3.00
|
Rear Channels drilled
|
Details
|
|
|
08-24-2007
|
1.00
|
Completed wing rib support L angles
|
Details
|
|
|
08-23-2007
|
3.00
|
Completed bellcrank supports and aileron stops
|
Details
|
|
|
08-22-2007
|
4.00
|
Formed 2nd rear channel and misc.
|
Details
|
|
|
08-21-2007
|
1.50
|
More work on rear channel
|
Details
|
|
|
08-19-2007
|
6.00
|
More miscellaneous wing parts
|
Details
|
|
|
08-18-2007
|
8.00
|
Miscellaneous wing parts
|
Details
|
|
|
08-17-2007
|
0.00
|
Wing structure recap
|
Details
|
|
|
08-17-2007
|
2.50
|
Nose ribs complete
|
Details
|
|
|
08-16-2007
|
2.50
|
Finished left nose ribs
|
Details
|
|
|
08-15-2007
|
4.50
|
New nose rib form with metal faces
|
Details
|
|
|
08-14-2007
|
3.25
|
Trimmed and prepped all nose rib blanks
|
Details
|
|
|
08-13-2007
|
3.00
|
Marked nose ribs and experimented a bit
|
Details
|
|
|
08-12-2007
|
1.25
|
Test nose rib
|
Details
|
|
|
08-11-2007
|
7.50
|
Wing ribs complete
|
Details
|
|
|
08-11-2007
|
0.00
|
Lightening hole information
|
Details
|
|
|
08-10-2007
|
3.75
|
Completed forming wing ribs
|
Details
|
|
|
08-09-2007
|
0.00
|
Tested flanged lightening holes in wing ribs
|
Details
|
|
|
08-09-2007
|
3.00
|
Completed right #6 rib and both #5 ribs
|
Details
|
|
|
08-05-2007
|
1.50
|
Miscellaneous trimming and formed rib 6
|
Details
|
|
|
08-04-2007
|
2.50
|
Trimmed rib blanks
|
Details
|
|
|
08-04-2007
|
3.75
|
#7 to 9 wing ribs completed
|
Details
|
|
|
08-03-2007
|
2.00
|
Marked and drilled wing rib blanks
|
Details
|
|
|
07-31-2007
|
0.00
|
502.75 hours (1.46/day 10.23/week)
|
Details
|
|
|
07-30-2007
|
3.00
|
Rough cut nose and wing rib blanks
|
Details
|
|
|
07-30-2007
|
2.00
|
Formed first wing rib
|
Details
|
|
|
07-29-2007
|
1.50
|
Made nose rib form block
|
Details
|
|
|
07-29-2007
|
5.50
|
Completed wing rib form blocks
|
Details
|
|
|
07-28-2007
|
6.00
|
Work on wing rib forms
|
Details
|
|
|
07-26-2007
|
2.75
|
Match sanded wing rib edges
|
Details
|
|
|
07-25-2007
|
3.50
|
Rough cut wing rib form block & applied templates
|
Details
|
|
|
07-21-2007
|
4.00
|
Completed aileron bellcranks
|
Details
|
|
|
07-16-2007
|
1.75
|
Practiced riveting bellcrank
|
Details
|
|
|
06-30-2007
|
0.00
|
472.75 (1.51/day 10.57/week)
|
Details
|
|
|
06-16-2007
|
3.25
|
Fabricated aileron bellcrank parts
|
Details
|
|
|
06-15-2007
|
2.00
|
Center spar completed
|
Details
|
|
|
06-14-2007
|
3.50
|
Center spar riveted
|
Details
|
|
|
06-13-2007
|
2.00
|
Center spar parts cleaned and primed
|
|
|
|
06-12-2007
|
3.50
|
Center spar fabrication complete
|
Details
|
|
|
06-11-2007
|
2.75
|
Drilled all center spar uprights
|
Details
|
|
|
06-09-2007
|
1.00
|
Cut and marked uprights
|
Details
|
|
|
06-09-2007
|
1.50
|
Completed drilling webs to size
|
|
|
|
06-05-2007
|
1.00
|
Completed match drilling of bottom center spars
|
Details
|
|
|
06-04-2007
|
2.00
|
Top center spar caps match drilled & reamed
|
Details
|
|
|
06-03-2007
|
3.50
|
Center spar marked and drilled
|
Details
|
|
|
05-31-2007
|
0.00
|
438.75 hours (1.55/day 10.85/week)
|
Details
|
|
|
05-28-2007
|
1.50
|
Finished right wing spar
|
Details
|
|
|
05-27-2007
|
4.50
|
Solid riveting on right spar
|
Details
|
|
|
05-27-2007
|
2.00
|
Pre-assembled and bolted/clecoed spar
|
Details
|
|
|
05-26-2007
|
3.50
|
Right wing spar drilling complete
|
Details
|
|
|
05-26-2007
|
1.00
|
Right spar primed
|
|
|
|
05-26-2007
|
3.50
|
Right spar polished and cleaned
|
|
|
|
05-25-2007
|
1.75
|
Pre-drilled spar cap angles
|
|
|
|
05-25-2007
|
2.50
|
More spar drilling
|
Details
|
|
|
05-25-2007
|
3.50
|
Drilled misc spar parts to size
|
Details
|
|
|
05-22-2007
|
0.75
|
Completed pre-drilling of caps and doublers
|
Details
|
|
|
05-21-2007
|
2.25
|
Pre-drilled spar caps and one angle
|
Details
|
|
|
05-20-2007
|
3.00
|
Trimmed and sanded spar parts
|
Details
|
|
|
05-20-2007
|
0.00
|
420 hours to date
|
|
|
|
05-19-2007
|
3.50
|
Work on misc. right spar parts
|
Details
|
|
|
05-19-2007
|
0.75
|
Spot drilled upper and lower spar caps
|
Details
|
|
|
05-18-2007
|
1.50
|
Right spar lightening hole and caps/doublers
|
Details
|
|
|
05-17-2007
|
4.00
|
Marked and drilled right wing spar web
|
Details
|
|
|
05-06-2007
|
2.00
|
Left wing spar complete
|
Details
|
|
|
05-05-2007
|
6.00
|
Left wing spar riveting
|
Details
|
|
|
04-30-2007
|
0.00
|
399.25 hours (1.55/day 10.87 week)
|
Details
|
|
|
04-15-2007
|
3.50
|
Cut Center Spar Webs and OB spar cap angles
|
Details
|
|
|
04-15-2007
|
2.50
|
Bent Center Spar Webs
|
Details
|
|
|
04-14-2007
|
2.75
|
Cut web blank for right OB spar
|
Details
|
|
|
04-13-2007
|
2.50
|
Started riveting left OB spar
|
Details
|
|
|
04-12-2007
|
4.00
|
Learned standard riveting technique
|
Details
|
|
|
04-07-2007
|
5.00
|
Riveting problems - spar ruined
|
Details
|
|
|
04-06-2007
|
11.00
|
OB spar parts polished, cleaned and primed
|
Details
|
|
|
03-31-2007
|
0.00
|
368 hours (1.62/day 11.35/week)
|
Details
|
|
|
03-27-2007
|
3.00
|
Completed drilling outboard spars
|
Details
|
|
|
03-22-2007
|
1.00
|
Completed drilling left top spar cap angle
|
Details
|
|
|
03-21-2007
|
2.00
|
Center Spar Complete
|
Details
|
|
|
03-20-2007
|
4.50
|
Replaced center spar upright rivets
|
Details
|
|
|
03-19-2007
|
3.00
|
Completed 1st step drilling and all right top hole
|
Details
|
|
|
03-18-2007
|
2.75
|
Step one drilling on 6-14 rivets complete
|
Details
|
|
|
03-18-2007
|
5.50
|
Spar cap angles placed and pre-drilled
|
Details
|
|
|
03-18-2007
|
0.50
|
Final drilling procedure chosen
|
Details
|
|
|
03-17-2007
|
5.25
|
Placed and drilled nose rib angles and hat stiffen
|
Details
|
|
|
03-17-2007
|
2.00
|
Center spar riveted
|
Details
|
|
|
03-16-2007
|
2.00
|
Riveted caps to rear web
|
Details
|
|
|
03-15-2007
|
1.50
|
Practiced solid riveting
|
Details
|
|
|
03-15-2007
|
2.50
|
Cleaned and primed center spar parts
|
Details
|
|
|
03-13-2007
|
2.25
|
Practiced solid riveting
|
Details
|
|
|
03-13-2007
|
0.75
|
Drilled rear web and bottom spar cap out to larger
|
Details
|
|
|
03-12-2007
|
6.50
|
Center spar ready to prime and rivet
|
Details
|
|
|
03-11-2007
|
2.00
|
Center Spar drilled and aligned
|
Details
|
|
|
03-10-2007
|
5.50
|
Work on Center Spar bolt and rivet drilling/alignm
|
Details
|
|
|
03-10-2007
|
3.50
|
Completed bending center spar webs (front & rear)
|
Details
|
|
|
03-09-2007
|
3.00
|
Completed hat stiffeners and spar tips
|
Details
|
|
|
03-07-2007
|
2.25
|
Cut and lightened spar tips
|
Details
|
|
|
03-06-2007
|
1.00
|
Made lightening holes in web spars
|
Details
|
|
|
03-06-2007
|
0.00
|
Adjustable Hole Cutter
|
Details
|
|
|
03-03-2007
|
0.00
|
Full-length bending brake
|
Details
|
|
|
03-03-2007
|
8.00
|
Completed Top & Bottom Spar Cap Angles
|
Details
|
|
|
03-03-2007
|
0.00
|
Completed spar cap angles - Part 2
|
Details
|
|
|
03-02-2007
|
1.50
|
Completed all blanks for spars
|
Details
|
|
|
03-02-2007
|
1.25
|
Bent nose rib angles
|
Details
|
|
|
03-01-2007
|
3.50
|
Cut blanks for nose rib & spar cap angles plus cen
|
Details
|
|
|
02-28-2007
|
0.00
|
291.50 hours (1.49/day 10.41/week)
|
Details
|
|
|
02-27-2007
|
2.50
|
Completed pre-drilling wing spars
|
Details
|
|
|
02-26-2007
|
1.75
|
Finished pre-drilling right wing caps and doublers
|
Details
|
|
|
02-25-2007
|
1.25
|
Spot drilled caps and doublers
|
Details
|
|
|
02-25-2007
|
3.25
|
Completed pre-drillling right bottom cap and doubl
|
Details
|
|
|
02-24-2007
|
0.00
|
Received Corvair engine mount
|
Details
|
|
|
02-24-2007
|
3.50
|
Flanged and marked left outboard spar web
|
Details
|
|
|
02-24-2007
|
2.50
|
Cut spar caps and doubler (also center spar caps)
|
Details
|
|
|
02-24-2007
|
3.00
|
Completed matched pre-drilling of OB spar webs
|
Details
|
|
|
02-17-2007
|
4.00
|
Cut wing spar webs
|
Details
|
|
|
02-04-2007
|
3.50
|
Ailerons finished - all control surfaces complete!
|
Details
|
|
|
02-03-2007
|
2.50
|
Final drilling on right aileron
|
Details
|
|
|
02-03-2007
|
6.50
|
Ailerons ready to prime and rivet
|
Details
|
|
|
02-02-2007
|
6.00
|
Laid out, cut and pre-drilled ailerons
|
Details
|
|
|
01-31-2007
|
0.00
|
251.25 hours (1.5/day 10.47/week)
|
Details
|
|
|
01-30-2007
|
2.25
|
Flaps completed
|
Details
|
|
|
01-29-2007
|
1.25
|
Deburred and cleaned right flap parts
|
Details
|
|
|
01-28-2007
|
4.25
|
Left flap complete
|
Details
|
|
|
01-27-2007
|
5.00
|
Located and drilled flap hinges
|
Details
|
|
|
01-20-2007
|
6.50
|
Flaps ready for hinges
|
Details
|
|
|
01-18-2007
|
2.00
|
Flap rib lines and rivet pitch laid out
|
|
|
|
01-16-2007
|
2.10
|
Made both aileron skins
|
Details
|
|
|
01-16-2007
|
1.50
|
Made 2nd flap skin
|
Details
|
|
|
01-16-2007
|
0.00
|
Bend Line Calculator addition ready for testing
|
Details
|
|
|
01-15-2007
|
2.50
|
Completed first flap skin
|
Details
|
|
|
01-15-2007
|
1.50
|
Calculated bend lines for flap skins
|
Details
|
|
|
01-13-2007
|
0.00
|
Why scratch build...why not scratch build
|
Details
|
|
|
01-13-2007
|
2.00
|
Completed flap ribs
|
Details
|
|
|
01-13-2007
|
2.00
|
Completed aileron tips
|
Details
|
|
|
01-13-2007
|
2.00
|
Completed aileron ribs
|
Details
|
|
|
01-12-2007
|
3.50
|
More work on flap ribs
|
Details
|
|
|
01-07-2007
|
1.50
|
Completed Flap and Aileron Rib Forms
|
Details
|
|
|
01-02-2007
|
1.25
|
Began flap and aileron ribs
|
Details
|
|
|
12-31-2006
|
0.00
|
210.15 hours (1.52/day 10.66/week)
|
Details
|
|
|
11-30-2006
|
0.00
|
210.15 hours (1.52/day 10.66/week)
|
Details
|
|
|
11-12-2006
|
0.75
|
Temporarily connected and tested trim rocker & LED
|
Details
|
|
|
11-11-2006
|
3.25
|
Completed Empennage
|
Details
|
|
|
10-31-2006
|
0.00
|
206.15 hours (1.64/day 11.45/week)
|
Details
|
|
|
10-30-2006
|
2.00
|
Drilled out rivets and positioned new hinge
|
Details
|
|
|
10-29-2006
|
2.00
|
Riveted the elevator
|
Details
|
|
|
10-28-2006
|
2.50
|
Riveted bottom and part of top skin flange
|
Details
|
|
|
10-28-2006
|
4.00
|
Disassembled, deburred & primed elevator
|
Details
|
|
|
10-28-2006
|
8.25
|
Completed assembly of elevator & trim tab
|
Details
|
|
|
10-26-2006
|
3.00
|
Completed the Elevator cut out and bent strip
|
Details
|
|
|
10-24-2006
|
4.25
|
Installed upper and lower elevator horns
|
Details
|
|
|
10-22-2006
|
5.75
|
Completed all remaining elevator parts
|
Details
|
|
|
10-21-2006
|
3.00
|
Drilled rest of elevator and clecoed to stabilizer
|
Details
|
|
|
10-21-2006
|
4.25
|
Completed Upper & Lower Elevator Horns
|
Details
|
|
|
10-20-2006
|
0.00
|
Prepared 4' steel tube work supports
|
Details
|
|
|
10-20-2006
|
1.75
|
Predrilled skins and attached ribs from bottom
|
Details
|
|
|
10-19-2006
|
1.50
|
Made Elevator Center Channel & installed L angles
|
Details
|
|
|
10-19-2006
|
3.00
|
Attached ribs to back and laid out rivet lines
|
Details
|
|
|
10-18-2006
|
1.25
|
Fixed the Elevator Skin Flange
|
Details
|
|
|
10-17-2006
|
1.00
|
Made form blocks for Elevator Ribs
|
Details
|
|
|
10-17-2006
|
5.00
|
Made elevator ribs and attempted elevator skin
|
Details
|
|
|
10-15-2006
|
3.50
|
Riveted tip ribs and pre-drilled fiberglass tips
|
Details
|
|
|
10-14-2006
|
7.25
|
Completed Stabilizer
|
Details
|
|
|
10-11-2006
|
5.50
|
Riveted stabilizer bottom skin
|
Details
|
|
|
10-10-2006
|
2.75
|
Secured Skeleton to table & made skin template
|
Details
|
|
|
10-09-2006
|
3.00
|
Cleaned, primed and riveted stabilizer skeleton
|
Details
|
|
|
10-09-2006
|
1.00
|
Bent Stabilizer Skin
|
Details
|
|
|
10-06-2006
|
0.00
|
Attended FWF Workshop with William Wynne
|
Details
|
|
|
10-04-2006
|
1.75
|
Drilled center ribs to spar, L angle and deburred
|
Details
|
|
|
10-03-2006
|
3.00
|
Made attachment doublers and drilled front spar
|
Details
|
|
|
10-03-2006
|
1.00
|
Deburred and reassembled rear spar
|
Details
|
|
|
10-02-2006
|
2.50
|
Front Spar and Front Spar Attachments Remade
|
Details
|
|
|
09-30-2006
|
0.00
|
122.40 hours (1.29/day 9.02/week)
|
Details
|
|
|
09-29-2006
|
2.50
|
Drilled Stab Skeleton rivet holes to size
|
Details
|
|
|
09-29-2006
|
1.00
|
Added L angles to ends of stab spars
|
Details
|
|
|
09-28-2006
|
0.00
|
Added 4x4 legs to worktable and leveled
|
Details
|
|
|
09-25-2006
|
2.25
|
Drilled and clecoed stabilizer skeleton
|
Details
|
|
|
09-24-2006
|
1.00
|
Rear Spar Upper Doubler redone
|
Details
|
|
|
09-24-2006
|
4.50
|
Measured, drilled and clecoed rear spar
|
Details
|
|
|
09-23-2006
|
6.75
|
Metal cutting experiments and rear spar parts redo
|
Details
|
|
|
09-22-2006
|
0.00
|
Added shop lights and expanded to workbench
|
Details
|
|
|
09-19-2006
|
1.50
|
Finished stabilizer front spar assembly
|
Details
|
|
|
09-19-2006
|
2.50
|
Completed rear spar assembly
|
Details
|
|
|
09-18-2006
|
2.50
|
Started stabilizer front spar assembly
|
Details
|
|
|
09-17-2006
|
0.75
|
Modified end rib forms to make center ribs
|
Details
|
|
|
09-17-2006
|
2.15
|
Completed stabilizer end ribs
|
Details
|
|
|
09-17-2006
|
4.50
|
Completed stabilizer center ribs
|
Details
|
|
|
09-16-2006
|
2.00
|
Remade rear spar attachment
|
Details
|
|
|
09-16-2006
|
3.75
|
Front spar attachment & rear spar attachment
|
Details
|
|
|
09-14-2006
|
3.00
|
End rib and attachment forms
|
Details
|
|
|
09-09-2006
|
4.25
|
Marked and pre-drilled front and rear stabilizer s
|
Details
|
|
|
09-09-2006
|
0.00
|
Bought and assembled/adjusted new drill press
|
Details
|
|
|
09-07-2006
|
1.50
|
Made Horizontal Stabilizer Rear Spar
|
Details
|
|
|
09-06-2006
|
1.25
|
Made Front Spar for Horizontal Stabilizer
|
Details
|
|
|
09-06-2006
|
2.00
|
Completed spar doublers, shim and standard angles
|
Details
|
|
|
09-05-2006
|
1.25
|
Cut blanks for spar doublers & made 6T1-7HD
|
Details
|
|
|
09-04-2006
|
1.50
|
Rudder riveted and complete
|
Details
|
|
|
09-04-2006
|
1.50
|
Cleaned primer from exterior areas
|
Details
|
|
|
09-04-2006
|
1.50
|
Cleaned and primed skins
|
Details
|
|
|
09-03-2006
|
0.50
|
Prepared Rear Rib #3 for re-drilling
|
Details
|
|
|
09-03-2006
|
0.75
|
Deburred all rudder parts
|
|
|
|
09-03-2006
|
4.75
|
Added leading edge skin and drilled all holes
|
Details
|
|
|
09-02-2006
|
3.00
|
Trimmed bottom of trailing edge skin and pre-drill
|
Details
|
|
|
09-02-2006
|
0.75
|
Riveted Rudder Skeleton
|
Details
|
|
|
09-02-2006
|
0.75
|
Primer touch-up on rudder skeleton
|
|
|
|
09-02-2006
|
2.75
|
Drilled and clecoed trailing edge rudder skin
|
Details
|
|
|
09-01-2006
|
2.25
|
Prepped and primed rudder skeleton
|
Details
|
|
|
09-01-2006
|
0.00
|
Completed Revisions on Bend Line Spreadsheet
|
Details
|
|
|
08-31-2006
|
0.00
|
51.50 hours (0.79/day 5.55/week)
|
Details
|
|
|
08-30-2006
|
1.00
|
Made Stabilizer Tip Ribs
|
Details
|
|
|
08-29-2006
|
0.75
|
Deburred and cleaned rudder parts
|
Details
|
|
|
08-28-2006
|
0.00
|
Contact with PTI re: Zinc Chromate
|
Details
|
|
|
08-27-2006
|
0.75
|
Re-drilled rudder skeleton rivet holes
|
Details
|
|
|
08-26-2006
|
2.50
|
Remade rib #1 and reinstalled
|
Details
|
|
|
08-25-2006
|
2.50
|
Pre-drilled and clecoed rudder skeleton
|
Details
|
|
|
08-25-2006
|
1.50
|
Final fabrication of tip and nose ribs
|
Details
|
|
|
08-25-2006
|
1.00
|
Cut spar doubler angles and marked spar and angles
|
Details
|
|
|
08-23-2006
|
0.75
|
Remade Vertical Tail Tip Rib
|
Details
|
|
|
08-23-2006
|
1.00
|
Completed Vertical Tail Tip Rib
|
Details
|
|
|
08-23-2006
|
1.75
|
Completed Doubler Angles and Bent Strip
|
Details
|
|
|
08-22-2006
|
2.00
|
Redo of rib 1 and fabrication of rudder nose rib
|
Details
|
|
|
08-20-2006
|
5.75
|
Completed Vertical Stabilizer Rear Ribs
|
Details
|
|
|
08-19-2006
|
3.00
|
Routed/chamfered forms and attempted rudder horn
|
Details
|
|
|
08-19-2006
|
3.00
|
Completed Vertical Tail (Rudder) Horn
|
Details
|
|
|
08-18-2006
|
1.50
|
Rough cut form blanks for rudder ribs
|
Details
|
|
|
08-16-2006
|
0.00
|
Created Bend Allowance Spreadsheet
|
Details
|
|
|
08-15-2006
|
0.50
|
Bent Trailing Edge Rudder Skin
|
Details
|
|
|
08-14-2006
|
2.00
|
Cleaned and stored engine parts
|
Details
|
|
|
08-12-2006
|
6.00
|
Disassembled and partially cleaned Corvair engine
|
Details
|
|
|
08-12-2006
|
0.50
|
Bent Leading Edge Rudder Skin
|
Details
|
|
|
08-12-2006
|
0.00
|
Bending brake painted
|
Details
|
|
|
08-11-2006
|
0.00
|
Prep bending brake for painting
|
Details
|
|
|
08-10-2006
|
0.00
|
Research on Welding
|
Details
|
|
|
08-09-2006
|
3.00
|
Cut Rudder Skins
|
Details
|
|
|
08-08-2006
|
1.75
|
Bent Vertical Tail Spar
|
Details
|
|
|
08-07-2006
|
0.00
|
Watched Rudder Workshop DVD
|
Details
|
|
|
08-06-2006
|
0.00
|
Completed Bending Brake
|
Details
|
|
|
08-06-2006
|
1.00
|
1st successful bend
|
Details
|
|
|
08-05-2006
|
0.00
|
Picked Up Parts for 10' Bending Brake
|
Details
|
|
|
08-05-2006
|
0.00
|
Bottom and Top Plates of Bending Brake in place
|
Details
|
|
|
08-01-2006
|
0.00
|
Pickup Corvair engine
|
Details
|
|
|
07-31-2006
|
0.00
|
8.0 hours (0.24/day 1.65/week)
|
Details
|
|
|
07-30-2006
|
0.00
|
Picked up and cleaned metal bandsaw
|
Details
|
|
|
07-27-2006
|
0.00
|
Found Corvair engine
|
Details
|
|
|
07-27-2006
|
1.50
|
1st airplane part complete
|
Details
|
|
|
07-26-2006
|
2.00
|
Second attempt at rib
|
Details
|
|
|
07-25-2006
|
0.00
|
More CAD printing
|
Details
|
|
|
07-24-2006
|
0.00
|
Unistalled automatic compressor drain
|
Details
|
|
|
07-23-2006
|
0.00
|
Entered more CAD drawings
|
Details
|
|
|
07-22-2006
|
0.00
|
Installed automatic drain in compressor
|
Details
|
|
|
07-22-2006
|
0.00
|
General work area prep
|
Details
|
|
|
07-21-2006
|
0.00
|
Plotted CAD drawings of ribs 1-9
|
Details
|
|
|
07-21-2006
|
0.00
|
Completed work table
|
Details
|
|
|
07-20-2006
|
0.00
|
Produced CAD drawings of Ribs 1-9
|
Details
|
|
|
07-18-2006
|
4.50
|
First form block and rib
|
Details
|
|
|
07-17-2006
|
0.00
|
Finished work table design & ordered parts
|
Details
|
|
|
07-16-2006
|
0.00
|
Installed KitLog Pro 2.0
|
Details
|
|
|
07-12-2006
|
0.00
|
Mallets for bending metal
|
Details
|
|
|
07-11-2006
|
0.00
|
Zenith tool kit arrives
|
Details
|
|
|
07-11-2006
|
0.00
|
The elusive Olfa P-800 found
|
Details
|
|
|
07-11-2006
|
0.00
|
Re-watched Scratch Building DVDs
|
Details
|
|
|
07-09-2006
|
0.00
|
Hitachi Router
|
Details
|
|
|
07-08-2006
|
0.00
|
Purchased and setup Ridgid Oscillating Belt Sander
|
Details
|
|
|
07-07-2006
|
0.00
|
Trip to Aircraft Spruce
|
Details
|
|
|
07-07-2006
|
0.00
|
Found Craigslist - bought band saw & drill press
|
Details
|
|
|
07-06-2006
|
0.00
|
Air Compressor Purchase and Setup
|
Details
|
|
|
06-27-2006
|
0.00
|
Factory tour and 601XL plans
|
Details
|
|
|
06-22-2006
|
0.00
|
Watched Scratch Building DVDs
|
Details
|
|
|
06-21-2006
|
0.00
|
Demo Flight over the South Bay Area
|
Details
|
|
|
06-20-2006
|
0.00
|
Read William Wynne's Corvair Flight Engines Manual
|
Details
|
|